Assigned Plan Evaluator’s Signature DATE: TIME IN: TIME OUT:
PLUMBING
1. Provide Site Development Plan 5. Provide / Comply to Application Documents
2. Provide Plumbing / Sanitary Plans: a. Secure Sanitary / Plumbing Permit with a. Water Supply Layout ( Hot & Cold, as required) signature and dry seal of professionals and b. Sewer / Soil Pipe Line Layout applicant. c. Drainage Layout b. Clear Copy of Valid PRC ID and Updated PTR d. Storm Water Drainage Layout c. Fill-out completely the Plumbing Permit e. Isometric Drawings of the systems Application Form (Check Marked) 3. Plumbing / Sanitary Details d. Provide Clearances from the National Water a. Area Drain / Catch Basin - must be watertight Resources Board (as required). b. Plumbing Fixtures Mounting & Connection Details e. Secure ECC from DENR-EMB. c. Pipe Diameter & Specifications d. Septic Tank / Vault Details: 6. Reflect Septic Tank / Underground Tank on Foundation i. Provide 3-Chamber Septic Tank (Watertight) – Plan for Structural Evaluation since it is located under as per GSC Septage Ordinance Parking Area / Driveway ii. Install Tee Inlet, Partitions and Outlet iii. Manhole minimum dimension: 508 mm x 508 mm 7. Provide Rain Water Collection Tank iv. Invert level of inlet pipe shall not be less than as per GSC Rainwater Ordinance 50.8mm than the invert of outlet. v. Digestive Chamber Min. L = 1500 mm, W = 900 mm 8. Provide Water Tank & Booster Pump for Uniform vi. Digestive Chamber shall not be less than 2/3 of Water Pressure and indicate capacity. total tank capacity while Leaching Chamber shall not Submit installation detail (as required). be less than 1/3 of total tank capacity. vii. Air Space = 230 mm minimum, 9. Cost Estimates and Specifications Liquid Depth = 600 mm min – 1800 mm max 10. Settle Comments of Architectural re: _________. viii. Submit Septic Tank Design Basis / Calculation 11. Settle Comments of _______________________. ix. For Pre-fabricated Septic Tank - Submit Material 12. Provide General Notes, Legend. Data Sheet (must be accredited by AITECH/DOST/DOH) 13. Submit Approved Building Permits and Plans. 14. Other Details as deemed necessary (specify): 4. Provide Water Treatment Prior Disposal: __________________________________________________ a. Grease Trap / Oil & Water Separator __________________________________________________ b. Waste Water Treatment Facility (WWTF) / STP __________________________________________________ & indicate sizes and dimension (as required) __________________________________________________ i. Submit WWTF/STP Design Basis __________________________________________________ i. WWTF / STP Process Flow __________________________________________________ __________________________________________________