Professional Documents
Culture Documents
ARCHITECTURAL
see CBA 25.4 for finishes - verify ID for finishes,
updated location of slop sink ledge, added pvc
Common Toilet Blow-up Plan
doors and chb partitions for showers, removed
CBA 25.1 screens facing office
see CBA 25.4 for finishes - verify ID for finishes,
Common Toilet Blow-up Reflected Ceiling Plan updated ceiling fan locations, added security
screen windows
added overhangs, added supports for clerestory
windows, removed fixed windows and updated to
solid CHB wall, updated firewall length, updated
Common Toilet Lower Roof Plan
roof slope, proposing to owner to use thermoplastic
roofing, if not approved - to use approved
CBA 25.2
sandwich panel roofing
added clerestory windows, updated firewall length,
proposing to owner to use thermoplastic roofing, if
Common Toilet Upper Roof Plan
not approved - to use approved sandwich panel
roofing
reflected added overhangs and clerestory
Common Toilet Blow-up Section 1
windows and roofs
CBA 25.3 Common Toilet Blow-up Section 2 increased toilet wall/ firewall height, updated roof
framing, removed fixed windows and updated to
Common Toilet Blow-up Section 3 CHB wall
CBA 25.4 Door and Window Schedule kindly request shop drawings from supplier
If you have further questions please call our office. Thank you.
Prepared by:
Wyllden Oliver T. Uy
Junior Architect
Noted by:
Y5
Y6
X3 X4
1 BLOW-UP PLAN X5
Y5
Y6
X3 X4 X5
CBA
25.2
X3 X5 X6
652.41 mm
1 BLOW-UP SECTION 1
Y6 Y5
Y6 Y5
314 mm
299.57 mm
564 mm
150 mm
3 BLOW-UP SECTION 3
2 BLOW-UP SECTION 2
CBA
25.3
HINGES:
ABC
CBA
25.4