You are on page 1of 29

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/324746404

Municipal Solid Waste Co-processing in Cement Industry: Innovative models


for Scale up

Article · June 2016

CITATIONS READS

0 500

1 author:

Ritu Bharadwaj
Institute for Industrial Productivity
14 PUBLICATIONS   5 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Knowledge Partnership Project View project

Watershed Mission, NREGA View project

All content following this page was uploaded by Ritu Bharadwaj on 25 April 2018.

The user has requested enhancement of the downloaded file.


Knowledge Exchange Platform
Promoting Energy Efficiency through Best Practices in Industries covered under the
Perform Achieve & Trade (PAT) Scheme
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

INSIDE
INSIDE
 Message of Economic Adviser, Ministry Mr. Raj Pal
of Power, Government of India Economic Adviser,
Ministry of Power
 Municipal Solid Waste Co-processing
in Cement Industry: Innovative
Message
models for scale up
 Best Practice Case Studies Warm greeting to industry friends and colleagues!
• Vedanta Limited, Jharsuguda India formally joined the Paris climate change agreement on Gandhi Jayanti, taking the global pact a step
• Raymond Limited, Chhindwara closer to its enactment. As India reaffirms its global leadership on tackling climate change, I would like
to congratulate the efforts made by our Industry friends and colleagues in making Perform Achieve and
• Shree Cement Limited Trade (PAT) scheme a success, which has made a huge contribution in propelling India on a low carbon
• JK Lakshmi Cement Limited growth trajectory. While the PAT scheme sets a powerful example on how individual industry level efforts
and commitment to energy conservation and efficiency can contribute to making India energy secure,
• Raymond Limited, Jalgaon the targets achieved by the industry have set international benchmark on achieving energy efficiency
 BEE’s financing initiatives in many sectors. The industry has already set to overachieve first PAT cycle specific energy consumption
targets by 30% and I am happy to note that through the ‘Knowledge Exchange Platform (KEP)’ we were
 Technology gap assessment of the able to support the industry in realizing these targets by building a knowledge economy and inspiring
industries to focus on strategies and solutions that can enhance their energy productivity. This role of
Pulp and Paper Sector and the scope KEP will become particularly important for new industries and sectors that have been covered under the
for UK technology suppliers in this second PAT cycle, where the challenge will be to replicate the success achieved so far and to create a smart
economy reinforced by green manufacturing and production.
industry
As Industry braces itself to achieve the targets under the second cycle of PAT, there will be a need to bring
 Interventions of ESCO-based Steam in knowledge and enhance access to new and innovative technologies and services that help them to
Supply Services in a Process Industry improve their energy performance on a continuous basis. To realise this potential, KEP has initiated sector
wise technology gap assessment and mapping of best available international technologies to bridge
- the Success Story of Kaleesuwari the information gap. To compliment this process, we have also created a searchable database on energy
Refinery (KRPL) efficiency technologies, service providers and technology supplier’s among host of other resources that
can help industry choose from a range of options and guide the users on best technologies suited for their
 KEP Journey in last one year industry. Recently, we brought the industry, technology suppliers and other important stakeholders on
a common platform to exchange knowledge on technology options and approaches through a National
Supported by Seminar cum Technology Exhibition organized on 7th to 8th November, 2016 and I would like to thank my
industry partners for their wholehearted participation in this event.
I would also like to commend the pro activeness and support extended by the industry in joining hands with
KEP in promoting peer to peer learning and exchange of best practices through sector level workshops and
technology exhibitions. So far, we have organized sector level workshops for all the existing PAT sectors.
I hope that we will be able to continue with this effort to cover all sectors and deliver significant energy
efficiency benefits by promoting adoption of cost effective efficiency measures. Cross sectoral knowledge
transfer and active learning has also been high on our agenda and we have facilitated this effort through
friendly energy efficiency exchange visits in thermal power and cement sectors.
The award winning paintings of children who participated
We aim to evolve KEP as an Industry led forum for knowledge transfer on energy efficiency and I will
in National Level Painting Competition -2016 organised by
Bureau of Energy Efficiency, Ministry of Power, Government
encourage you to write to us and provide feedback on how we can make KEP more effective and responsive
of India, are presented here. Paintings of Suswagata Sutra to this effect.
Dhar (Tripura), Arighna Saha (Tripura), Pukhram Rojiya
Devi (Manipur), Christina Biswas (West Bengal), C Vaishnavi
(Andhra Pradesh), Devashish Dabral (Uttarakhand),
G Amora Mercy (Tamilnadu), Telen Khaidem (Manipur) and
Laiphrakpam Rohit (Manipur) appear below in the same
order..
Raj Pal
2 NEWSLETTER For circulation within the KEP network only ISSUE-6, SPECIAL EDITION-ENMS 2016

Municipal Solid Waste Co-processing in Cement Industry:


Innovative models for Scale up
– By Mr. Somnath Bhattacharjee & Ms. Ritu Bharadwaj

Effective management and disposal for waste disposal. Local Municipal


Potential benefits of
of Municipal Solid Wastes (MSW) has Authorities responsible for handling
Co-processing RDF
already reached a stage of major concern wastes face severe challenges, significant
in India, as in many other countries among them being scarcity of funds, Co-processing of MSW in cement
around the world. Rapid urbanisation, inherent institutional weaknesses, lack plants has the potential to effectively
uncontrolled population growth and of capacity and knowledge on choice of address many waste disposal
rising per capita income is only going challenges facing the country.
method/ technology for waste disposal.
to add to this problem. The significance • Addressing local environment
issues by reduction of MSW going
of the issue can be understood from MSW Co-processing in for landfills.
the high priority accorded by the Prime Cement Plants: an effective
• Addressing health and social
Minister of India, Narendra Modi under solution issues by breaking cycle of
the Swachh Bharat Abhiyaan (Clean
India Campaign). This campaign is India’s In a situationas grim as this, it becomes diseases resulting from unhygienic
biggest ever cleanliness drive where imperative to look at customized non- conditions.
eminent people from different walks of conventional solutions involving all • Creating sustainable livelihood
life are being encouraged to promote stakeholders responsible for solid waste option for the informal sector
it. But the challenge is huge. The total management. Making Refuse Derived involved in waste picking, sorting
and recycling by making these
estimated generation of MSW in India is Fuel (RDF) from MSW and using it
operations organized.
about 68 million tonnes (2011-12) from gainfully as a fuel in cement plants is one
urban sources alone. MSW generation such sustainable long-term solution. RDF • GHG reduction potential by
from major Indian states is illustrated replacing coal in cement kilns.
is the dry organic fraction of MSW which
Additional GHG reduction through
in Figure 1. The generation of MSW can be recovered by treating MSW using
methane avoidance from landfill.
is estimated to reach 221MT in 2030, Mechanical Biological treatment. RDF
with a per capita increase of 1 to 1.33% • Huge Coal saving potential by
comprises of plastics, paper, cardboard,
using waste in place of coal for
annually. cloth, wood, rubber, leather, etc. This
cement manufacture
option represents a win-win situation by
Landfill/ Waste dumps or open burning
way of reducing coal usage in cement
(60%- 90%) continue to be the principal than 80% of the conventional fuel is
manufacture on one hand and in finding
method of waste disposal causing severe being replaced with RDF.
a long-term sustainable solution for
health hazard, continuous emission
managing urban waste effectively on the
of harmful gases and environmental Models of MSW
other. As illustrated in Figure 1, states like
degradation. Despite adverse impacts,
Maharashtra, Gujarat, Rajasthan, Andhra co-processing
land filling is expected to continue as
most widely adopted practice in coming Pradesh, Karnataka & Tamil Nadu, which
Institute for Industrial Productivity(IIP)
years, even though the major cities are produces large quantities of MSW also
commissioned a project to analyse
already facing problem of land availability have number of cement plants which
the issues and challenges facing RDF
can absorb the RDF in these states.
projects in India. Three different models
Figure 1: Share of major Indian States in However, despite many potential processing MSW to RDF for usage in
MSW generation
benefits, RDF usage is not getting scaled cement plants, were studied. These
upin India. Typically, RDF can replace up models were carefully selected to cover
to 15-20% of primary fossil fuels used projects that are being managed by
in cement plants. However, the current different types of stakeholders viz. (i)
thermal substitution rate (TSR) or the Municipal Corporation (Panjim Model);
rate of co-processing wastes in India (ii) an NGO (Sarthak Model); (iii) Cement
ranges between 0.5-1%, while in some manufacturer (Jaypee Model), to get
developed countries, this figure is as a range of perspective, understand
high as around 60%. There are some their implementation challenges and
cement plants in Europe where more review their comparative advantages/
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 3

disadvantages. Each of these models highly harmful for the environment and segregation. While this model is based
involve different actors in its operations, overall health of the inhabitants in the on an efficient technology, however,
handle different nature of waste and city. So, in order to improve the waste it is not financially viable for Jaypee. It
have varying degrees of mechanization management system and the working incurs INR 2500 (USD 41)per tonne on
in production process. conditions of rag-pickers a local NGO, processing of wastes and recovers only
Sarthak, initiated a project on MSW INR 1750 (USD 28.7)per tonne by way of
Panjim Model processing, which was supported by selling the product. Inadequate supply
The city of Panjimin Goa generates around Bhopal Municipal Corporation (BMC). of waste is another significant obstacle
60 tonnes of waste every day, and this BMC allocated land to Sarthak for solid faced by Jaypee in this project.
figure is rising at a rate of 5% every year. waste management and collection of
To handle this waste effectively, primary plastic waste. This initiative was started Comparison between the
segregation is done at the household level in five of the 70 management wards of three Waste Management
by providing separate bins for collecting BMC, and is now being implemented in 21 Models
and storing bio-degradable and non- wards, employing 1465 “SarthakKarmis”
(rag-pickers). The NGO has carried out A typical waste management process is
biodegradable wastes. The organic bio-
capacity building of Sarthak Karmison depicted in Figure 2, where the major
degradable waste is composted in pits to
waste management processes and has stages are demarcated as A, B, C & D. For
produce manure. The non-biodegradable
also linked them with social security an efficient waste management model,
wastethat constitutes about 12% of the
schemes. The Sarthak Karmiscarry out primary segregation (A) is an important
total waste, is further segregated into
recyclable and non-recyclable waste, by the collection and segregating of wastes,
which is transported to the processing Figure 2: Typical waste management
Municipal Corporation employees. About process
0.8 tonne per day of non-recyclable facility, where the waste is aggregated
wastes can be processed as RDF, however, into bundles of 100 kg. This process
the facility generates an average of generates 5-6 tonnes of RDF every day.
0.36-0.40 tonnes of RDF per day.Bales RDF is sold to cement plants at a rate
of RDF weighing about 100-110 kg are of INR 5.50 (USD 0.09)per Kg,for use as
transported from processing facility to fuel. Till now, nearly 2000 metric tons
cement companies for use as fuel. of plastic bags have been used as fuel
in cement plants, saving nearly 5,000
Although the project has greatly tonnes of GHG emission from burning of
enhanced the effectiveness of the plastic waste. Furthermore, rag-pickers
waste management system in the city, have been employed, in a job that pays
the model is not sustainable. While the them an income higher than what they
total cost incurred by Municipality is INR were earning earlier. Discussions with
1100 (USD 18)per tonne, it derives no local cement companies reveal that
revenues from this activity as the RDF they are generally happy with this, but
is supplied to the cement companies in order to be sustainable, cost effective
free of cost. The revenues obtained and scalable this model needs to
through “sanitation fees” levied by the promote primary segregation of wastes
Municipality is able to cover only 12-15% at the household level.
of the total cost of this project.
Jaypee Model
Sarthak Model
Chandigarh city generates about 400
The city of Bhopal in Madhya Pradesh tonnes of solid waste every day and to
generates around 420-460 tonnes of deal with the issue of its safe disposal,
MSW every day. About 5,000 rag pickers Jaypee Cement Industries has setup a
were involved in this city to segregate highly mechanized system, for the waste
the waste in an unhygienic manner that collection and processing in Chandigarh
was also hazardous to their health. The that caters to 70 % of the waste generated
plastic waste constituting around 14% in the city. The segregated waste
of the garbage, was dumped either at comprises of a mixture of plastic and
a centre near Bhopal-the state capital textile wastes, which is processed and
or burnt. Both these practices were converted into RDF without any primary
4 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Table 1: Management responsibility in different models with policy and regulatory barriers, many
of which are interlinked.
Process Panjim (Municipal Sarthak (NGO) Model Jaypee (Private
Corporation) Model Company) Model IIP India has launched a multi-stakeholder
A Household- Source Trained rag pickers Not done initiative to draw up a stakeholder-
Segregation designed ‘Implementable Action Plan’ (can
B Municipal Corporation Sarthak Municipal Corporation be downloaded from www.iipinetwork.
C Municipal Corporation Sarthak Jaypee org) for increasing the TSR in Indian
D State Government State Pollution Control Board Jaypee cement industry. In order to identify and
resolve the regulatory and policy issues,
step. The management arrangement and Increasing TSR in cement industry offers IIP had created a Forum of Regulators
responsibility for each stage of waste not only huge opportunity for reducing with high level representation from State
management in different models is fossil fuel usage but also in addressing the Pollution Control Boards of major cement
presented in Table 1. issue of local as well as global emissions. producing states in India. The Forum of
The time is right to launch a structured Regulators (FoR) reviewed the provisions
One of the major issues identified for campaign for AFR, keeping in mind the
impeding the rapid scale up in all the of existing policy and regulatory
following recent developments. guidelines and came out with a series of
three model is the poor financial viability
i. Government of India has pledged to five White Paper Compendium (can be
of these projects.The salient feature of
higher targets for emission intensity downloaded from www.iipinetwork.org),
these models on key financial parameter is
reduction in the Nationally Determined based on which the Central Pollution
depicted in Table 2.
Contribution (NDC), which would Control Board (CPCB) has now set up
a ‘National Task Force (NTF) on Co-
Way forward translate in to greater push for
processing’, to take the recommendations
manufacturing sectors like cement to
The Indian cement industry has made reduce their emission intensity of the Forum forward, which provides the
significant improvements in its energy much needed framework to deal with
ii. More challenging targets to cement some of the pressing regulatory and policy
efficiency and productivity in the recent
industry under second cycle of Perform barriers. While NTF reviews the policy
years. However, the Thermal Substitution
Achieve and Trade (PAT) scheme implies and regulatory provision to enhance the
Rate (TSR) or the use of Alternate Fuels
that the industry will have to look at use of AFR, it is important to draw policy
and Raw Materials (AFRs) for cement
opportunities like AFR to achieve these learnings from other countries, which have
manufacture, remains extremely low.
targets. been successful in enhancing the TSR rate.
India which is the second largest producer
of cement in the world after China, is likely The UK Landfill Tax is seen as one such key
The GHG mitigation cost through
mechanism for increasing TSR in cement
to see its cement capacity of 350 Million AFR use is reasonable, and there is a
industry by making it financially more
Tonnes per annum (Mta) double over the significant replication potential across
viable compared to the cost of landfill.
next decade, resulting in a huge surge the entire cement industry in India. The
in coal demand. This demand for coal is other associated co-benefits include an Consultations with Cement industry
projected to increase in the range of 63 –to effective and efficient means of managing show that they are willing to invest in
96 Million Tonnes (MT) during 2012 – 2017 urban and industrial waste, which is technologies that can help them increase
as per the Planning Commission’s 12th increasingly becoming a cause for major the TSR (while helping them meet their
Plan Report on cement industry. The role concern. The relatively low use of AFR PAT targets). In a recently (Sept., 2016)
of AFRs to replace coal therefore assumes is diagnosed to be due to a number of conducted UK study tour under Knowledge
great significance against this backdrop. technical and financial issues coupled Exchange Platform (KEP) initiative, the
Indian cement industry representatives
Table 2: Financial performance of different models were exposed to such technologies for
Parameters Panjim(Municipal Sarthak (NGO) Jaypee (Private waste co-processing, their economics
Corporation) Model Model Company) Model and benefits. KEP will continue to provide
Cost/ tonne RDF 1100/ 18.33 5000 / 83.33 2500 / 41.67 information on similar technological
(INR/ USD) options available for enhancing TSR. The
Selling Price/ tonne Not estimated 5500 / 91.67 1750 / 29.17 cement industry will however need to
RDF (INR/ USD) capitalize on these opportunities for not
Major Costs Wages for Wages for Sarthak Processing of just achieving scale of energy efficiency,
municipal workers, Karmis, Waste waste using capital GHG mitigation and coal savings,but in
Transportation of collection and intensive machinery also contributing to the society by gainfully
RDF segregation utilising MSW/Solid waste.
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 5

Energy Management System Implementation

Vedanta Limited, Smelter Plant1


– Mr. Bijneswar Mohanty(AVP, Head Cast house & Energy Management) ,
Mr. Ramesh Chandra Patro(Associate Manager, Coordinator Energy Cell)

Introducing the Plant achieve significant reductions in energy performance of the plant periodically.
consumed.
Vedanta Ltd. (VL), Jharsuguda, is an Our team is actively involved in spreading
associate company of the FTSE 100 The top management’s role in awareness about energy conservation
diversified resources group Vedanta implementing and maintaining such a in the community and in industry: we
Resources Plc, listed on the London Stock system is vital and incudes, also conduct workshops at national level.
Exchange. Originally incorporated in  Formation of an Energy Cell (Fig 1.) Vedanta organized the first aluminum
2001, Vedanta is a leading producer of comprising a three-layer structure: sector KEP (Knowledge Exchange
metallurgical grade alumina and other an apex committee, core committee, Platform) workshop involving all players
aluminium products, catering to a wide coordinating committee and Small in the aluminium industry, research
spectrum of industries. The aluminium Group Activities (SGA) team. (refer institutes, and the Bureau of Energy
smelting unit at Jharsuguda has carved to attached Annexures 1 and 2, for Efficiency, Government of India.
out a niche for itself in the aluminium details of the Energy Cell and Energy Energy review and planning
industry with its superior product quality Management Team’s roles and
based on energy efficient state-of-the- responsibilities). The energy review is the heart of this
art technology. The firm operates a 0.5 management system. All aspects of the
 Defining an energy policy taking into
MTPA aluminium smelter and a 1215 MW EnMS depend on it so proper energy plans
account all organizational and legal
captive power plant supported by highly and reviews are a must for successful
requirements.
modern infrastructure at this location in implementation of EnMS. An energy
Odisha.  Appointing a management review exercise is conducted every year.
representative (MR) and Energy The energy planning process includes:
In the quest to meet high quality Manager to drive the system.
standards and the best of Health, a. Identification of different energy
 Defining the roles and responsibilities streams used in our plant.
Safety and Environment systems, the
of the MR and Energy Manager.
company hasput into place an integrated b. Analysis of energy use and
management system (IMS) and is certified  Establishing energy objectives and consumption.
for: ISO 9001, ISO 14001, and OHSAS 18001 targets according to energy policy
c. Determination of areas of significant
and ISO 50001. and providing necessary resources for
achieving them. (necessary
Development strategies adopted resources include approvals for Figure 1: Formation of Energy Cell
for implementing ISO 50001, CAPEX (capital expenditure)
Energy Management System and OPEX (operational
expenditure) proposals
Development Strategies:
aimed at implementing
At Vedanta, we believe that teams are energy saving projects,
always better than individuals and computerization of all energy
systematic tools are more fruitful than reports, energy-efficient
solitary ideas. Cross-functional team procurement, design, etc., and
involvement in Focused Improvement training human resources).
Projects to improve energy performance  Training all plant personnel
by optimizing processes, innovating, in energy conservation
implementing new ideas, and also using awareness.
the latest technology, have all helped
 Reviewing the energy
6 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Use of Professional Expertise


During the implementation stage an
energy consultant guided our team in
developing energy review formats, trained
the internal auditor, provided information
about best practices in other industries,
all of which helped us develop a robust
system not only for complying with all
the requirements of an EnMS but also for
achieving national benchmarking figures
of energy consumption.
We are also encouraging our engineers
Human resources are the key to success to go through the BEE-certified Energy
in any organization, hence it is of utmost Auditor’s course and we now have eight
importance to train them and develop government-certified energy auditors and
skills. To enable focusing on this, our policy managers.
mandates every department to conduct
training sessions on energy conservation. 2. Training by faculty within the
The HR department conducts training organization
programmes and monitors their
As per the internal training calendar,
energy use and consumption (by Pareto effectiveness.
in-house specialists provide refresher
method). 1. Training by external agencies training for internal auditors, and EnMS, as
d. Analysis of past and present energy also in areas such as:
Agencies from outside the organization
consumption, so as to determine the  Energy savings in pump and motors
were called in to train the Energy Cell
baseline for each area.
team in techniques of energy auditing,  Energy efficiency in pot cells.
e. Analysis of relevant variables impacting energy management and energy saving in  Energy efficient lighting, etc.
significant energy use. different kinds of equipment.
f.
Identifying opportunities for 3. Tool Box talks cover energy
Training on the following topics was conservation awareness for shop floor
improvement.
carried out by external agencies personnel
g. Setting out objectives and targets. mentioned alongside:
Tool box talks are organized each
The energy review exercise involved the  Energy auditing techniques: CII
fortnight for shop floor technicians and
Energy Cell team: the energy consumption  Energy saving in utilities: FICCI operators, on energy savings, deviation
of motors, lights, different parts of the
 Energy management training: CII reporting and control, to communicate
process, furnaces, etc.,were measured
of the energy policy, objectives and
using a power analyzer and recorded for Internal
 auditor training: GRK
targets, etc.
analysis. This procedure was followed for enterprises
all types of energy streams.  Lead auditor training program: SGS Online e-testsare being organized to
evaluate the competence of all employees
To monitor energy performance, energy
who are significantly impacting energy.
performance indicators (EnPI) were
We also invite vendors to participate
defined for each area, and,based on
in workshops and demonstrate energy
past and present energy consumption,
efficient products and educate our Energy
baselines were set for each EnPItaking the
Cell team members by exposing them to
average energy consumption over a year.
national international symposiums.
A list of opportunities was drawn up using
audits, brainstorming sessions, sharing
Tools and resources
best practices, etc., and then priorities The Jharsuguda plant of Vedanta has a
set, based on conditions such as payback, value-driven culture with strong business
feasibility, process impact. drivers such as Six Sigma, Quality Circles,
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 7

Figure 2: SCADA based energy monitoring system


Annual energy cost 1634.66 lakhs INR
savings
Cost to implement 224 lakhs INR
Payback period 2 months

Lessons Learned
• Team work at all levels of Energy Cell
needed for successful implementation.
• Software tools such as Minitab, Ampla,
etc., used for energy monitoring and
data analysis.
• Robust auditing techniques of EnMS
necessary.
• Best practices sharing between
business unit and sub-business unit
level.
Kaizen, asset optimization, sustainability, before and after the training. To increase • Internal and external benchmarking to
IMS, and 5S in place. It is also equipped awareness, posters and dashboards are set high standards.
with advanced IT-based applications displayed on the shop floor. • Error-free data management and
such as MES online report generation, documentation system development.
SAP-based energy efficient product Approach to determine energy
procurement, and e-based document performance improvement and • Effective use of resources.
management systems. validate results
Improvements after EnMS (ISO 50001)
Before implementing the energy saving implementation
A SCADA-based energy monitoring system
in which all energy meters are connected projects, the SGA team of our Energy • Cohesive Energy Management team
to one server, generates reports. Portable Cell measured energy consumption and Energy Cell developed.
flow meters and power meters are used to and other process parameters such
• Small Group Activities (SGA) given
analyze deviations at a particular load. as pressure, flow, temperature, and
more importance. Employees from all
recorded them in a specified format.
levels are involved and suggestions
Steps taken to maintain All these parameters, including energy,
received from all levels for listing of
operational controland current, voltage, etc., were again
opportunities (LOOP) to improve
sustain energy performance measured (after implementation) to
energy performance.
improvement. enable a comparison. The results were
verified by an internal auditor/central •
Top management awareness,
While the EnMSwas being implemented, involvement and commitment
EnMS coordinator.
we reviewed all work instructions (WI) increased.
and modified them so as to meet the Details of the modifications along with
• Policy developed and acted upon.
requirements of ISO 50001. The impact photographs and other data are recorded
of energy performance of each item of in a specified format for reference and • Objectives established for all
equipment in the process was analyzed. the final result verified by the Energy departments and targets assigned.
The operating / control limits of each Manager. Around 15 objectives and 25
process were redefined so as to optimize management programs finalized and
energy consumption. A list of significantly Cost-benefit analysis communicated to all to achieve the
impacting activities was made by energy targets.
Cost-benefit is calculated on the basis
analyzing the WI and communicated of costs of the project, maintenance, • Energy saving opportunities identified
to workers on the shop floor to ensure operations, and finally comparing this and prioritized.
control. with savings due to reduced energy • Energy Baseline study conducted in
All WIs are communicated to shop floor consumption. scientific manner.
technician in training programmes • Performance monitoring through EnPIs
held periodically, with tests conducted (Energy Performance Indicators).
8 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

• Energy efficient procurement analysis • Energy linkage to Standard Operating


for all products by commercial team. Procedures (SOP) and Standard Mr. Dayanidhi
Maintenance Procedures(SMP) of Behera
• Measurement and monitoring system
Integrated Management System(IMS) Sr. Vice President &
strengthened.
and accordingly field operation Head Aluminium
• Management review for performance Operation, Vedanta
followed.
improvement. Ltd., Jharsuguda,
• Energy Dashboards maintained in all
• EnMS Tool Box talk being conducted. Odisha, Aluminium &
sections and departments.
• Inclusion of EnMS topics in induction Power Business
training of new employees. Vedanta Limited, Aluminium & Power
Business at Jharsuguda, is an early
adopter of ISO 50001 system and has
Team of Innovators been an ardent practitioner of Energy
Management System (EnMS) over
The team behind the successful implementation of the project wereMr. Bijneswar the years. We drive EnMS as a culture
Mohanty(AVP, Head Cast house & Energy Management), Mr. Mangu Srinivas (AGM, and we inculcate the same in all our
Rectifier), Mr. A Krishna Perumal ( Associate Manager, Bake Oven), Mr. Harish employees and associate partners as
Yadu (Manager, Cast House), Mr. Sridhar Nayak (Associate Manager, Utility) and Ms well. ISO 50001 has helped us to have a
Rashmiprabha Maharana (Associate, Rectifier). structured approach to formulate policy,
set objectives & targets and to improve
our energy performance continually
involving people at all level. I believe our
team is motivated and inspired enough
to see enormous drives towards energy
efficiency and energy conservation
measures to have a sustainable growth
with low carbon footprint.


NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 9

Energy Management System Implementation

Raymond Limited, Chhindwara Unit


– Mr. Jayant Joshi, General Manager (Engineering), Raymond Ltd, Chhindwara Division

Introducing the Plant Development strategies adopted total electrical energy consumed it was
for implementing ISO 50001, considered an area of significant energy
Incorporated in 1925, Raymond Limited
Energy Management System use. For each department, Energy
has five manufacturing divisions at Performance Indicators (EnPIs) were
present, which make products such Development phase: based upon the energy consumed per
as textiles, denim, engineering files • In order to have a well-defined and unit of production.
and tools, aviation, designer wear, functional energy management system, Use of Professional Experience:
prophylactics and toiletries. With a
the members of the organization
capacity of 45.28 million meters in wool The plant identified the level of training
should become conscious of energy
and wool-blended fabrics, Raymond for different personnel according to
consumption, conservation and
commands over 60% of the market share their job profile. The top management’s
wastage.
of worsted suiting in India, and ranks commitment to EnMS implementation
amongst the first three fully integrated • With a well-organized system for
was high and hence a management
manufacturers of worsted suiting in the collecting and measuring data in place,
representative (MR) was appointed with
world. consumption figures for different
immediate effect. The MR was given
departments were readily available, powers to make decisions with respect
The Chhindwara Unit is one of the three allowing a systematic approach to to the EnMS and he was also responsible
production units of the Textile Division; its understanding energy use. With this for assigning roles and responsibilities
installed capacity is 128 looms and 33528 data we were able to study our past to other members of the organization.
spindles as against the licensed capacity of consumption and finally, a baseline was The major resource was a team which
1500 looms and 50000 spindles. The unit, arrived at: the financial year, 2014-2015. comprised 15 experienced and dedicated
which became operational in 1991, has a
Analysis of the data suggested that members from all over the plant, specialists
work force of more than 2600. The plant
electricity was the form in which in their respective roles: this team was
is well equipped with the most modern
most energy was consumed. Hence, hence called the Energy Management
machinery, ensuring high efficiency and
monthly electricity consumption for all Team (EMT) with the MR as their leader.
productivity. The work force is skilled,
well- trained and competent. An in-house departments was recorded separately
The MR and EMT played key roles in
laboratory carries out quality tests on in- and the annual total was determined.
implementing the EnMS and hence
coming material, in-process material and This allowed determination of areas
specialized training by certified external
the final product. of significant energy use (SEU): if the
experts from the Bureau of Energy
area consumed more than 5% of the
Efficiency (BEE) on EnMS implementation
Figure 1: Share of different types/sources Figure 2: Apportionment of electricity and internal auditor training was arranged.
of energy used in the plant consumption in the plant
These members were, in turn, responsible
% Electricity Consumption for training the other staff members in
their departments. In particular, a number
Others of training sessions were arranged for
Lighting
Steam 2%
67334 MT
Electricity 4% ground level workers working in the SEU
54575271kWh
37.01%
38.90% area, because they were the first in line to
work on the machines and had a significant
Coal 9848 MT
23.68% role to play in energy conservation and
Utility Production preservation.
LPG
0.41 39% 55%

A clear communication system was set up


with details and updates on EnMS were
10 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

circulated to all concerned personnel via the availability of documents,


e-mail; all the latest documents, records needed to be checked. ISO 50001- EnMS Flow Chart
and data were placed on the intranet so as Raymond Limited – Textile Division-Chhindwara Madhya Pradesh

to be accessible to all staff members. Notice ISO 50001 and the PAT
Preparation
scheme
March 2015
boards were also used to intimate workers
Energy Policy
of progress; control was maintained September 2015
After implementing ISO 50001,
throughout by using passwords to protect Training Stakeholder September 2015
the plant was able to reduce its
all relevant documents on the intranet.
energy consumption by 9.81% MR - Appointment September 2015

Workers were trained on the process flows during the 1st PAT cycle. EnMS Team - Formation September 2015

of the machines. They were also given


proper instructions about how to operate Cost-benefit analysis EnMS Manual September 2015

Baseline Data, Objectives & Targets September 2015


the machine efficiently. For this purpose Replacing conventional lights
the instructions were noted down on a by LEDs and installing VFDs in Action Plan & Implementation September 2015

paper and placed near the machine to place of conventional starters Training - Internal Auditor September 2015

ensure good operational control. saved Rs. 2.55 million, with a Internal Audit November 2015

total investment of Rs. 2.44


Implementation roadmap of ISO MRM December 2015
million. Other contributions
50001 and approach adopted Documentation Audit January 2016
to savings came from the
A number of activities were undertaken installation of solar light pipes, Certification Audit February 2016

to improve the energy performance of interlocking for ETP aerator


the plant, and included replacement of motor, and replacement of
old inefficient motors by IE2 class high- obsolete motors by high-
efficiency motors, as also VFD and LED efficiency motors. It was the
ISO Certification – 7th March 2016
light installation, all of which resulted hard work of our team that
in significant improvements in energy led to a timely completion of the projects
of machines was considered to be taken
consumption. The energy efficiency aimed at saving energy, giving a payback
as the base value for further analysis.
improvement projects were first period of one year.
documented and a detailed action plan It was indeed a big task to implement
consisting of responsibilities and time Challenges the energy management system, but
frames was drawn up, with steps taken to • As a composite textile mill, the largest the willingness and dedication of the
implement it. Performance was measured hurdle that came our way was a gap organization brought success. Many
using regression since it considered all in competence and training. Since the lessons were learned as the projects
variables affecting energy use. number of processes is large, the training were implemented: team work, sharing
The energy team prepared a template for and competence of workers working of responsibilities, accountability, and
determining energy consumption and in each process was different and the time management played a key role in
validation in Excel format. This template gap had to be made up. After a long implementing EnMS.
used the baseline data, regression, and brain-storming session with the Human
Keys to Success
some mathematical calculations to Resources personnel, it was decided to
• A suitable system / method for timely
compute the energy consumption for the make a department-wise competency
data collection and measurements of
current period. A report was generated matrix which would also cover the
energy consumption within the plant’s
showing the difference between the training needs in a single context.
boundary.
actual and computed values of energy • Because of the presence of different
consumed with values deviating from • Awareness amongst the people
kinds of machinery with differing loads,
preset limits, being colour-coded. Reasons working in the plant is essential
varying from 0.375 kW to 135 kW, the
for these deviations were given by the because no system/process/method
number of motors was correspondingly
department’s energy team member. can be brought into practice without
very large, approximately 3000. This
knowing its significance.
Since the system was fully integrated and made it difficult to identify and set the
criteria for SEU equipment; however, • Good computer operating skills,
scattered bits brought together, preparing
for audits was no trouble. Only minor after studying all the aspects and especially for working with MS Excel,
things such as placing the instructions at possibilities a value of 100 kW for came in handy in EnPI measurement
proper places near the machines, checking connected load of individual or group and analysis.
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 11

• ISO implementation guides, ISO 50002, requirements. manage and implement the energy
50003, 50004 and 50006 provided a • A well-documented EnMS manual management system and share
clear idea about the interpretation and with all necessary procedures and responsibilities.
meaning of the EnMS standard and its action plans made it a lot easier to

Team of Innovators Mr. Vinod


The team behind the successful implementation of the project was: Padmanabhan
Name of Name of the Role Responsibility in the Director (Works)
Department Employee Organization Raymond Limited,
Engineering Mr. Jayant Joshi General Manager Chhindwara
Electrical Mr. Chandrakant Management Assistant Manager
Engineering Choudhary Representative
Electrical Mr. U.R. Deshmukh Manager Electrical
Engineering
“The implementation of ISO 50001 has
Mechanical Mr. Akhil Jain Manager Mechanical
Engineering resulted in overall awareness among all
General Store Mr. Dhirendra Mishra Energy Management Deputy Manager
stakeholders and departmental heads. It
Team member has also given us a systematic and practical
SCM Mr. Nishikant Shastri Energy Management Manager approach for analyzing the gaps and
Team member improvement areas which has resulted
Mechanical Mr. Rakesh Upadhyay Energy Management Assistant Manager in energy efficiency improvement. This
Engineering Team member resulted in significant improvement of
Instrumentation Mr. Ashish Sharma Energy Management Executive the energy performance level from an
Engineering Team member initial energy baseline. Individual process
CPP Mr. Abhijit Pattanayak Energy Management Assistant Manager has now energy efficiency targets and
Team member objectives are being reviewed regularly.”
P.V Spinning Mr. Ambanna Kore Energy Management Deputy Manager
Team member “Saving energy not only saves money but
Worsted Mr. Ratanlal Verma Energy Management Deputy Manager also saves our limited and valuable natural
Spinning Team member resources”.
Re combing Mr. Sanjay Ekhar Energy Management Executive
Team member 
Grey. Combing Mr. Himojyoti Nandi Energy Management Manager
Team member
Dyeing Mr. Manish Tiwari Energy Management Executive
Team member
Finishing Mr. Pinaki Hazra Energy Management Deputy Manager
Team member
Weaving Mr. Asit Adak Energy Management Manager
Team member
Commercial Mr. Vinod Mokashi Energy Management Executive
Team member
12 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Energy Management System Implementation

Shree Cement Limited


– Mr. P. N. Chhangani,President (Works); Mr. R. Bhargava, Joint Vice President; Mr. Sanjay Singh,
Manager (Energy Management Cell); Mr. Umang Gupta, Senior Engineering (Energy Management Cell)

Introducing the Plant following are considered. Determining Criteria for Potential
• Analysis of energy use and Savings and Feasibility
Shree Cement Limited (SCL) is a leading
Indian cement company and its approach consumption based on measurements Once the energy aspects are identified,
in transforming risks into opportunities and identification of current energy their significance is reviewed; the two
has given it a notable presence in the sources. Past and present energy use significance criteria include, “Potential
national cement industry. It is India’s third and consumption are also evaluated. Savings” and “Feasibility”. Both these,
largest cement company with a cement • Based on the analysis of energy use Savings Potential and Feasibility, are
production capacity of 25.6 million and consumption, areas of significant added to determine which energy aspects
tonnes per annum. SCL commenced energy use are identified as are are significant: aspects totaling to more
operations in 1986 with a production also facilities, equipment, systems, than 10 are considered significant. The
capacity of just 0.6 million tonnes per
processes and personnel working for, table below illustrates how the significant
annum. With changing times and needs,
or on behalf of, the organization that criteria are determined.
SCL diversified its business portfolio
significantly affect energy use and
and entered the power sector with a Note:
consumption. Other relevant variables
commercial power plant, Shree Mega Give 1 mark bonus if Efficiency of
affecting significant energy uses are
Power,whose generating capacity was equipment is 90 % or more
300 MW. If 201 MW of captive power is identified. Current energy performance
of facilities, equipment, systems and Give 2 marks bonus if Efficiency of
included, the total power generation
processes related to significant energy equipment is between 89-75 %
capacity becomes 501 MW. The capacity
of this plant is augmented by 111 MW uses are identified and future energy Give 3 marks bonus if Efficiency of
from the waste heat recovery plants use estimated. equipment is between 74-60 %
(WHR),making a total of 612 MW. The
Criteria for rating energy aspect
capacity of SCL’sWHR power plant is,
Saving Technological Efficiency Rating C Possibility Possibility
worldwide, second only to similar plants Potential Rating Rating B for for Usage of
59.99-50%
89.99-75%

74.99-60%
Efficiency

Efficiency

Efficiency

Efficiency

Efficiency

in China. WHR-based power plants are A Usage of alternative/


between

between

between

between
90% or
more

50%

Renewable waste
located in Beawar, Rasand Raipur. Energy Energy
Rating D Rating E
Development strategies adopted Less than 0 Easy to 10
Rs 10,000/ implement
for implementing ISO 50001, annum well
Energy Management System established
technology/
method,
Identification of Energy Aspects and very simple
Prioritization changes are
required
• All members of the core team, Less 3 Minor changes 7
than Rs are required
comprising personnel from concerned 1,00,000/ 1 2 3 4 5 2 1
departments such as Process, annum

Mechanical, Electrical, the power Less 7 Major 3


than Rs interventions/
plant,together with a Management 10,00,000/ changes are
per annum required
Representative,conduct an energy
More 10 Technology 0
review (aspect identification and than Rs not available
evaluation) initially. While identifying 10,00,000/ or not a
per annum proven
and evaluating energy aspects, the technology
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 13

Give 4 marks bonus if Efficiency of 77,179.56 training man hours –a key • Work instructions for CCR operators
equipment is between 59-50 % highlight of our People Development from CCR control
Give 5 marks bonus if Efficiency of Agenda. We are attempting to customize • To control dust during operation of ESP
equipment is below 50 % the training programs based on the
• To control hot material from kiln I/L and
Give 2 marks bonus if there is Possibility individual learning style of employees in
O/L during pressurization and normal
for usage of renewable energy the coming year. In addition to classroom
operation
Give 1 mark bonus if there is Possibility for training, we also incorporate innovative
and interactive modes of training such as • To minimize dust generation while
usage of alternative / waste energy
role plays, theatre, workshops, movies and cleaning during shutdown.
The significant aspects are further case studies to ensure that the sessions • To minimize dust generation while
examined to determine energy factors, have a higher recall value. cleaning cyclone.
opportunities for savings and required
Cross-functional training is an important • To control dust generation while
investment. Details are recorded in the
aspect of our training sessions wherein pressurizing raw mill circuit
register of opportunities (ROP).The above
criteria are used to prioritize among employees are encouraged to work • To control dust generation while
the opportunities available based on across departments, learn new skills and operating bag filter.
payback period and use of renewable aspire for all-round development. This is • To minimize power consumption of
energy. An action plan for tackling the aimed at building a team of people that various drives during operation.
significant aspects based on priority is comprehends the views of other teams
• To control heat losses during kiln
drawn up and recorded in the register of and is able to address cross-sectorial
operation.
opportunities (ROP). The action plan could challenges.
• Optimum utilization of resources when
be in terms of an EnMP or check sheet or
Steps taken to improve energy overhauling hydraulic system.
work instructions, or a combination of all
performance and optimize operational
these. The delegation of responsibilities • Optimum use of power and ensuring
control safety during operation.
for the action plan is also mentioned in
the ROP. All members of the core team, • Operational control procedures for
• To reduce consumption of energy
comprising personnel from the concerned general electrical maintenance
associated with office/site lighting and
departments shall establish an energy • Operational control procedures for air conditioning.
baseline using the information in the conservation of energy by optimizing
• To conserve energy while operating the
initial energy review, considering a data the use of office lights and air
compressor.
period suitable to the organization’s conditioners
energy use and consumption. Changes • Operational control procedures for safe Cost-benefit analysis
in energy performance shall be measured operation of lifts
against the energy baseline. Adjustments Implementation of ISO 50001 has
• Operational control procedures for benefitted Shree Cement - cost benefits
to the baseline shall be made in the case
energy conservation for the FY 14-15 are as follows:
of one or more of the following:
• Work instructions for shift in charge • Annual energy cost savings: Rs 40.84
1. The Energy Performance Indicators
• Work instructions for section in charge crores
(EnPI) no longer reflect organizational
• Cost to implement: Rs 128 crores
energy use and consumption, • Work instructions for predictive
• Payback period: 3 years
maintenance of load center
2. There have been major changes to the
process, operational patterns, or energy • Work instructions for preventive Keys to Success
systems, or, maintenance work instruction of motor,
Objective of implementing ISO 50001
LRS, GRR
3. According to a predetermined method. was to achieve higher levels of energy
• Work instructions for safe and efficient
efficiency ultimately leading to operational
Use of Professional Expertise operation of lifts.
efficiencies. To align the efforts with
The plant regularly provides three kinds of • Conservation of energy associated with NAPCC under the umbrella of PAT, the
training to their personnel: organizational office lighting and air conditioning plant implemented the following projects:
needs, functional needs and individual • Conservation of energy associated with • Installation of waste heat recovery
needs. In FY 2014-15, 1,153 internal control panel boiler for generation of electricity by
and external training programs were • Work instructions for CCR operators utilizing waste heat from kilns: highest
conducted across all SCL units, totaling during changeover of shift in India.
14 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Table 1: Journey towards implementing ISO 50001


Activity Responsibility
PLANNING
Prepare Annual Audit Plan covering Shree Management System as a whole. System Coordinator / MR
Auditors independent of their activities shall be nominated at the time of preparing Annual Audit Plan. System Coordinator / MR
The audit program / schedule for a specific period shall be prepared and circulated to all concerned, in System Coordinator/ MR
advance.
Unscheduled (extra) audits may also be planned and carried out in case of: System Coordinator/ MR
 Increased customer complaints
 A change of personnel at the level of departmenthead and above.
 Increased departmental non-conformance
 No progress in Continual Improvement Projects / Objectives
 Specific reports from regulatory bodies
 Reduced customer satisfaction
 External audit reports
AUDIT TEAM
Individual auditor or a team of auditors, as found necessary and sufficient will audit each of the functional Audit Team
areas covered by quality/ environment / energy / OHS system elements. Normally the auditor will be a person
from a sister department who has a general knowledge of the functions in that area. In case a team of auditors
is assigned for any functional areas, one of them shall be nominated Team Leader with the responsibility for
overall management of the audit.
QUALIFICATION AND TRAINING OF AUDITORS
Executives / engineers / officers who are given auditing assignments should be diploma engineersor Mgt. Rep. / System
graduatesat the minimum. They should also be given requisite training which is an internal auditor course Coordinator
conducted in-house, or the lead assessor’s course conducted internally or externally to facilitate quick and
efficient auditing.
PERFORMING AUDITS
The auditors carry out audit of departments/activities to check for compliance and effectiveness of the Concerned Internal
quality system and prepare a report of non-compliance, if any Auditor & Auditee
The auditors also verify deficienciesin previous audits and review the effectiveness of the corrective action Concerned Internal
taken. Auditor
The auditor prepares the audit report in 16:01:00:02.based on his findings recorded in the non-conformance Concerned Internal
report 16:01:00:01. This report is submitted to the system coordinator /concerned department and the auditee Auditor & Auditee
compiles the non-conformities observed during the audit.
Auditor shall also obtain acceptance on the observations, proposed corrective action and time required to Concerned Internal
resolve the non-conformities from the head of the auditee department on each non-conformity report. Auditor & Auditee
The auditee department shall take the necessary corrective action and inform the auditors for verification Concerned Auditee
of action taken.
The auditor shall keep system coordinator / MR informed in respect of the audit by sending a copy of the Concerned Internal
audit report at following stages: Auditor
a) Immediately upon completion of audit
b) After verification of corrective action taken by auditee.
Review the progress of completion of audits once in three months. System Coordinator
Prepare audit summary report and send the same to chairman (IMS-SMS) and MRs for review. System Coordinator
Consolidation of NCRs is prepared and put up to MRs andchairman (IMS-SMS) for review. System Coordinator
Consolidated list of corrective and preventive measures to avoid potentialnon-conformance is prepared with System Coordinator
the consent of concerned officials and put up for review in MRG meeting.

• Installation and commissioning of • Replacement of fuel feeding double • Tipping of raw mill fan impeller to
secondary crusher to enhance raw mill’s screw conveyor by direct chute with increase fan flow
output a rotary air lock in coal mill circuit 
• • Replacement of existing conventional
• Enlargement of kiln inlet riser duct Replacement of conventional fuel firing kiln tire cooling fans with high efficiency
orifice cross section blowers by high efficiency Delta blowers fans
• Removal of fan inlet dampers at raw • Installation of coalmill rejects • Replacement of conventional fuel firing
mill and coal mill fans recirculation system system by rotor scale
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 15

• Installation of high efficiency K-turbo • Installation of VFDs and MVDs for


various applications Mr. P. N. Chhangani
blower for jet air in kiln burner
President (Works
• Elevator load current versus bag filter
• Installation of high efficiency IE-3 type Shree Cement Limited
fan speed control system at clinker
motors.
unloading circuit
• Replacement of conventional lights by
• Louver damper removed from process
LED lights
fan inlet duct
• Replacement of higher rating less
• Plant compressor operation taken
loaded LT motors by low rating high into DCS and interlocked developed Frequent climate change events and
efficiency motors in DCs with cement and packing plant rising GHG emissions levels have made
• Installation of Star-Delta starter operations. it obligatory to take appropriate and
pre-emptive actions. Sensing the future
prospects of energy mix and supply
scenarios, efficient energy management is
Team of Innovators
quintessential.
The team behind the successful implementation of the project were (left to right) - Mr.
SCL is the First Indian Cement Company
Umang Gupta (Sr.Engg. (Energy Management Cell)), Mr Sanjay Singh (Manager (Energy
to adopt BS EN 16001:2009 Energy
Management Cell)), Mr. Sanjay Gupta (Additional General Manager (Quality Control)),
Management System proactively and
Mr. Anil Sharma (General Manager (E & I)), Mr. Santosh Kumar Kumawat (Additional
revised it to ISO 50001 in the year 2011.
General Manager (Electrical)), Mr. Sanjay Chaturvedi (Senior Manager (Secretarial)),
Mr. Vishal Singh (Assistant Manager (Secretarial)), Mr. Vimal Kumar Jain (Assistant Energy efficiency is an ultimate measure
General Manager (Electrical)), Mr. Ankit Nagar (Deputy Manager (Energy Management to combat climate change as it leads
Cell)), Mr. Jayant Jain (Sr.Engg. (Energy Management Cell), Mr. Mohan Singh Rathore to improved process efficiency, cost-
(Assistant General Manager (Mechanical)), Mr. Jagdish Prasad Ameta (General Manager economics and energy conservation
(Process)), Mr. Satish Chandra Maheshwari (Vice President Operations (Management)), which ultimately reduce the GHGs
Mr. Arvindkumar Patil (General Manager (Development)), Mr. Ramesh Kumar Sharma emissions, and this is what SCL has been
(Deputy General Manager (Process)), Mr. Abhay Prakash Sharma (Assistant General doing since its inception.
Manager (Electrical)), Mr. Pawan Kumar Sharma (Senior Manager (Civil)) and Mr. Piyush
Singh Brijvasi (Assistant Officer (Environment)) 
16 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Energy Management System Implementation

JK Lakshmi Cement Ltd. – Sirohi (Rajasthan) Plant


– Mr. P. L. Mehta, Sr. Vice President (Works)& Unit Head, JK Lakshmi Cement Ltd. – Sirohi (Rajasthan)

Introducing the Plant had appointed a Management relevant functions, levels, processes
Representative, the EnMS team leader and facilities. While establishing and
JK Lakshmi Cement Limited, located in for the energy management systems; reviewing objectives and targets, legal
district Sirohi (Rajasthan) and established he is responsible for and has the and other requirements were taken into
in 1982, is a member of JK Organization, authority to ensure that the EnMS is account as were significant energy uses
which is one of the largest industrial established, implemented, maintained and opportunities to improve energy
groups in India. JK Lakshmi Cement was and continually improved in accordance performance.
one of the first Indian cement companies with ISO 50001:2011.
• Financing: Consideration was also
to acquire ISO 9000 in June, 1994 for its
• Energy Planning – general: An given to other factors such as financial,
quality assurance system. At present,
energy plan consistent with the operational and business conditions,
JK Lakshmi Cement is ISO 9001, ISO
energy policy had been drawn up technological options and the views
14001, ISO 50001 and OHSAS 18001
and documented. This emphasized of stakeholders. Documented Energy
certified, and its testing laboratory is also
activities that continually improve Management Action Plans (EnMPs)
accredited by NABL. JK Lakshmi Cement
energy performance and therefore were established, implemented
is one of the most modern dry process
involved a review of all activities within and maintained with updates at
cement plants in India, and adheres to all
the organization with the potential to defined intervals. The plans included
applicable statutory regulations. affect energy performance. designation of responsibility, stating
Development strategies adopted • Energy Review: A procedure to record how and when individual targets were
for implementing ISO 50001, and maintain an energy review via to be achieved, a statement of the
Energy Management System periodic audits was established: the methods by which improvements in
procedure defined the methodology energy performance would be verified,
Development phase: and criteria for the review. and a statement of the methods to be

JKLC established, documented, • Review, Analysis and Planning – used for verifying the results.
implemented and maintained an Energy Baseline: Based on the output • Duration: It was estimated that
EnMS and is committed to improving of the initial energy review, and taking establishing the EnMS would take 18
its effectiveness in accordance with into account data for the last two years, months while the actual time taken was
the requirements of ISO 50001:2011. It an energy baseline was arrived at. 17 months.
aims to lead reductions in greenhouse Changes in energy performance were
gases emissions, and also reduce to be measured against this baseline. Use of Professional Expertise
other environmental impacts and •
Competence, training and
• Energy Performance Indicators
energy costs through a systematic Awareness: All personnel working in
(EnPIs): Appropriate energy
management of energy. areas that were part of the EnMS were
performance indicators (EnPIs)
• Top Management: Senior Vice were identified and were linked to trained for the purpose – needs were
President (Works),the Unit-Head is the operational performance parameters identified and training on operation
Top Management in the organization such as energy used/ton of finished of the EnMS was provided. Associated
and committed to the EnMS and product. These are reviewed regularly records, such as those evaluating the
improving its effectiveness. The Unit compared and updated,each month, to effectiveness of actions, are maintained.
Head enunciated an energy policy the energy baseline. • Communication: The senior
which is required to be followed by • Energy Objectives, Energy Targets management established processes
everyone in the organization. and Energy Management Action for communicating information about
• EnMS Team Leader/Management Plans: Documented energy objectives energy performance and the EnMS.
Representative: The Unit Head and targets were established for Internal communications were carried
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 17

Internal Audit of the EnMS: Internal


audits are conducted once in six
months to ensure conformance to the
ISO 50001:2011 requirements, and that
the EnMS is effectively implemented,
maintained and is improving energy
performance.

Operational Control:

It was ensured that operations and


maintenance activities related to
significant energy use and consistent with
the energy policy, objectives, targets and
action plans, are identified. Conformance
with specified conditions was ensured by:
• Establishing and setting criteria for
effective operation and maintenance
of areas of significant energy use,
where deviations could affect energy
out through formal meetings, internal firms to engage the personnel in EnMS performance significantly;
circulars, letters, notice/display boards, activities.
the internal mail system, training • Operating and maintaining facilities,
programs (including those for Energy Steps taken to improve energy processes, systems and equipment, in
Policy), the internal magazine (Lakshmi performance and optimize accordance with operational criteria;
Darpan), open forum meetings, daily, operational control • Appropriate communication of the
weekly meetings, safety committee Approach used to determine the operational controls to personnel
meetings, cross functional teams, and energy performance improvement and working for, or on behalf of, the
quality circles. Any person working verify the results: organization.
for, or on JKLC’s behalf could comment • Making available/displaying written
upon or suggest improvements to Monitoring, Measurement and Analysis: A
work-instructions for a specific process
the EnMS. Suggestions/comments system for monitoring, measuring, recording
or procedure.
received from internal personnel were and analyzing the key characteristics
documented, reviewed and action determining energy performance at Energy performance shall be included
taken. specified intervals was established. in determining how JKLC will
procure equipment and also react to
• Employee Engagement: Employees These key characteristics included:
at different levels and from different contingencies, emergencies or disasters.
• Significant energy use and other
functions were encouraged to Cost Benefit Analysis
outputs of energy review;
participate in the EnMS activities
through a suggestion scheme, a forum • Relevant variables related to significant The implementation of various energy
of quality circles, and cross-functional energy use; saving measures achieved a total energy
teams belonging to different sections • Energy Performance Indicators (EnPIs); cost saving of Rs 903 million, with an
of the plant. Such employees were investment of Rs 2832 million and an
• Effectiveness of the action plans in
nominated for internal and external average payback period of 38 months.
achieving objectives and targets;
training programs, and were deputed
to visit other cement plants to see best • Evaluation of actual versus expected Challenges
practices implemented there. energy consumption.
As all the employees were well versed
• Professional Expertise: Energy An energy measurement plan was with the other management systems
professionals and experts were called in defined and implemented, which already in place (ISO 9001, ISO 14001
from agencies such as the NCCBM, CII, included utility meters, monitoring and and OHSAS 18001) the implementation
and also from BEE-accredited energy measurement systems connected to the of ISO 50001 was smooth. However, the
auditors/BEE empanelled energy audit energy measurement software system. involvement and education of bottom
18 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

consumption patterns.
• Improvements in operational
efficiencies possible; different approach
developed towards maintenance and
procurement procedures.
• Improvement in the awareness of
issues related to energy consumption
and conservation among employees as
well as other associates.
• Helped to minimize wastage of energy.

Significant Achievements at the end of


PAT (Perform, Achieve and Trade) Cycle-1:
• Overall energy performance improved
from 877 kCal/kg of major product to
747 kCal/kg of major product in PAT
Cycle1.

line workmen was a challenge which was • An easy approach to identify and • Thermal energy intensity reduced from
met by regular and effective training by prioritize major energy consuming 759 kCal/kg of clinker to 704 kCal/kg of
internal and external resource persons. activities and equipment was put into clinker.
place • Overall electrical energy intensity
Overall benefits achieved reduced from 81 units/tonne of cement
• Close monitoring of high energy
• A structured platform for energy consuming processes made possible to 74 units/tonne of cement.
consumption, energy conservation and also the development of a • Up to clinkerization, electrical energy
and energy management activities was mechanism for providing information intensity reduced from 55 units/tonne
made available. about any change in energy of clinker to 49 units/tonne of clinker.

Chinese VRM

Kiln-1 upgradation Hot-Air Recirculation Duct IKN Cooler


NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 19

• Achieved total energy cost saving of Rs System), 7.56 to 90.62 Million units/
903 million, with an investment of Rs annum. Mr. P. L. Mehta
2832 million and an average payback Sr. Vice President
• Reduction in CO2 increased, from
period of 38 months. (Works) & Unit Head
2.6 kg CO2/ton of clinker to 24.56 kg
JK Lakshmi Cement
• Achieved CO2 reduction, from 915 kg CO2/tonne of clinker, on account of
Limited, Sirohi
CO2/tonne of clinker to 891 kg CO2/ increased generation of green energy,
(Rajasthan)
tonne of clinker. through WHRS.
• Increased generation of green energy, • Pictures of the projects implemented
through WHRS (Waste Heat Recovery
EnMS-50001 has helped us a lot to
achieve PAT (Perform Achieve & Trade)
Targets by implementing best practices,
Team of Innovators
involving our team members at all levels,
The team behind the successful implementation of the project were (Front row; Left ensuring periodic reviews, identifying
to right): Mr. Alok Kumar Gupta (Dy. Gen. Manager (Geology)), Mr. Nikesh Mittal (Sr. opportunities for improvement &
Manager (Elect)), Mr. Shobha Ram (Sr. Manager (Elect)), Mr. Vivekanand B K (Dy. Gen. executing our action plans as per set
Manager (DG-PH)), Mr. N K J Panchal (Dy. Gen. Manager (Elect)), Mr. B B Wadhawan timelines.
(Vice President (Engg)), Mr. Ajay Sharma -Dy. M. R. (Gen Manager (Process – CM)), Mr. S.
K. Gupta (Dy. Gen. Manager (Mech)), Mr. Rajpal Singh Shekhawat (Gen Manager 
(Process)); (Second Row-Left to Right):Mr.P K Kabra (Sr. Manager (Mech)), Mr.
Hemant Shrimali (Manager (DG-PH)), Mr. Umesh Gupta (Manager (Instrumentation)),
Mr. R K Mishra (Manager (QC)), Mr. C. P. Taparia (Sr. Manager (Mech)) and Mr. Pankaj
Tiwari (Dy. Manager (Process)).
20 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Energy Management System Implementation

Raymond Limited, Jalgaon Unit


– Mr. Sanjay Bokare(Dy.GM Engg.), Raymond Limited, Jalgaon Unit

Introducing the Plant • The team identified current energy it. An Idea Box has been set up in every
sources, evaluated past and present department to collect suggestions from
The Jalgaon Division of Raymond Ltd. was energy use and consumption. Based on shop floor workers, with the best
established in 1979 with a manufacturing this, analysis areas of significant energy suggestion of the month being awarded,
capacity of 79 lakh meters per annum, use were identified. Also identified so as to encourage the workmen. At
of worsted suiting. The worsted division were the facilities, equipment, systems, middle level, there is a monthly meeting to
manufactures worsted suiting fabric with processes and personnel working for, assess whether the EnMS system has been
polyester-wool and polyester-viscose or on behalf of, the organization that implemented effectively.
blends. significantly affect energy use and
Tools and resources
Strategies adopted for consumption. Other relevant variables
implementing ISO 50001, affecting energy use significantly were The plant was guided by a BEE-certified
Energy Management System also identified. energy auditor. Help was sought from
• Estimates of future energy use and external experts to implement ISO
Development phase 50002:2014, ISO 50003:2014, and ISO
consumption were also drawn up;
• The top management is committed to opportunities for improving energy 50004:2014. ISO 14001:2008 was a very
establishing the EnMS system because performance were identified, priorities handy tool in the implementation of the
of its direct effect on operation costs. listed and recorded. Based upon the EnMS system.
This is encouraged by providing energy review, an energy baseline for Steps taken to maintain
separate funds, and involving the heads each SEU was set as was also a target operational control and
of each department, who decide issues for each department. sustain energy performance
related to EnMS implementation and
Use of Professional Experience: improvement
use available resources.
• An energy team was formed comprising A professional was hired to guide The plant listed some Critical Operating
young and energetic members together personnel and implement EnMS 50001. He Parameters (COPs) for each department and
with experienced members. Each team provided training customized to the level monitor these parameters continuously;
member’s responsibility was clearly of the employee and made them aware of the COPs are prominently displayed in
defined, as were timelines. the EnMS system and how to implement each department. Specific consumption in
the plant was monitored each day.

Figure 1: Electricity and Production in the plant Approach used to: 1) determine whether
energy performance improved, and, 2) to
validate results
1. Monitoring of specific energy
consumption of each department.
2. Monitoring of plant’s monthly power
consumption.
3. Monitoring of efficiency and machine
utilization.
4. Measurement of power consumption
using energy meters installed in each
area.
5. Recording of daily production.
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 21

Table 1: Analysis of Actual v/s Expected and Target Saving


Month UOM Apr-15 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16
Actual Electricity kWh/month 189399 193937 199101 210850 120750 96510 103524 82843 110501 102777 0
Production Kgs 129991 118895 115672 128843 122189 111384 125037 95046 127049 120287 0
Var 1   0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
Var 2   0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 0 0
Var 3                        
Expected consumption kWh 150923 139270 135886 149717 142729 131383 145720 114225 147833 140732 14413
Savings Actual kWh/Month -38476 -54667 -63215 -61133 21979 34873 42196 31382 37332 37955 14413
Cumulative kWh -38476 -93143 -156359 -217491 -195512 -160639 -118443 -87061 -49729 -11773 2640
Target consumption kWh 149413 137878 134527 148220 141302 130069 144263 113083 146355 139325 14269
savings kWh/month -39986 -56060 -64574 -62630 20552 33559 40739 30240 35854 36548 14269
savings kWh -39986 -96045 -160619 -223249 -202697 -169138 -128400 -98160 -62306 -25757 -11488
CUSUM
% Variance   -25 -39 -47 -41 15 27 29 27 25 27 100

Cost-benefit analysis:
Project Annual Annual Initial Payback in
energy savings cost months Mr. Sanjay Sharan
savings (kWh) (lacs) (lacs)
Sr. Director (Works)
1 Converting chiller plant into 120000 10.2 30 35.29
Raymond Limited,
normal humidification plant
Jalgaon Unit
2 Replacing 10 TPH boiler into 6   208 tonnes of 52 60 13.85
TPH boiler coal
3 Installing VFDs in treated water 17184 1.46 1 8.22
pump
4 Replacing fluid coupling motor 8592 0.73 1.5 24.65 ISO 50001 is a very handy tool to reduce
with energy-efficient motor along
with drive
production cost by implementing various
energy measures.
5 Replacing conventional 661305.6 56.21 21 4.48
tubelights with LEDs

Lessons Learned
1. Energy cost is playing very vital role in manufacturing process.so we need to use
energy efficiently.
2. Use of Energy efficient equipment should be our focus.

Team of Innovators
The team behind the successful implementation of the project were Mr. Bhupender
Rajput (Dy. Manager), Mr. Milan Rana (Executive), Mr. Inder Pal Singh Kohli (Executive)
and Narendra singh Rathore (Executive).
22 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

BEE’s Financing Initiatives


– Ms. Vineeta Kanwal, Assistant Energy Economist, Bureau of Energy Efficiency

India’s objective of attaining sustainable municipalities, SMEs and industry. The has been estimated that there is a debt
economic growth is directly related to Ministry of Power has a constituted a requirement of Rs. 450 crore and an equity
the efficient management of its energy supervisory committee to monitor the requirement of Rs.185 crore for energy
resources. The Government of India implementation of the PRGFEE. The BEE efficiency projects.
is implementing a large number of appointed an Implementing Agency (IA),a
The Energy Efficiency Financing Platform
programmes addressing the country’s consortium comprising RECPDCL-REC-
(EEFP) is an important initiative under
economic challenges: closely linked to EESL,toope rationalize the PRGFEE, in July
NMEEE whose objective is to provide a
these is bridging the gap between the 2015. Many public and private sector banks
platform for interaction with financial
demand and supply of energy: energy have shown an interest in this programme
institutions and project developers to
efficiency has a vital role in this role to with Yes Bank signing a charter with BEE in
bridge the gap between the demand implement energy efficiency projects. As
2015 to this effect. IDFC Bank, Tata Clean
and supply of energy. In June 2008, part of this programme, MoUs have been
tech Capital Ltd., and Andhra Bank have,
the Government of India released the signed with financial institutions to work
so far, been empanelled by BEE.
National Action Plan on Climate Change together for developing energy efficiency
(NAPCC) with the objective of achieving BEE and Implementing Agency have market side ntifying issues related to this
a sustainable path of development prepared the Operations Manual for market development. The BEE is signing
advancing both, economic and the PRGFEE and created a pipeline of MoUs with M/s. PTC India Ltd, M/s. SIDBI,
environmental objectives. The National few projects to be covered under this Tata Capital, and IFCI Ltd to promote
Mission for Enhanced Energy Efficiency guarantee mechanism. PRGFEE rules were financing for energy efficiency projects.
(NMEEE) is a key component of the NAPCC, notified by the Ministry of Power (MoP)in
In 2015, BEE signed an MoU with the Indian
under which the Ministry of Power and May 2016.
Banks’ Association for training programs
BEE have launched the Framework for The Venture Capital Fund for Energy on energy efficiency financing for
Energy Efficient Economic Development Efficiency (VCFEE) is a fund to provide scheduled commercial banks. This training
(FEEED), and Energy Efficiency Financing equity capital for energy efficiency program was launched in June 2015 and
Platform (EEFP). projects. A single investment by the fund is two training-of-trainers workshops were
The BEE has constituted two funds under not to exceed Rs. 2 crore. The Fund provides held in June 2015. During the launch of
the FEEED, the Partial Risk Guarantee Fund last mile equity support to specific energy this training programme the BEE released
for Energy Efficiency (PRGFEE)and Venture efficiency projects, limited to a maximum a booklet entitled, “Success Stories for EE
Capital Fund for Energy Efficiency (VCFEE) of 15% of the total equity required, Projects Financed in India” and a “Training
to bridge the gap between demand and through Special Purpose Vehicles, or Rs. Manual for Energy Efficiency Financing in
supply of capital investment in energy 2 crore, whichever is less. Sectors covered India”. This booklet containsan account
efficiency projects. under VCFEE are government buildings, of 50 success stories related to energy
private buildings and municipalities. efficiency projects financed by SDBI and
The PRGFEE is a risk-sharing mechanism The Government of India has approved covers 20 industrial sectors across the
to provide financial institutions (banks Rs. 210 crore for this Fund. The MoP has country. In National Energy Conservation
and NBFCs) with a partial coverage of risk constituted a Board of Trustees for VCFEE Awards 2015, two new categories for
in extending loans for energy efficiency
and the trust was registered on 7th July FIs and best business models were also
projects. The guarantee will not exceed
2015. The BEE has already identified introduced to encourage financing in the
Rs. 10 crore per project or 50% of the
SIDBI as the Fund Manager for VCFEE; the energy efficiency sector.
loan amount, whichever is less. The
notification of VCFEE rules bythe MoPis
Government of India has approved Rs. These financing tools for promoting
underway.
312 crore for the PRGFEE covering the energy efficiency projects under NMEEE
following sectors: government buildings, In a recent market survey of ESCOs being will assist India in its commitment to the
private buildings with commercial or carried out by USAID-PACE-D team for Paris Climate Change Agreement signed in
multi-storey residential accommodation, energy efficiency projects in 2014-16,it December 2015.
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 23

Technology gap assessment of the Pulp and Paper Sector and the
scope for UK technology suppliers in this industry
– Dr. B. P. Thapliyal, Scientist F and Head, Central Pulp & Paper research Institute

In India, six hundred pulp and paper and printing paper; 55% is packaging paper, material used: wood, agro and recycled
manufacturing plants produce 14.99 and 10% is newsprint. Certain special kinds fibre-based) varies. The agro and recycled
million tons of paper against an installed of papers such as security and cheque paper paper mills still use conventional processes
capacity of 19.27 million tons. This are imported. The writing and printing which are obsolete by international
accounts for 3.7% of the global paper grades of paper,mostly the uncoated standards, and have not attempted to
production. The Indian paper industry has varieties, cream wove, maplitho and improve their methods. However, the
a highly fragmented structure consisting branded copier, are made mostly from wood- wood-based mills have upgraded the
of small, medium and large paper mills based raw materials, with agro and recycled technology used to improve paper quality
with capacities ranging from 10 to 1500 waste paper being used as raw material for a and reduce pollution load. In order to
tpd, and using mostly wood, agro residues small portion. Industrial paper, classified into solve many problems the industry faces,
and recycled waste paper for raw material. kraft paper, white board, machine glazed it is necessary to modernize the processes
The industry is growing at a rate of 8% per (MG) poster, duplex board and grey board, is involved in paper manufacture; the
annum, due to a demand for paper and largely produced by the small- and medium- technology currently in use lags behind
paper board. sized recycled waste paper and agro-based that used in the rest of the world by about
mills. Newsprint grade paper is made by 30 years.
The Indian paper industry mostly produces
mills which use mostly recycled waste paper
writing/printing, newsprint, as well as Steps aimed at filling the gaps in
as raw material.
industrial grade paper. Of the total technology should be taken up in wood,
production of 14.99 million tons of paper/ The level of technology used in the three agro- and recycled fibre-based paper mills
paper board and newsprint, 35% is writing segments of industry (in terms of the raw through a structured technology support

Table 1: Comparison between India and the world in terms of basic inputs to paper production
Industry Group Particulars Global Consumption Current Indian Industry Benchmark
Industry (best practice)
Consumption
Wood-based mills Raw material, t/t paper** 1.8 - 2.0 2.2 - 2.4 Upto 2.0
Power, kWh/t paper 1000 - 1100 1400-1500 1200
Steam, t/t paper 7-9 12 – 13 9.0
Water, m3/t paper below 50 Upto 100 75
Agro-based mills Raw material, t/t paper NA 2.6 – 2.8 2.3
Power, kWh/t paper NA 1200 – 1400 1100
Steam*, t/t paper NA 12- 14 (CR) 10 (CR)
8-10 (NCR) 7 (NCR)
Water, m3/t paper NA Upto 120 Upto 100
Recycle Fiber Raw material, t/t paper 1.1 1.1- 1.2 Upto 1.1
(RCF)-based Power, kWh/t paper 500 450 – 550 400
mills producing
Steam, t/t paper 2.5 4–5 3.5
unbleached grades
Water, m3/t paper 5.0 – 7.5 Upto 30 Upto 20
RCF-based mills Raw material, t/t paper 1.2 - 1.25 1.2 - 1.4 Upto 1.2
producing bleached Power, kWh/t paper 600 - 650 680 – 800 570
grades
Steam, t/t paper 4.0 - 4.5 6.0 – 7.0 5.0
Water, m3/t paper 10 -15 Upto 50 Upto 35
Source: Industry Associations data
NA – industry data not available
* Agro-based mills are classified on the basis of the method of chemical recovery used: conventional (CR); and, non-conventional (NCR).
**Raw material is measured in terms of bone dry weight
24 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Table 2: Practices in Indian mills compared with practices in developed countries


Practices used in India Modern technological practices in developed countries
Raw Material Preparation
• Chipping of wood & bamboo: Disc/drum chippers used • De-barking of raw material
• Cutting of agro residues: Straw cutters • Mechanized harvesting and baling
• De-pithing of bagasse: Conventional methods • Efficient de-pithing of bagasse
Pulping
• Pulping of agro residues: Spherical Rotary Digesters and • Continuous Digesters used
Continuous Pandia Digesters used employing soda pulping • Energy-efficient super batch process
process. • RDH pulping using sulphate process andsulphite process
• Pulping of wood & bamboo: Pulping is by sulfate process. • Efficient blow-heat recovery
Stationary Batch Digesters largely being used. Only two mills • Oxygen de-lignification
have continuous Kamyr digesters; and one mill has RDH pulping
process.
• Higher kappa number
Brown Stock Washing
• Poacher washers used in small mills based on agricultural residue • Ultra filterssuch as double wire belt washers, twin roll washers
and waste paper. and diffuser washers used.
• Countercurrent washing is employed in other mills using rotary
drum vacuum filters.
• Chemi washers have been installed in only two mills.
Bleaching
• Hypochlorite bleaching in small mills. • Total Chlorine Free (TCF) process incorporating bleach enzymes
• Bleaching in medium and large mills is conventional: CEH, CEHH, O-Z-Q-P
CEoHH (C-Chlorine, E-Extraction, H-Hypochlorite, Eo- Oxidative O-Z-Q-P-X
Extraction). O-X-Z-Q-P
• Chlorine dioxide bleaching practiced only in 5 mills. O-A-EoP-P/ O-Q-EoP-P
• Ozone bleaching practiced only in one mill O-A-Z-P
• Elemental Chlorine Free (ECF) process incorporating enzymes
ODED
OC/ DEoDED
(C-Chlorine, E-Extraction, H-Hypochlorite, O-Oxygen, Z-Ozone,
Q-Chelation, P-Peroxide, D-Chlorine dioxide, A-Acidification)
Chemical Recovery
• In evaporation streammost large mills have Long Tube Vertical In the area of chemical recovery the state-of-the-art technology
(LTV) type evaporators; two mills still have Short Tube Vertical involves:
(STV) evaporators, followed by Direct Contact Evaporator (DCE) • Inclusion of 7 effect plate-type falling film evaporators and
which are environmentally incompatible as it is difficult to Vapour Compression Evaporation for higher steam economy and
achieve high solids concentration with DCEs. low steam consumption.
• Some of the mills have incorporated Falling Film (FF) type • Inclusion of thermal treatment in the evaporator street to
finisher effects. achieve higher solids concentration.
• In the area of recovery boiler, the mills are equipped with • Adoption of large capacity single drum boiler with continuous
Tomlinson boilers with double drum technology. The problem of blow down.
silica in black liquor is a major problem in chemical recovery. No • Rotary lime kilns with pre coat filter for mud filtration.
mill uses black liquor desilication. • Desilication of silica-rich black liquor
• Use of furnace oil in the lime kiln • Incorporation of non-process elements (NPE) removal system
• Efficient lime re-burning
• Use of producer gas and biogas from waste biomass in the Lime
Kiln
• Incineration of non- condensable gases(NCG’s) in the Lime Kiln
for reduced emission of sulfur compounds
Stock preparation
• Poor fibrerecovery • Efficient fibre recovery through sedimentation and floatation
• White water recycling technology
• No/little automatic control in stock preparation section. • Fully closed loop with minimum fresh water use
• Improved automation
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 25

Practices used in India Modern technological practices in developed countries


Paper Machine
• Slow machines with small deckles hence low production rate. • High speed (averagespeed of the best paper machine in world) is
• Open head box without CD profile control system. twice that of India’s best.
• Fourdrinier wire section with low retention resulting in poor • Wider paper machine deckle
paper formation. • Eco-friendly biocides
• Single nip presses • Efficient filler andfibre recovery
• Open hoods without heat recovery system. • Efficient condensate recovery
• Large steam consumption and low condensate recovery from • Modification of Head Boxes, modification of Forming section and
dryers. high speed print formers,
• No auto control system. • Improved press configuration using nip presses and closed draw
• Hardnip calendars. system
Environmental Management
• Effluent treatment employing conventional ASP Process: Difficult • Efficient recycling and reuse of water using Kidney technologies
to achieve desired pollution norms • Bio-remediation of color, COD and Adsorbable organic halogens
• Gaseous pollution (NCGs) (AOX) from paper mill effluent employing developed microbial
consortia- pilot testing.
• Incineration of NCGs
Recycled Fibre – Biodeinking
• Large quantities of deinking and bleach chemicals used • Savings in deinking and bleach chemicals
• Low toner ink removal • Improved drainage rate, thereby productivity
• Drainage rate • Improved product quality through:
• Brightness Gain in brightness
• Stickies Reduction in stickies
• Dirt Count Reduction in Dirt Count
• High ERIC values Low ERIC values
• High BOD and COD • Reduced pollution load in terms of BOD and COD

Enzymatic Refining of Pulp


• Refining energy • Reduction in refining energy
• Drainability • Improved drainability

programme. The programme should aim to improve the competitiveness of industry by acquiring state-of-art technologies. This can
be achieved by:
• Identifying and marketing appropriate technologies
• Acquiring proven technology of UK origin/design and drawing.
• Contractual R&D activities leading to technology upgradation of the units.

The aspects that such a scheme should cover are:


• Raw material upgradation
• Resource conservation
• Product quality
• Process improvement
• Energy conservation
• Environmental compliance
• Research and development for adoption of technologies in Indian mills.

The projections for growth upto 2025-26 are very encouraging and prospects for introducing appropriate UK technology via suppliers
into the Indian paper industry are bright.
26 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016

Interventions of ESCO-based Steam Supply Services in a Process


Industry - the Success Story of Kaleesuwari Refinery (KRPL)
– Mr. Pprakash Vankani, Director, GSH Energy Services Private Limited

Kaleesuwari Refinery Private Limited Intervention of GSH such as coal procurement, operations
(KRPL), popularly referred to as Kaleesuwari GROUP in Thermal Energy and maintenance of boiler and related
is one among India’s largest FMCG brands Supply auxiliaries, water treatment and waste
and has also managed to makea mark disposal.
in a few international markets such as Considering the challenges involved in
• Cost of steam indexed with price of coal
America, Europe, the Middle East and Asia. fulfilling their thermal energy needs, KRPL
based on prevailing market situation.
The refinery produces edibleoils as also decided to outsource the operations and
maintenance of their thermal utilities so • Guaranteed supply of steam @ 14 ± 0.5
oils for home care, personalcare and for
as to enable a sharper focus on their core kg/cm² and 180 °C, and mass flow rate
use in baking confectionery. There are four
activities such as innovations in processing, as desired.
major manufacturing facilities across the
southern states backed by state-of-the-art launching a wider variety of products, and, • Uninterrupted steam supply throughout
refining technology and processes from maintaining an uncompromised quality the day and year (excluding annual
Desmet Ballestra, Belgium. standard. maintenance hours).

The GSH Group, with their domain • Replacement guarantee for boiler and
This is a case study of the KRPL unit located associated equipment throughout
at Medavakkam, Chennai, and looks at expertise in the operation of thermal
the period of the contract. Onsite
their unique and innovative Energy Saving utilities was a natural choice for this work,
maintenance of all the equipment.
Company (ESCO)contract approach for for KRPL.
Duration of the contract 7 years from
effectively and efficiently meeting the GSH Group PLC,a renowned US- and the signature of the contract and
need for thermal energy. UK-based multinational company in the extendable by 5 years.
field of facility and energy management • All assets of the thermal utility leased to
Nature of Energy Use – evolved the concept of steam supply GSH Group for the term of contract.
KRPL Chennai service through ESCO contracting.
The Chennai unit of KRPL is considered the
Unique Strategies Adopted by GSH
GSH has articulated a unique ESCO model
mother unit and is highly energy in tensive. in the Indian context. The model is a blend To fulfil the contract responsibilities and
Electrical energy is sourced from the State of GSH’s international experience and commitments, GSH adopted innovative
Electricity Board while thermal energy exposure as well as the specific requirement engineering and managerial techniques.
is generated in-house using a coal-fired of Indian industries. In essence, the end- These are described below.
boiler. Coal-fired thermic fluid heaters are to-end responsibility of steam generation i. Fuel Procurement
also used to meet any high temperature would be taken care of solely by the GSH GSH set up an exclusive Procurement
heating process requirements. Group with payment being made on a Division to look after the economic and
pre-agreed unit cost of
Challenges Encountered steam. Figure 1: ESCO Steam Supply Model at KRPL, Chennai
with respect to in-house Steam Pressure @ 14 kg/cm2

Thermal Energy Generation Salient Features


KRPL Scope: KRPL, Chennai Charged based on pre
1. TNEB POWER SUPPLY 5. DOZER FOR FUEL HANDLING & temperature 180 oC Unit agreed Rs / kg against
2. DG SOURCE 6. WATER TANKER
3. RAW WATER 7. COMPRESSOR – 1 actual consumption

of Steam Supply 4. 16TPH BOILER WITH AUX 8. COAL STORAGE YARD Steam Flow Meter consumption

The current set up for supplying thermal Services via ESCO


Water Treatment
Plant

energy involves the deployment of Route Coal Fired


technically qualified manpower as also top Boiler

management for day-to-day activities such The salient features of Stack With
Monitoring System
Ash Handling System

as procuring coal of the right quality,its the steam supply model GSH Scope:
1.
2.
MANPOWER
FUEL

are listed below.


3. TREATED WATER
Coal
storage, handling, utilization, operation and
4. CONSUMABLES
5. SPARES Handling
6. O&M OF BOILER

maintenance of the boiler and it sauxiliaries. • GSH to take entire KR


PL
Bo

Stringent statutory and environmental responsibility of un


da
ry
compliance by the company call for close steam generation Coal Procurement GSH Boundary
Coal Storage
monitoring and prompt action. including aspects Figure 1 ESCO Steam Supply Model at KRPL, Chennai
NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016 27

technical aspects of the procurement iv. Energy Efficiency less than 5 kg of steam/kg of fuel.
process. The Division ensured the availability The main goal of this ESCO model is to  Increased profitability, since energy
of coal as well as its adherence to pre- fulfill the thermal energy demand of KRPL, efficiency is the only profit margin
defined fuel characteristics such as moisture Chennai, by enhancing the efficiency factor for the GSH Group.
content, size, calorific value, caking index. of energy use without compromising
 Uninterrupted supply of steam with the
ii. O & M Methodologies on environmental norms. The energy
desired parameters, hence increased
GSH, as a domain expert in utility efficiency of steam generation is enhanced
productivity and nil downtime.
operations and maintenance,has adopted through the necessary audits and
periodical reviews by the team of energy  Sharper focus by KRPL team on their
a systematic and meticulous approach to
experts led by a specialized arm of the GSH core activities such as production
the execution of this service with a team
Group. Different ways in which energy and quality enhancement to increase
of qualified engineers and technicians.
efficiency was increased and some areas of competitiveness in the market.
Improvements continue in areas such as
fuel storage and handling, fuel and water the utility where these improvements took  Reduction in operating costs because
monitoring tests with well-established place are listed below. of improved energy efficiency and
laboratory facilities, improved water  Efficient coal stacking and conveying. enhanced maintenance.
quality through effective treatment,  Control of coal fines by monitoring Watch by GSH on subsidies,

and,by methodical operations in the quality and characteristics before feed. environmental standards, CO2 quota
thermal, mechanical and electrical utilities. management, hygiene and safety, etc.
 Oxygen trim control (maintained at 4 to
The technical team is supported by skilled
5%).
technical staff and often trained by a team Summary
of technical experts and specialists.  Reducing radiation losses by cost-
effective insulation. The scheme to supply steam through
iii. Advanced Automations and
the ESCO route proved to be a
Instrumentation Controls  Minimizing air ingress.
success allowing the reaping of
GSH has invested a considerable amount  Recovering condensate to maximum substantial financial, organizational and
of capital in upgrading the metering possible extent thereby increasing feed environmental benefits. The success of
and monitoring methodologies and are water temperature and conserving this ESCO model can be attributed to the
thus able to identify bottlenecks in day- resources. unique work culture of the GSH Group and
to-day operations and eliminate the the extraordinary organizational support
wastage of resources such as coal, water, Benefits of ESCO Model provided by the Kaleesuwari Group. The
electricity, etc. Some notable changes on Energy, Economy and success of the ESCO model is also evident
were the installation of online combustion Environment from the fact that a similar contract(ESCO-
monitoring software, EffiMax 3000 (a baseds team supply service at the KRPL,
product of Forbes Marshall), and remote This ESCO contract commenced in April
Palani Unit) was offered to the GSH Group
energy monitoring software, GSH EMS (a 2015 and continues to operate successfully.
by the Kaleesuwari management,an
product of GSH), (shown in Figures 2 and Benefits of the venture are detailed below.
acknowledgement of the excellent service
3) to monitor energy use and facilitate Reduction in coal consumption
 delivered.
maintenance of desired efficiency levels. maintaining a steam-to-coal ratio not

Figure 2: EffiMax 3000 Online Combustion Monitoring Tool Figure 3: GSH EMS Online Energy Monitoring Tool
28 NEWSLETTER ISSUE-6, SPECIAL EDITION-ENMS 2016
KEP JOURNEY IN LAST ONE YEAR
Sector-Specific Best Practices Workshops to Promote Energy Efficiency
KEP has so far organized sector level workshops for all PAT sectors of the first cycle and has now initiated the sectoral best practice workshops for the second
PAT cycle. So far cement, textile and aluminium best practice workshops have been organized for the second PAT cycle. The distinctive feature about these
workshops is that they are able to secure diverse stakeholder participation and promote peer to peer learning through exchange of best practices and
technology exhibition.

Fertilizer workshop - 16th February, Iron & Steel workshop - 4th March, 2nd Textile workshop-28th June, 2nd Cement workshop-7th July 2nd Aluminium workshop-16th
2016 at Jagdishpur 2016 at Raipur 2016 at Ahmedabad 2016 at Telangana December, 2016 at Hirakud

Cross Sectoral- Best Practice Workshops to Promote Energy Efficiency


The two day ‘National Workshop cum Technology Exhibition for Promoting Industrial Energy Efficiency’ was organized under the Knowledge Exchange Platform
(KEP) initiative from 7th to 8th November, 2016 at New Delhi, which was attended by more than 270 participants from aluminium, cement, chlor-alkali, fertilizer,
pulp & paper, textile, iron & steel, thermal power, hospital, sugar, chemical, glass, automobile sectors. The event also provided an excellent opportunity to facilitate
exchange of knowledge and transfer of technologies by bringing together the industry, technology suppliers and other important stakeholders on a common
platform at the technology & poster exhibition. KEP also recognized the contribution of the participating speakers, technology suppliers and poster presenters
through an award ceremony at the end of the workshop.

Participants at the workshop Industry delegates at the Technology Industry delegates at the Poster Exhibition Award distribution at the workshop
Exhibition
Sector Learning Group (SLG) Meetings
KEP has so far organized the first SLG meetings for all PAT sectors of the first cycle and has now initiated the series of 2nd SLG meetings with a focus on mapping
the present technology gap in the sector in-order to identify / understand what technological advancements are needed to help industry achieve the higher
targets said under the second PAT cycle.

Fertiliser SLG meeting on 15th Iron&Steel SLG meeting on 3rd 2nd Textile SLG meeting on 27th 2nd Cement SLG meeting on 7th 2nd Pulp & Paper SLG meeting on
February, 2016 at Jagdishpur March, 2016 at Raipur June,2016 at Ahmedabad July,2016 at Telangana 11th August 2016 at New Delhi

Friendly Energy Efficiency Exchange Visits


KEP organized three friendly energy efficiency exchange
visits for the fertilizer, cement and aluminium sectors, where
the delegates were taken around the plant areas and control
room. These industrial visits also facilitated interaction with the
plant personnel on energy efficiency improvement initiatives,
maintenance practices, efficient operation, and monitoring
practices. Visit to Indo Gulf Fertiliser plant Visit to My Home Industries Limited Visit to Hindalco industries Limited,
Hirakud

Subscribe to KEP Newsletter


KEP Newsletter is a quarterly publication that highlights the best practice case studies on energy efficiency, small group activities, updates on PAT, ESCerts, financing
models and innovative national and international technologies to help industry in continuously improving their energy productivity. To enable us to sustain this
effort, we plan to make this Newsletter a priced publication from next issue onwards. We strongly encourage you to subscribe to the Newsletter, which will keep
you updated and informed about the latest developments in the field of energy efficiency.
Subscription type: • Single Subscription: INR 1000 per issue • Annual Subscription: INR 3000 [4 issues]
Subscription Form
Subscription type: Single/ Annual
Enclosed is a cheque/DD No._________________________Dated______________________________ Drawn on_______________________________________________
___________________ in favour of “Institute for Industrial Productivity India”, New Delhi
Kindly send me the copies of KEP Newsletter to the following address:
Name ___________________________________Designation:_______________________Organization: _______________________ Address: _______________________
____________________________________ State__________________ Pin______________ Tel No/Mobile: ___________________Email Id: _________________________
Please send this form duly filled in along with payment to: Institute for Industrial Productivity India, 5, Navjeevan Vihar, Second Floor,New Delhi – 110017, India;
Tel: 011-26691325; Email ID: kep@beenet.in; info@iipinetwork.org

Disclaimer: None of the parties involved in the development and production of this Newsletter assume any responsibility, makes any warranty, or assume any legal liability for the accuracy, completeness, or usefulness of
any information contained in this Newsletter. This Newsletter and the information contained therein, cannot be reproduced in part or full without the written permission of the KEP Secretariat.

Comments and feedback welcome:


Knowledge Exchange Platform Secretariat
Bureau of Energy Efficiency, Sewa Bhawan, R.K.Puram, Sector-1
New Delhi-110066 | E-mail: kep@beenet.in; info@iipinetwork.org
For more information, please visit us at: www.knowledgeplatform.in
View publication stats

You might also like