The process document summarizes the binning process at a manufacturing facility. Workers first identify materials available and check part labels to determine if they are new or existing parts. For new parts, an empty bin location is allocated and updated in the system. For existing parts, the existing bin location is checked to ensure it is not full before binning. If a bin is full, an overflow location is provided, master files are updated, and materials are binned and the binning file updated.
The process document summarizes the binning process at a manufacturing facility. Workers first identify materials available and check part labels to determine if they are new or existing parts. For new parts, an empty bin location is allocated and updated in the system. For existing parts, the existing bin location is checked to ensure it is not full before binning. If a bin is full, an overflow location is provided, master files are updated, and materials are binned and the binning file updated.
The process document summarizes the binning process at a manufacturing facility. Workers first identify materials available and check part labels to determine if they are new or existing parts. For new parts, an empty bin location is allocated and updated in the system. For existing parts, the existing bin location is checked to ensure it is not full before binning. If a bin is full, an overflow location is provided, master files are updated, and materials are binned and the binning file updated.
Process Document – Binning TML – PCBU, Hinjawadi Pune
Process start
Identify the Materials available at
Bin Drop Area Check the Part Identity Labels
Check parts (GR
Copy) whether it New Parts is new or existing before binning Allocate a new empty location for the new parts. Existing Parts And update in the system and bin material.
Other parts lying
Location Full Check location, in Location and materials lying in that bin mentioned on Give overflow Giver overflow GIN paper location, update in location, update before binning Ok master file (Excel in Master File bin Sheet), and bin the the materials and materials and update- Fixed Bin for every part. update-binning binning file Bin parts in location & update binning file manually. If bin is full file or binner bin at wrong bin location