You are on page 1of 1

Process Document – Binning TML – PCBU, Hinjawadi Pune

Process start

Identify the Materials available at


Bin Drop Area
Check the Part Identity Labels

Check parts (GR


Copy) whether it New Parts
is new or
existing before
binning Allocate a new empty
location for the new parts.
Existing Parts And update in the system
and bin material.

Other parts lying


Location Full Check location, in Location
and materials
lying in that bin
mentioned on
Give overflow Giver overflow
GIN paper
location, update in location, update
before binning
Ok
master file (Excel in Master File bin
Sheet), and bin the the materials and
materials and update- Fixed Bin for every part.
update-binning
binning file Bin parts in location & update
binning file manually. If bin is full file
or binner bin at wrong bin location

End

Revision Nov-07 Page 1 of 1

You might also like