You are on page 1of 2

EPF - CHECKLIST DOC NO- Rev.

0
Pressure Transmitter
LOCAL
MAINTANANCE

GENERAL DETAILS

CHECKLIST NUMBER  
EQUIPMENT NUMBER  
DATE  

SPECIFICATIONS

Pressure Transmitter
MANUFACTURE  
MODEL NO.  
SERIAL NO.  

TASKS

MAINT. DONE
TASK DATE INITIAL
SCHED √
TOOLBOX TALK ALL      
Pressure Transmitter inspection Half Yearly      
     

TASK COMPLETION REPORT


NOTE: PLEASE ATTACH ANY MANUFACTURERS MANUALS IF NECESSARY.

TASK COMPLETED YES NO SIGNATURE


TECHNICIAN
SUPERVISOR

HMGPP P a g e 1|2
EPF - CHECKLIST DOC NO- Rev. 0
Pressure Transmitter
LOCAL
MAINTANANCE

CHECKLIST FOR PRESSURE TRANSMITTER

CHECKS TO DO DONE/VALUE INITIALS REMARKS


HALF YEARLY CHECKS OF PRESSURE TRANSMITTER
Check the supply voltage in the transmitter.      

Check for any leakages in Impulse Tubing, fittings.      

Check for loose connection in the terminal, cable gland      

Check the leakage/function of 2-way valve manifold      

Check & clean the contact points. Tighten all screws      

Check the zero drift      

Checked the reading of the Pressure Transmitter      

Whether reading is normal. If not then do the calibration      

Last Calibration date      

Range

Display of value in the local pressure gauges

Date of the performed activities

HMGPP P a g e 2|2

You might also like