You are on page 1of 1

Project:

Proposed Stilt House


Location: Brgy. Bonbon, Aloguinsan, Cebu
Owner:Mr. Cecilio D. Manguilimotan Jr.

ADDITIONAL MATERIALS
Description Qty. Unit Unit Cost Total Cost
I. EARTHWORKS
II. FORMWORKS & SCAFFOLDING -
III. CONCRETE WORKS -
IV. MASONRY WORKS -
V. CARPENTRY WORKS -
- 1/2" dia. x 200mm Machine Bolt, Wood Post 10.00 pcs 656.00 6,560.00
complete w/ nut & washer (both end)
VI. ROOFING/TINSMITHRY -
VII. ELECTRICAL WORKS -
- 5/8 Ground Rod 1.00 pc 650.00 650.00
- Meter Card Box 1.00 pc 100.00 100.00
- Secondary Rack 1.00 set 100.00 100.00
VIII. PLUMBING WORKS -
Flexible Hose Plastic P-Trap 1.00 pc 350.00 350.00
(for service area sink)
Materials for water source connection
(from the highway road stub-out to proposed house)
- 1/2" diameter HDPE Pipe, SDR9 250.00 l.m. 25.00 6,250.00
- 1/2" dia. HDPE Coupling Connector 2.00 pcs 60.00 120.00
- 1/2" dia. x 3" G.I. Nipple 2.00 pcs 35.00 70.00
- 1/2" dia. x 90 deg. G.I. Elbow 2.00 pcs 35.00 70.00
- 1/2" dia. G.I. Tee 1.00 pc. 35.00 35.00
- 1/2" dia. Brass Ball Valve (Stub-out control) 2.00 pcs. 200.00 400.00
- 1/2" dia. PE Male Adaptor 5.00 pcs. 60.00 300.00
- 1" Teplon Tape 2.00 pcs. 40.00 80.00
- Silicon Sealant (Sealing/Finishing) 2.00 tubes 200.00 400.00
- Faucet 1.00 pc 135.00 135.00
IX. CEILING WORKS
X. TILE WORKS -
XI. PAINTING WORKS
#180 Sandpaper 3.00 pcs 100.00 300.00
XII. DOORS & WINDOWS

Total ₱ 15,920.00