You are on page 1of 72

Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 30.04.17 Date of Testing:- 02.05.17

Source of Material :- Near Ch:-25+500 LHS 4 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1202

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 10.60 10.60 1.06 98.94

4 2.000 34.20 44.80 4.48 95.52

5 0.425 52.60 97.40 9.74 90.26

6 0.075 16.80 114.20 11.42 88.58

1) Gravel Content ( + 4.75 mm ) = 1.06 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.36 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.58 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 30.04.17 Date of Testing:- 02.05.17

Source of Material :- Near Ch:-32+500 LHS 6 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Laxminarayanpur Sample No.:- 1203

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.00 0.00 0.00 100.00

4 2.000 54.90 54.90 5.49 94.51

5 0.425 42.60 97.50 9.75 90.25

6 0.075 19.90 117.40 11.74 88.26

1) Gravel Content ( + 4.75 mm ) = 0.00 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.74 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.26 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 01.05.17 Date of Testing:- 03.05.17

Source of Material :- Near Ch:-25+500 LHS 4 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1204

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 20.20 20.20 2.02 97.98

4 2.000 24.40 44.60 4.46 95.54

5 0.425 43.30 87.90 8.79 91.21

6 0.075 76.80 164.70 16.47 83.53

1) Gravel Content ( + 4.75 mm ) = 2.02 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.45 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 83.53 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.05.17 Date of Testing:- 04.05.17

Source of Material :- Near Ch:-32+500 LHS 6 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Laxminarayanpur Sample No.:- 1205

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 11.10 11.10 1.11 98.89

4 2.000 23.40 34.50 3.45 96.55

5 0.425 63.00 97.50 9.75 90.25

6 0.075 53.20 150.70 15.07 84.93

1) Gravel Content ( + 4.75 mm ) = 1.11 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.96 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.93 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.05.17 Date of Testing:- 04.05.17

Source of Material :- Near Ch:-25+500 LHS 4 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1206

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 5.00 5.00 0.50 99.50

4 2.000 39.50 44.50 4.45 95.55

5 0.425 43.10 87.60 8.76 91.24

6 0.075 66.50 154.10 15.41 84.59

1) Gravel Content ( + 4.75 mm ) = 0.50 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.91 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.59 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.05.17 Date of Testing:- 04.05.17

Source of Material :- Near Ch:-25+500 LHS 4 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1207

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 8.80 8.80 0.88 99.12

4 2.000 25.80 34.60 3.46 96.54

5 0.425 62.90 97.50 9.75 90.25

6 0.075 12.70 110.20 11.02 88.98

1) Gravel Content ( + 4.75 mm ) = 0.88 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.14 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.98 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.05.17 Date of Testing:- 04.05.17

Source of Material :- Near Ch:-25+500 LHS 4 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1208

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 10.60 10.60 1.06 98.94

4 2.000 33.90 44.50 4.45 95.55

5 0.425 43.00 87.50 8.75 91.25

6 0.075 31.80 119.30 11.93 88.07

1) Gravel Content ( + 4.75 mm ) = 1.06 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.87 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.07 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 03.05.17 Date of Testing:- 05.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1209

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 27.00 27.00 2.70 97.30

4 2.000 18.50 45.50 4.55 95.45

5 0.425 51.30 96.80 9.68 90.32

6 0.075 55.40 152.20 15.22 84.78

1) Gravel Content ( + 4.75 mm ) = 2.70 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.52 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.78 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 03.05.17 Date of Testing:- 05.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1210

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 23.60 23.60 2.36 97.64

4 2.000 7.90 31.50 3.15 96.85

5 0.425 56.50 88.00 8.80 91.20

6 0.075 92.20 180.20 18.02 81.98

1) Gravel Content ( + 4.75 mm ) = 2.36 %


2) Sand Content ( 0.075 - 4.75 mm ) = 15.66 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 81.98 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 03.05.17 Date of Testing:- 05.05.17

Source of Material :- Near Ch-32+500 LHS 6 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Laxminarayanpur Sample No.:- 1211

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 19.10 19.10 1.91 98.09

4 2.000 22.20 41.30 4.13 95.87

5 0.425 56.20 97.50 9.75 90.25

6 0.075 57.70 155.20 15.52 84.48

1) Gravel Content ( + 4.75 mm ) = 1.91 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.61 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.48 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 04.05.17 Date of Testing:- 06.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1212

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.60 21.60 2.16 97.84

4 2.000 13.00 34.60 3.46 96.54

5 0.425 67.60 102.20 10.22 89.78

6 0.075 48.10 150.30 15.03 84.97

1) Gravel Content ( + 4.75 mm ) = 2.16 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.87 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.97 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 04.05.17 Date of Testing:- 06.05.17

Source of Material :- NearCh-32+500 LHS 6 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Laxminarayanpur Sample No.:- 1213

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 20.70 20.70 2.07 97.93

4 2.000 23.10 43.80 4.38 95.62

5 0.425 53.70 97.50 9.75 90.25

6 0.075 53.40 150.90 15.09 84.91

1) Gravel Content ( + 4.75 mm ) = 2.07 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.02 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.91 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.05.17 Date of Testing:- 09.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1214

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.60 21.60 2.16 97.84

4 2.000 13.00 34.60 3.46 96.54

5 0.425 70.90 105.50 10.55 89.45

6 0.075 40.80 146.30 14.63 85.37

1) Gravel Content ( + 4.75 mm ) = 2.16 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.47 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.37 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.05.17 Date of Testing:- 09.05.17

Source of Material :- Near Ch-25+500 04 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1215

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 9.60 9.60 0.96 99.04

4 2.000 35.90 45.50 4.55 95.45

5 0.425 52.00 97.50 9.75 90.25

6 0.075 32.40 129.90 12.99 87.01

1) Gravel Content ( + 4.75 mm ) = 0.96 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.03 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.01 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.05.17 Date of Testing:- 09.05.17

Source of Material :- Near Ch-25+500 LHS 04 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1216

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 4.20 4.20 0.42 99.58

4 2.000 30.40 34.60 3.46 96.54

5 0.425 72.10 106.70 10.67 89.33

6 0.075 14.90 121.60 12.16 87.84

1) Gravel Content ( + 4.75 mm ) = 0.42 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.74 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.84 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.05.17 Date of Testing:- 09.05.17

Source of Material :- Near Ch-25+500 LHS 04 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1217

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 19.60 19.60 1.96 98.04

4 2.000 24.40 44.00 4.40 95.60

5 0.425 54.00 98.00 9.80 90.20

6 0.075 61.30 159.30 15.93 84.07

1) Gravel Content ( + 4.75 mm ) = 1.96 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.97 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.07 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.05.17 Date of Testing:- 09.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1218

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 12.20 12.20 1.22 98.78

4 2.000 23.30 35.50 3.55 96.45

5 0.425 61.30 96.80 9.68 90.32

6 0.075 17.10 113.90 11.39 88.61

1) Gravel Content ( + 4.75 mm ) = 1.22 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.17 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.61 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 08.05.17 Date of Testing:- 10.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1219

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 13.60 13.60 1.36 98.64

4 2.000 30.00 43.60 4.36 95.64

5 0.425 63.90 107.50 10.75 89.25

6 0.075 44.90 152.40 15.24 84.76

1) Gravel Content ( + 4.75 mm ) = 1.36 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.88 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.76 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 08.05.17 Date of Testing:- 10.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1220

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 11.60 11.60 1.16 98.84

4 2.000 31.90 43.50 4.35 95.65

5 0.425 54.00 97.50 9.75 90.25

6 0.075 35.70 133.20 13.32 86.68

1) Gravel Content ( + 4.75 mm ) = 1.16 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.16 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.68 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 09.05.17 Date of Testing:- 10.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1221

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 29.50 29.50 2.95 97.05

4 2.000 8.00 37.50 3.75 96.25

5 0.425 68.00 105.50 10.55 89.45

6 0.075 82.40 187.90 18.79 81.21

1) Gravel Content ( + 4.75 mm ) = 2.95 %


2) Sand Content ( 0.075 - 4.75 mm ) = 15.84 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 81.21 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 09.05.17 Date of Testing:- 11.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1222

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 20.60 20.60 2.06 97.94

4 2.000 26.90 47.50 4.75 95.25

5 0.425 50.10 97.60 9.76 90.24

6 0.075 43.20 140.80 14.08 85.92

1) Gravel Content ( + 4.75 mm ) = 2.06 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.02 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.92 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 09.05.17 Date of Testing:- 11.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1223

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 18.50 18.50 1.85 98.15

4 2.000 16.10 34.60 3.46 96.54

5 0.425 70.90 105.50 10.55 89.45

6 0.075 43.30 148.80 14.88 85.12

1) Gravel Content ( + 4.75 mm ) = 1.85 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.03 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.12 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 10.05.17 Date of Testing:- 12.05.17

Source of Material :- Near Br-17 RHS 3.5 KM Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1224

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.10 21.10 2.11 97.89

4 2.000 22.30 43.40 4.34 95.66

5 0.425 54.10 97.50 9.75 90.25

6 0.075 42.40 139.90 13.99 86.01

1) Gravel Content ( + 4.75 mm ) = 2.11 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.88 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.01 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 10.05.17 Date of Testing:- 12.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1225

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 19.60 19.60 1.96 98.04

4 2.000 15.90 35.50 3.55 96.45

5 0.425 72.00 107.50 10.75 89.25

6 0.075 38.30 145.80 14.58 85.42

1) Gravel Content ( + 4.75 mm ) = 1.96 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.62 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.42 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 11.05.17 Date of Testing:- 13.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1226

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.50 21.50 2.15 97.85

4 2.000 22.90 44.40 4.44 95.56

5 0.425 53.10 97.50 9.75 90.25

6 0.075 98.50 196.00 19.60 80.40

1) Gravel Content ( + 4.75 mm ) = 2.15 %


2) Sand Content ( 0.075 - 4.75 mm ) = 17.45 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 80.40 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 12.05.17 Date of Testing:- 14.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1227

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 15.80 15.80 1.58 98.42

4 2.000 21.70 37.50 3.75 96.25

5 0.425 66.00 103.50 10.35 89.65

6 0.075 53.30 156.80 15.68 84.32

1) Gravel Content ( + 4.75 mm ) = 1.58 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.10 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.32 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 12.05.17 Date of Testing:- 14.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1228

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 20.10 20.10 2.01 97.99

4 2.000 23.40 43.50 4.35 95.65

5 0.425 54.00 97.50 9.75 90.25

6 0.075 48.90 146.40 14.64 85.36

1) Gravel Content ( + 4.75 mm ) = 2.01 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.63 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.36 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 12.05.17 Date of Testing:- 14.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1229

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 25.80 25.80 2.58 97.42

4 2.000 17.70 43.50 4.35 95.65

5 0.425 54.00 97.50 9.75 90.25

6 0.075 57.10 154.60 15.46 84.54

1) Gravel Content ( + 4.75 mm ) = 2.58 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.88 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.54 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 14.05.17 Date of Testing:- 16.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1230

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 26.60 26.60 2.66 97.34

4 2.000 10.90 37.50 3.75 96.25

5 0.425 68.00 105.50 10.55 89.45

6 0.075 59.60 165.10 16.51 83.49

1) Gravel Content ( + 4.75 mm ) = 2.66 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.85 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 83.49 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 14.05.17 Date of Testing:- 16.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1231

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 26.30 26.30 2.63 97.37

4 2.000 11.20 37.50 3.75 96.25

5 0.425 68.00 105.50 10.55 89.45

6 0.075 61.90 167.40 16.74 83.26

1) Gravel Content ( + 4.75 mm ) = 2.63 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.11 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 83.26 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 15.05.17 Date of Testing:- 17.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1232

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 12.20 12.20 1.22 98.78

4 2.000 29.30 41.50 4.15 95.85

5 0.425 56.40 97.90 9.79 90.21

6 0.075 17.00 114.90 11.49 88.51

1) Gravel Content ( + 4.75 mm ) = 1.22 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.27 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.51 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 16.05.17 Date of Testing:- 18.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1233

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 28.80 28.80 2.88 97.12

4 2.000 5.70 34.50 3.45 96.55

5 0.425 73.50 108.00 10.80 89.20

6 0.075 66.00 174.00 17.40 82.60

1) Gravel Content ( + 4.75 mm ) = 2.88 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.52 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 82.60 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.05.17 Date of Testing:- 20.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1234

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 23.10 23.10 2.31 97.69

4 2.000 11.40 34.50 3.45 96.55

5 0.425 73.50 108.00 10.80 89.20

6 0.075 66.10 174.10 17.41 82.59

1) Gravel Content ( + 4.75 mm ) = 2.31 %


2) Sand Content ( 0.075 - 4.75 mm ) = 15.10 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 82.59 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.05.17 Date of Testing:- 20.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1235

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 15.80 15.80 1.58 98.42

4 2.000 29.70 45.50 4.55 95.45

5 0.425 52.00 97.50 9.75 90.25

6 0.075 56.80 154.30 15.43 84.57

1) Gravel Content ( + 4.75 mm ) = 1.58 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.85 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.57 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.05.17 Date of Testing:- 20.05.17

Source of Material :- Barada Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Barada Sample No.:- 1236

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 12.00 12.00 1.20 98.80

4 2.000 33.50 45.50 4.55 95.45

5 0.425 52.00 97.50 9.75 90.25

6 0.075 16.60 114.10 11.41 88.59

1) Gravel Content ( + 4.75 mm ) = 1.20 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.21 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.59 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.05.17 Date of Testing:- 20.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1237

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 10.80 10.80 1.08 98.92

4 2.000 23.70 34.50 3.45 96.55

5 0.425 72.90 107.40 10.74 89.26

6 0.075 16.50 123.90 12.39 87.61

1) Gravel Content ( + 4.75 mm ) = 1.08 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.31 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.61 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 24.05.17 Date of Testing:- 26.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1238

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 13.90 13.90 1.39 98.61

4 2.000 29.70 43.60 4.36 95.64

5 0.425 50.90 94.50 9.45 90.55

6 0.075 42.50 137.00 13.70 86.30

1) Gravel Content ( + 4.75 mm ) = 1.39 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.31 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.30 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 26.05.17 Date of Testing:- 28.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1239

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 15.20 15.20 1.52 98.48

4 2.000 19.40 34.60 3.46 96.54

5 0.425 72.90 107.50 10.75 89.25

6 0.075 20.20 127.70 12.77 87.23

1) Gravel Content ( + 4.75 mm ) = 1.52 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.25 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.23 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 26.05.17 Date of Testing:- 28.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1240

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 3.20 3.20 0.32 99.68

4 2.000 42.40 45.60 4.56 95.44

5 0.425 47.70 93.30 9.33 90.67

6 0.075 45.70 139.00 13.90 86.10

1) Gravel Content ( + 4.75 mm ) = 0.32 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.58 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.10 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 26.05.17 Date of Testing:- 28.05.17

Source of Material :- Haridaspur Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Haridaspur Sample No.:- 1241

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 18.80 18.80 1.88 98.12

4 2.000 17.70 36.50 3.65 96.35

5 0.425 71.00 107.50 10.75 89.25

6 0.075 51.50 159.00 15.90 84.10

1) Gravel Content ( + 4.75 mm ) = 1.88 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.02 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.10 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 28.05.17 Date of Testing:- 30.05.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1242

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 10.60 10.60 1.06 98.94

4 2.000 30.90 41.50 4.15 95.85

5 0.425 56.10 97.60 9.76 90.24

6 0.075 39.30 136.90 13.69 86.31

1) Gravel Content ( + 4.75 mm ) = 1.06 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.63 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.31 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 28.05.17 Date of Testing:- 30.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1243

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 26.30 26.30 2.63 97.37

4 2.000 11.20 37.50 3.75 96.25

5 0.425 68.00 105.50 10.55 89.45

6 0.075 50.40 155.90 15.59 84.41

1) Gravel Content ( + 4.75 mm ) = 2.63 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.96 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.41 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 28.05.17 Date of Testing:- 30.05.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1244

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.60 0.60 0.06 99.94

4 2.000 36.90 37.50 3.75 96.25

5 0.425 68.00 105.50 10.55 89.45

6 0.075 3.30 108.80 10.88 89.12

1) Gravel Content ( + 4.75 mm ) = 0.06 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.82 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 89.12 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 29.05.17 Date of Testing:- 31.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1245

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 5.80 5.80 0.58 99.42

4 2.000 37.70 43.50 4.35 95.65

5 0.425 54.40 97.90 9.79 90.21

6 0.075 42.30 140.20 14.02 85.98

1) Gravel Content ( + 4.75 mm ) = 0.58 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.44 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.98 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 29.05.17 Date of Testing:- 31.05.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1246

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 11.90 11.90 1.19 98.81

4 2.000 25.60 37.50 3.75 96.25

5 0.425 70.40 107.90 10.79 89.21

6 0.075 45.40 153.30 15.33 84.67

1) Gravel Content ( + 4.75 mm ) = 1.19 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.14 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.67 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.06.17 Date of Testing:- 04.06.17

Source of Material :- Near Br-17 RHS 3.5 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Srirampur Sample No.:- 1247

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.00 21.00 2.10 97.90

4 2.000 22.40 43.40 4.34 95.66

5 0.425 52.10 95.50 9.55 90.45

6 0.075 54.20 149.70 14.97 85.03

1) Gravel Content ( + 4.75 mm ) = 2.10 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.87 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.03 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.06.17 Date of Testing:- 09.06.17

Source of Material :- Near Ch-23+500 LHS 5.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Gobandia Sample No.:- 1248

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 15.20 15.20 1.52 98.48

4 2.000 22.30 37.50 3.75 96.25

5 0.425 69.20 106.70 10.67 89.33

6 0.075 35.40 142.10 14.21 85.79

1) Gravel Content ( + 4.75 mm ) = 1.52 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.69 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.79 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 09.06.17 Date of Testing:- 11.06.17

Source of Material :- Near Ch-36+740 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Fakirabad Sample No.:- 1249

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 15.20 15.20 1.52 98.48

4 2.000 30.30 45.50 4.55 95.45

5 0.425 52.40 97.90 9.79 90.21

6 0.075 56.00 153.90 15.39 84.61

1) Gravel Content ( + 4.75 mm ) = 1.52 %


2) Sand Content ( 0.075 - 4.75 mm ) = 13.87 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 84.61 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 01.12.17 Date of Testing:- 04.12.17

Source of Material :- Near Ch-39+500 LHS 8.0 KM Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Indupur Sample No.:- 1266

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.00 0.00 0.00 100.00

4 2.000 41.50 41.50 4.15 95.85

5 0.425 116.00 157.50 15.75 84.25

6 0.075 446.70 604.20 60.42 39.58

1) Gravel Content ( + 4.75 mm ) = 0.00 %


2) Sand Content ( 0.075 - 4.75 mm ) = 60.42 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 39.58 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 01.12.17 Date of Testing:- 04.12.17

Source of Material :- Near Ch-Br-61A LHS 8.0 Km Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Raghudeipur Sample No.:- 1267

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 22.90 22.90 2.29 97.71

4 2.000 29.30 52.20 5.22 94.78

5 0.425 65.30 117.50 11.75 88.25

6 0.075 197.70 315.20 31.52 68.48

1) Gravel Content ( + 4.75 mm ) = 2.29 %


2) Sand Content ( 0.075 - 4.75 mm ) = 29.23 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 68.48 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.12.17 Date of Testing:- 04.12.17

Source of Material :- Near Ch-0+850 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Haridaspur Sample No.:- 1268

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 136.00 136.00 13.60 86.40

4 2.000 40.00 176.00 17.60 82.40

5 0.425 67.50 243.50 24.35 75.65

6 0.075 252.50 496.00 49.60 50.40

1) Gravel Content ( + 4.75 mm ) = 13.60 %


2) Sand Content ( 0.075 - 4.75 mm ) = 36.00 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 50.40 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.12.17 Date of Testing:- 04.12.17

Source of Material :- Near Ch-17+300 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Achutabasanta Sample No.:- 1269

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 121.20 121.20 12.12 87.88

4 2.000 59.20 180.40 18.04 81.96

5 0.425 47.10 227.50 22.75 77.25

6 0.075 228.90 456.40 45.64 54.36

1) Gravel Content ( + 4.75 mm ) = 12.12 %


2) Sand Content ( 0.075 - 4.75 mm ) = 33.52 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 54.36 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 04.12.17 Date of Testing:- 06.12.17

Source of Material :- Near Ch-0+600 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Haridaspur Sample No.:- 1270

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 128.50 128.50 12.85 87.15

4 2.000 47.00 175.50 17.55 82.45

5 0.425 33.50 209.00 20.90 79.10

6 0.075 278.00 487.00 48.70 51.30

1) Gravel Content ( + 4.75 mm ) = 12.85 %


2) Sand Content ( 0.075 - 4.75 mm ) = 35.85 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 51.30 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.12.17 Date of Testing:- 09.12.17
Source of Material :- Near Ch-4+000 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Haridaspur Sample No.:- 1271

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.00 21.00 2.10 97.90

4 2.000 37.80 58.80 5.88 94.12

5 0.425 48.70 107.50 10.75 89.25

6 0.075 68.50 176.00 17.60 82.40

1) Gravel Content ( + 4.75 mm ) = 2.10 %


2) Sand Content ( 0.075 - 4.75 mm ) = 15.50 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 82.40 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.12.17 Date of Testing:- 09.12.17
Source of Material :- Near Ch-17+300 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1272

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 11.90 11.90 1.19 98.81

4 2.000 36.00 47.90 4.79 95.21

5 0.425 37.60 85.50 8.55 91.45

6 0.075 88.30 173.80 17.38 82.62

1) Gravel Content ( + 4.75 mm ) = 1.19 %


2) Sand Content ( 0.075 - 4.75 mm ) = 16.19 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 82.62 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 31.12.17 Date of Testing:- 02.01.18
Source of Material :- Near Ch-39+800 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Indupur Sample No.:- 1273

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 10.50 10.50 1.05 98.95

4 2.000 57.00 67.50 6.75 93.25

5 0.425 57.00 124.50 12.45 87.55

6 0.075 184.80 309.30 30.93 69.07

1) Gravel Content ( + 4.75 mm ) = 1.05 %


2) Sand Content ( 0.075 - 4.75 mm ) = 29.88 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 69.07 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 31.12.17 Date of Testing:- 02.01.18
Source of Material :- Near Ch-16+200 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1274

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 21.00 21.00 2.10 97.90

4 2.000 23.00 44.00 4.40 95.60

5 0.425 43.50 87.50 8.75 91.25

6 0.075 37.90 125.40 12.54 87.46

1) Gravel Content ( + 4.75 mm ) = 2.10 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.44 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.46 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 31.12.17 Date of Testing:- 02.01.18
Source of Material :- Near Ch-39+380 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Indupur Sample No.:- 1275

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 1.10 1.10 0.11 99.89

4 2.000 56.60 57.70 5.77 94.23

5 0.425 65.80 123.50 12.35 87.65

6 0.075 162.00 285.50 28.55 71.45

1) Gravel Content ( + 4.75 mm ) = 0.11 %


2) Sand Content ( 0.075 - 4.75 mm ) = 28.44 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 71.45 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 02.01.18 Date of Testing:- 03.01.18
Source of Material :- Near Ch-25+000 RHS Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Lalitgiri Sample No.:- 1276

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 12.50 12.50 1.25 98.75

4 2.000 55.00 67.50 6.75 93.25

5 0.425 20.00 87.50 8.75 91.25

6 0.075 26.50 114.00 11.40 88.60

1) Gravel Content ( + 4.75 mm ) = 1.25 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.15 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.60 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 03.01.18 Date of Testing:- 04.01.18
Source of Material :- Near Ch-17+100 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1277

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 31.50 31.50 3.15 96.85

4 2.000 45.00 76.50 7.65 92.35

5 0.425 21.00 97.50 9.75 90.25

6 0.075 33.90 131.40 13.14 86.86

1) Gravel Content ( + 4.75 mm ) = 3.15 %


2) Sand Content ( 0.075 - 4.75 mm ) = 9.99 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.86 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 03.01.18 Date of Testing:- 04.01.18
Source of Material :- Near Ch-38+120 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Indupur Sample No.:- 1278

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 5.30 5.30 0.53 99.47

4 2.000 48.70 54.00 5.40 94.60

5 0.425 122.80 176.80 17.68 82.32

6 0.075 104.30 281.10 28.11 71.89

1) Gravel Content ( + 4.75 mm ) = 0.53 %


2) Sand Content ( 0.075 - 4.75 mm ) = 27.58 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 71.89 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 04.01.18 Date of Testing:- 05.01.18
Source of Material :- Near Ch-38+120 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Chhata Sample No.:- 1279

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.90 0.90 0.09 99.91

4 2.000 53.10 54.00 5.40 94.60

5 0.425 33.50 87.50 8.75 91.25

6 0.075 12.30 99.80 9.98 90.02

1) Gravel Content ( + 4.75 mm ) = 0.09 %


2) Sand Content ( 0.075 - 4.75 mm ) = 9.89 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 90.02 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 07.01.18 Date of Testing:- 08.01.18
Source of Material :- Near Ch-16+800 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1283

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 19.50 19.50 1.95 98.05

4 2.000 34.50 54.00 5.40 94.60

5 0.425 33.50 87.50 8.75 91.25

6 0.075 21.60 109.10 10.91 89.09

1) Gravel Content ( + 4.75 mm ) = 1.95 %


2) Sand Content ( 0.075 - 4.75 mm ) = 8.96 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 89.09 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 10.01.18 Date of Testing:- 11.01.18
Source of Material :- Near Ch-17+400 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1286

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 25.50 25.50 2.55 97.45

4 2.000 21.20 46.70 4.67 95.33

5 0.425 50.80 97.50 9.75 90.25

6 0.075 29.20 126.70 12.67 87.33

1) Gravel Content ( + 4.75 mm ) = 2.55 %


2) Sand Content ( 0.075 - 4.75 mm ) = 10.12 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.33 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 10.01.18 Date of Testing:- 11.01.18
Source of Material :- Near Ch-17+500 Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1287

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 30.20 30.20 3.02 96.98

4 2.000 26.10 56.30 5.63 94.37

5 0.425 48.20 104.50 10.45 89.55

6 0.075 19.90 124.40 12.44 87.56

1) Gravel Content ( + 4.75 mm ) = 3.02 %


2) Sand Content ( 0.075 - 4.75 mm ) = 9.42 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 87.56 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 15.01.18 Date of Testing:- 16.01.18
Source of Material :- Near Br-45C LHS 700 Mtr Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Palai Sample No.:- 1294

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 5.60 5.60 0.56 99.44

4 2.000 37.90 43.50 4.35 95.65

5 0.425 46.30 89.80 8.98 91.02

6 0.075 41.40 131.20 13.12 86.88

1) Gravel Content ( + 4.75 mm ) = 0.56 %


2) Sand Content ( 0.075 - 4.75 mm ) = 12.56 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 86.88 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 15.01.18 Date of Testing:- 16.01.18
Source of Material :- Near Br-45C LHS 700 Mtr Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Palai Sample No.:- 1295

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 3.50 3.50 0.35 99.65

4 2.000 40.00 43.50 4.35 95.65

5 0.425 33.00 76.50 7.65 92.35

6 0.075 38.20 114.70 11.47 88.53

1) Gravel Content ( + 4.75 mm ) = 0.35 %


2) Sand Content ( 0.075 - 4.75 mm ) = 11.12 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.53 %


Remarks :-

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.01.18 Date of Testing:- 19.01.18
Source of Material :- Kantigadia Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1301

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 18.50 18.50 1.85 98.15

4 2.000 22.80 41.30 4.13 95.87

5 0.425 33.00 74.30 7.43 92.57

6 0.075 29.70 104.00 10.40 89.60

1) Gravel Content ( + 4.75 mm ) = 1.85 %


2) Sand Content ( 0.075 - 4.75 mm ) = 8.55 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 89.60 %


1

Tested by Checked by

T & T Representative RVNL Representative


Rail Vikas Nigam limited

Construction of New Bridges Railway line from Haridaspur(incl) Km 0.00 to


Name of the Project :- Kendrapara (Excl) KM 42.02 on KhurdaRoad division of east Coast Railway in the
state of Orissa,india
Name of the Client :- RVNL
Name of the Consultant :- -
Name of the Contractor :-
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.01.18 Date of Testing:- 19.01.18
Source of Material :- Kantigadia Frequency Test / Source Approval

Type of Material & Layer :- Soil Weight in gms :- 1000

Boorrow Area :- Kantigadia Sample No.:- 1302

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 14.60 14.60 1.46 98.54

4 2.000 39.60 54.20 5.42 94.58

5 0.425 33.30 87.50 8.75 91.25

6 0.075 24.10 111.60 11.16 88.84

1) Gravel Content ( + 4.75 mm ) = 1.46 %


2) Sand Content ( 0.075 - 4.75 mm ) = 9.70 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 88.84 %


1

Tested by Checked by

T & T Representative RVNL Representative


Name of Project - Execution of Roadbed (earthwork in Cutting & Banking), Major Bridges, Minor
Name of the Project :- Bridges, ROBs, RUBs/LHSs, Building works, Laying of Blanket and other allied items between
km.172 to 194 (22 Route km) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway

Name of the Client :- E.Co.Railway


Name of the Consultant :- Lion Engineering Consultants Private Limited (Bhopal)
Name of the Contractor :- ARSS INFRASTRUCTURE PROJECTS LIMITED (BHUBANESWAR)
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 17.04.2022 Date of Testing:- 18.04.2022
Source of Material :- CH 172/250 OGL Frequency Test / Source Approval

Type of Material & Layer :- SOIL Weight in gms :- 1000

Boorrow Area :- Sample No.:-

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.00 0.00 0.00 100.00

4 2.000 36.00 36.00 3.60 96.40

5 0.425 14.20 50.20 5.02 94.98

6 0.075 94.80 145.00 14.50 85.50

1) Gravel Content ( + 4.75 mm ) = 0.00 %


2) Sand Content ( 0.075 - 4.75 mm ) = 14.50 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 85.50 %


1

Tested by Checked by

CONTRACTOR'S Representative PMC/E.Co.R Representative


Name of Project - Execution of Roadbed (earthwork in Cutting & Banking), Major Bridges, Minor
Name of the Project :- Bridges, ROBs, RUBs/LHSs, Building works, Laying of Blanket and other allied items between
km.172 to 194 (22 Route km) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway

Name of the Client :- E.Co.Railway


Name of the Consultant :- Lion Engineering Consultants Private Limited (Bhopal)
Name of the Contractor :- ARSS INFRASTRUCTURE PROJECTS LIMITED (BHUBANESWAR)
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 18.04.2022 Date of Testing:- 19.04.2022
Source of Material :- CH 172/750 OGL Frequency Test / Source Approval

Type of Material & Layer :- SOIL Weight in gms :- 1000

Boorrow Area :- Sample No.:-

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.00 0.00 0.00 100.00

4 2.000 57.30 57.30 5.73 94.27

5 0.425 28.20 85.50 8.55 91.45

6 0.075 122.20 207.70 20.77 79.23

1) Gravel Content ( + 4.75 mm ) = 0.00 %


2) Sand Content ( 0.075 - 4.75 mm ) = 20.77 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 79.23 %


1

Tested by Checked by

CONTRACTOR'S Representative PMC/E.Co.R Representative


Name of Project - Execution of Roadbed (earthwork in Cutting & Banking), Major Bridges, Minor
Name of the Project :- Bridges, ROBs, RUBs/LHSs, Building works, Laying of Blanket and other allied items between
km.172 to 194 (22 Route km) of Khurda Road-Bolangir new BG Rail Link project of E.Co.Railway

Name of the Client :- E.Co.Railway


Name of the Consultant :- Lion Engineering Consultants Private Limited (Bhopal)
Name of the Contractor :- ARSS INFRASTRUCTURE PROJECTS LIMITED (BHUBANESWAR)
GRAIN SIZE ANALYSIS OF SOIL
(As per IS 2720 PART-IV)
Date of Sampling :- 09.02.2022 Date of Testing:- 11.02.2022
Source of Material :- CH 190/400 OGL Frequency Test / Source Approval

Type of Material & Layer :- SOIL Weight in gms :- 1000

Boorrow Area :- Sample No.:-

Weight Cum.Weight Cum. %


Sr. No. Sieve Size (mm) Cum. % Passing
Retained (gms) Retained (gms) Retained

1 75.000 0 0 0 100

2 19.000 0 0 0 100

3 4.750 0.00 0.00 0.00 100.00

4 2.000 26.90 26.90 2.69 97.31

5 0.425 21.50 48.40 4.84 95.16

6 0.075 146.50 194.90 19.49 80.51

1) Gravel Content ( + 4.75 mm ) = 0.00 %


2) Sand Content ( 0.075 - 4.75 mm ) = 19.49 % .

3) Silt & Clay Content ( 0 - 0.075 mm ) = 80.51 %


1

Tested by Checked by

CONTRACTOR'S Representative PMC/E.Co.R Representative