Professional Documents
Culture Documents
1、Zhejiang Yongkang City "Smart Water Affairs" Urban and Rural Water
Yongkang City's "Smart Water Affairs" urban and rural water supply integrated management
and control project, invested nearly 16 million yuan by the Municipal Water Investment Group,
built 79 Village water supply stations and 6 large-scale water plants, the first "five water
integration" in the province. Unified management mode. Real-time 24-hour remote real-time
monitoring of water quality is achieved through "smart water affairs" equipment. The data
transmission module is used to send remote data back to the platform. Real-time data such as
PH, residual chlorine, turbidity, and real-time flow are clear at a glance. The pipeline network
water quality monitoring system (PWQ-2000), which has the characteristics of integrated
design, small footprint and high integration.
2、Guizhou Water Weng'an Co., Ltd. Xipo Water Plant
In order to monitor the water quality of Xipo Water Plant in real time and ensure the water
quality of water supply, the online monitoring equipment of the water plant is selected from
Pubes PWQ-2000 pipe network water quality monitoring system.
Since Weng'an County's "one city and four districts" water supply project has completed the
construction of some reservoirs, water plants and water supply pipe networks, the water
supply capacity of the county's urban areas has been significantly improved.
Qingyuan Jiangnan Water Plant is located in the K21 area of Zhouxin, west of
Wuhan-Guangzhou high-speed railway. It is the largest water plant in northern Guangdong.
The daily water supply capacity of the first phase can reach 400,000 tons, and the second
phase is expected to complete a daily water supply of 800,000 tons. .
The water supply system has many features, such as greatly improved water sources, the
highest and most advanced water effluent standards and processes in South China, and
energy conservation and emission reduction. In order to speed up the improvement of the
water supply facilities of the water plant and strengthen the safety management of the water
plant, the Qingyuan Jiangnan Water Plant began to use the PWQ-2000 pipe network water
quality monitoring system produced by Probest in 2020.
As shown in the figure below, the on-site installation of the equipment is very convenient. The
user only needs to connect the power supply and the water inlet and outlet pipelines to
complete the equipment installation. The overall internal wiring and waterway integration of the
equipment are highly integrated.
Feedback from customers: The design of the instrument is reasonable, the operation is simple,
the installation is convenient, and the maintenance is less during use. The test data is good
and it is recommended to use.
4、Other cases
QTY
Project name Product name
sets
Yongkang City "Smart Water" Urban and Rural Integrated Management PWQ-2000 Pipe network water
79
and Control Application System Project quality monitoring system
Awati County, two townships, one town and four areas of drinking water PWQ-2000
Water quality monitoring of the Arab League water supply network PWQ-2000 14
Shaoguan Nanxiong City "Smart Water" Urban and Rural Water Supply PWQ-2000
1
Integrated Management and Control System Project