You are on page 1of 1

CTI Engineering International Co., Ltd.

THE CONSULTANCY SERVICES FOR THE CONSTRUCTION SUPERVISION OF THE FLOOD RISK
MANAGEMENT PROJECT (FRIMP) FOR THE CAGAYAN RIVER, TAGOLOAN RIVER AND IMUS RIVER
(JICA LOAN AGREEMENT NO. PH-P253)

WEATHER CHART
Cover Period: April 01-15, 2022

Imus River Basin Sub-Project Under the Flood Risk Management Project
(FRIMP) for Cagayan River, Tagoloan River & Imus River, Jica PH-P253 Contract No. 4A03-15-F-00104

Location: City of Imus, Cavite Sheet No.: 1 of 1


Contractor: CAVDEAL - Cavite Ideal International Construction and Development Corporation Corporation

1 2 3 4 5 6

7 8 9 10 11 12

13 14 15 16 17 18

19 20 21 22 23 24

25 26 27 28 29 30

12PM
11PM 1PM

12AM 2PM
10PM

DAY OF THE MONTH


3AM
LEGEND:
FAIR
9PM
9AM 1 3PM

CLOUDY
6AM
RAINSHOWER 4PM
8PM
HEAVY RAINS
TIME OF DAY
7PM 5PM
STORMY
6PM

Prepared By: Submitted By: Noted By:

Lemuel Jake T. Tapec Arjine I. Ramirez Shuji Kaku


Project Inspector Structural Engineer Project Manager

You might also like