Professional Documents
Culture Documents
Laboratory Comments:
Storage Charges: Samples will be stored free for 3 months. After this time storage fees will be applied unless advised
by client to return or dispose. Courier and disposal costs may be incurred.
Made Ratsukeni
Operation Manager
Page 1 of 3 Geoservices Mineral Division
The Certification Logo's demonstrate that the laboratory has a Management System to ensure compliance to the System standards for
ISO 9001:2015 and ISO 45001:2018 accreditation.
The results contained in this report relate only to the sample(s) submitted for testing. Geoservices Mineral Laboratory accepts no responsibility
for the representativeness of the sample(s) submitted for testing. All pages of this report have been checked and approved for release.
CIK.MIN.11714_Final_Report GEO-MIN-FM-044
PT. Geoservices - GeoAssay Laboratory
Final Report
Job No : CIK.MIN.11714 Note
Date received : 24-May-22 IS Insufficient Sample
Date Completed : 7-Jun-22 NA Not Analysed
Client name : Pusat Penelitian Dan Pengembangan SNR Sample not received
Order number : Smelting Telurida Sample Identification
Project : MINERAL DA&REP Replicate analysis of same sample pulp
No# Samples : 1 DR&DUP Pulverizer Duplicate
Wt Wt PREP_TC g 1 31
Page 2 of 3
CIK.MIN.11714_Final_Report GEO-MIN-FM-044
PT. Geoservices - GeoAssay Laboratory
Final Report
Job No : CIK.MIN.11714 Note
Date received : 24-May-22 IS Insufficient Sample
Date Completed : 7-Jun-22 NA Not Analysed
Client name : Pusat Penelitian Dan Pengembangan SNR Sample not received
Order number : Smelting Telurida Sample Identification
Project : MINERAL DA&REP Replicate analysis of same sample pulp
No# Samples : 1 DR&DUP Pulverizer Duplicate
Page 3 of 3
CIK.MIN.11714_Final_Report GEO-MIN-FM-044