Professional Documents
Culture Documents
The CONTRACTOR shall give below the list of special maintenance and erection
tools and tackles offered by him. (These shall be in addition to the tools stipulated
in the technical requirements of the specification).
Specification for 350 MW BTG island works Title: Schedule of Maintenance Tools
and
Tackles.
0 MW Owner: KVK
Specification for 350 MW BTG island works Title: Schedule of Maintenance Tools
and
Tackles.
0 MW Owner: KVK
Specification for 350 MW BTG island works Title: Schedule of Maintenance Tools
and
Tackles.
0 MW Owner: KVK
Specification for 350 MW BTG island works Title: Schedule of Maintenance Tools
and
Tackles.
0 MW Owner: KVK
Specification for 350 MW BTG island works Title: Schedule of Maintenance Tools
and
Tackles.