Budget for Fire Protection (Hydrant With Materials)

Project: Gulshan Center Point 8th floor

Fire Protection System Supply / Material


SL no Description Unit Total QTY
Unit Price
BDT
1 Ms Sch-40 25mm RM 200 x
2 Ms Sch-40 32mm RM 12 x
3 Ms Sch-40 40mm RM 20 x
4 Ms Sch-40 50mm RM 13 x
5 Ms Sch-40 65mm RM 10 x
6 Ms Sch-40 80mm RM 10 x
7 Ms Sch-40 100mm RM 6 x
8 Reducers 32X25 mm Nos 6 135.00
9 Reducers 40X25 mm Nos 5 142.00
10 Reducers 40X32 mm Nos 3 142.00
11 Reducers 50X25 mm Nos 0 168.00
12 Reducers 50X40 mm Nos 2 168.00
13 Reducers 65X50 mm Nos 1 312.00
14 Reducers 80X65 mm Nos 1 365.00
15 Reducers 100X80 mm Nos 1 508.00
16 T Fitting25mm X25mm 2 272.00
17 T Fitting 40mm X40mm Nos 1
18 T Fitting 50mm X50mm Nos 1 522.00
19 T Fitting 65mm X65mm Nos 0 742.00
20 Elbow 25mm Nos 60 85.00
21 Sprinkler Soket thiknes 5 mm Nos 60 95.00
22 Hanger Support & Flange & welding rod Lot 1
30,000.00
23 Thread Tape Nos 50 30.00
24 Upright Sprinkler- k 8.0,Tyco/Viking Nos 52 x
25 Pendent Sprinkler- k-5.6,Tyco/Viking Nos 52 x
Hose Reel With Cabener
26
Mounted,Emaco/China Nos 2
x
27 Commisioning Charge Job 1 x
Supply / Material Total Price in BDT
Installation Total Price in BDT
VAT @ 7.5% for Materials in BDT
VAT @ 10% for Installation / Service Work in BDT
Total Including VAT in BDT
Grand Total (Material + Installation) in BDT
Grand Total (Material + Installation) in words Bangladesh Bangladesh Taka Five Lac Sixty-Seven Th
Taka Hundred Seventy-Seven Only
Supply / Material Installation
Total Price BDT Unit Price Total Price BDT
BDT
250.00 50,000.00
285.00 3,420.00
300.00 6,000.00
340.00 4,420.00
390.00 3,900.00
450.00 4,500.00
550.00 3,300.00
810.00 x
710.00 x

- x
336.00 x
312.00 x
365.00 x
508.00 x
544.00 x

522.00 x
- x
5,100.00 x
5,700.00 x
30,000.00 x
1,500.00
150.00 7,800.00
150.00 7,800.00
2,500.00 5,000.00
30,000.00 30,000.00
46,407.00
126,140.00
3,480.53
12,614.00
49,887.53 138,754.00
188,641.25
Bangladesh Taka Five Lac Sixty-Seven Thousand Nine
Hundred Seventy-Seven Only