Ref. Existin2 Text Amended Text
General Note No. 9 Note No.9
Notes for Rubble available from excavation of hard Rubble available from excavation of hard
Road rock, if issued to the contractor shall be rock, shall be issued to the contractor at the
Works) charged @ Rs. 250 per cubic meter of rock rate of Rs. 100 per cubic meter of rock
Page No. excavated. excavated.
5
General Note No. 14 (viii) Note No. 14 (vii)
Notes for The measurement of rock excavation are to be The measurement of rock excavation are to
Bridge done as per the relevant clause of be done as per the relevant clause of
Works) "Specification of Road and Bridge works" of "Specification of Road and Bridge works" of
Page No. MORT&H 5th Revision. All serviceable rock MORT&H 5th Revision. All serviceable rock
7 excavated may be issued to the contractor at excavated shall be issued to the contractor at
the rate ofRs. 250/- per Cum. the rate of Rs. 1001- per Cum.

B. CHAPTER: 12.0 FOUNDATIONS ­


The existing Item No. 12.11 is amended as under ­

SOR
Amended Description Unit Rate
Item
12.11 Sinking well for foundation to levels as per drawing including
dredging, dewatering and drop chiselling as may be necessary,
including sinking by loading with necessary kentledges and other
usual means for the type of work ilc all the .needed plant and
machinery etc. complete as directed and removal of boulders or tree
trunks etc. complete as per drawing and technical specifications.
(Note: Depth of sinking shall be reckoned from bed level) .

A Sandy Soil I

(i) Depth below bed level upto 3.0 M Cum 267.00


(ii) Beyond 3 m upto I Om depth Cum 384.00
(iii) Beyond 10m upto 20m Cum .507.00
(iv) Beyond 20m upto 30 m Cum 951.00
(v) Beyond 30m upto 40 m Cum 2259.00
B Clayey Soil
(i) Depth below bed level upto 3.0 M Cum 388.00
Oi) Beyond 3m upto 10m depth Cum 809.00
(iii) Beyond 10m upto 20 m Cum 1069.00
(iv) Beyond 20m upto 30 m Cum 2005.00
(v) Beyond 30m upto 40 m i Cum 4765.00
C Soft Rock
...
(i) Depth of soft rock strata upto 3m 7.00
D Hard Rock
(i) Depth of hard rock strata upto 3m Cum 973.00

The aforesaid amendments shall come inforce from 14-03-2018.

/
~khilesh Ag::~
Engineer-In-Chief
MP PWD, BHOPAL
Endt. No. SOR/Road/Comm./2016/ ttl? Bhopal, dated 14-03-2018
Copy is forwarded to:
1. PA to Hon'ble Minister, PWD Bhopal.
2. The Principal Secretary, Govt. of M.P. MP PWD, Bhopal.
3. The Director General (Road Development), Ministry of Road Transport
& Highway (Road Wing), Transport, New Delhi.
4. The Secretary, Govt. of M.P. MP PWD, Bhopal.
S. The Chief Technical Examiner, Madhya Pradesh Bhopal.
6. The Commissioner, Housing & Environment, Bhopal.
7. The Accountant General, MP Gwalior/ Bhopal.
8. The Secretary, Lokayukta, MP Bhopal.
9. The Engineer-in-Chief, M. P. Road Development Corporation Ltd., Bhopal.
10. All Chief Engineers Madhya Pradesh Public Works Department.
11. The Chief Engineer, Rural Engineer Services Madhya Pradesh Bhopal.
12. The Commissioner, Bhopal.
13. The Collector, Bhopal.
14. All Superintending Engineer Madhya Pradesh Public Works Department,
15. The Superintending Engineer, Capital Project Circle, CPA Bhopal.
16. All Executive Engineer, Madhya Pradesh Public Works Department.