Guest House Project G+1 Project Start 11-Feb-22

Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

AD-01 Activity Status Report

WBS
Activity ID Activity Name Original Remaining Activity % Start
Duration Duration Complete

Enterprise All Initiatives


G+1 House Construction
GH-01 Guest House Project G+1
A1000 Start Of Project 0 0 0% 11-Feb-22
GH-01.1 SUB-STRUCTURE
GH-01.1.2 Excavation & Earth Work
A1002 Clearing the site to remove top soil 1 1 0% 11-Feb-22
and other rubbish materials to an
average depth of 200mm.
A1003 Bulk excavation of ordinary soil to a 1 1 0% 12-Feb-22
depth not exceeding 1500mm below
existing ground surface.
A1004 Pit excavation in ordinary soil to a 2 2 0% 14-Feb-22
depth not exceeding 1500mm from
reduced ground level
A1005 Ditto over 1500 mm but not 2 2 0% 16-Feb-22
exceeding 3000mm.
A1006 Trench excavation of ordinary soil to 2 2 0% 18-Feb-22
masonry wall starting from reduced
bulk level to a depth not exceeding
1500mm.
A1007 Backfill around footing and 2 2 0% 21-May-22
foundation columns with selected
material from outside, well rammed in
layers of 200mm thick
A1008 Backfill under hardcore with selected 2 2 0% 24-May-22
material from outside, well rammed in
layers of 200mm thick and
compacted at dry d
A1009 Cart away excavated material up to 2 2 0% 21-Feb-22
10Km from the site
A1010 250mm thick basaltic or equivalent 2 2 0% 26-May-22
Stone hard core well rolled,
consolidated and blinded with
crushed stone.

Subtotal 91 91 11-Feb-22

GH-01.1.3 Concrete Work


GH-01.1.3.1 Lean Concrete [50mm thick]
A1014 a. Under Stone masonry 5 5 0% 04-May-22
A1015 b. Under footing pad 5 5 0% 01-Mar-22
A1016 c. Under basement beams 5 5 0% 11-Feb-22

Subtotal 75 75 11-Feb-22

GH-01.1.3.2 Reinforced Concrete


A1019 a. For Isolated footing pads 5 5 0% 12-Mar-22
A1020 b. For foundation columns 5 5 0% 30-Mar-22
A1021 c. For basement beams 5 5 0% 05-Apr-22
A1022 d. For 100mm thick basement Floor 5 5 0% 11-Apr-22
slabs
A1023 e. For basement columns 5 5 0% 28-Apr-22
A1024 f. For 150mm thick ground Floor 5 5 0% 09-Jun-22
slabs
A1025 g. In Concrete stair 5 5 0% 15-Jun-22
A1026 h. In basement level retaining wall 5 5 0% 28-Apr-22

Subtotal 86 86 12-Mar-22

GH-01.1.3.3 Formwork
A1029 a. For Isolated footing pads 5 5 0% 23-Feb-22
A1030 b. For foundation columns 5 5 0% 18-Mar-22
A1031 c. For basement beams 5 5 0% 24-Mar-22
A1032 d. For basement columns 5 5 0% 22-Apr-22
A1033 e. For 150mm thick ground Floor 5 5 0% 28-May-22
slabs
A1034 f. In Concrete stair 5 5 0% 23-May-22
A1035 g. In basement level retaining wall 5 5 0% 22-Apr-22

Subtotal 86 86 23-Feb-22

GH-01.1.3.4 Reinforcement Bar


A1037 a) Footing pad rebar 2 2 0% 07-Mar-22
A1038 b) For basement columns 2 2 0% 16-Apr-22

Page 1 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

Finish Primary Resource

11-Feb-22 F.Forman

12-Feb-22 F.Forman

15-Feb-22 C.Carpenter

17-Feb-22 C.Carpenter

19-Feb-22 C.Carpenter

23-May-22 DL.Daily Laborer

25-May-22 DL.Daily Laborer

22-Feb-22 DL.Daily Laborer

27-May-22 DL.Daily Laborer

27-May-22

09-May-22 C.Carpenter
05-Mar-22 C.Carpenter
16-Feb-22 C.Carpenter

09-May-22

17-Mar-22 C.Carpenter
04-Apr-22 C.Carpenter
09-Apr-22 C.Carpenter
15-Apr-22 C.Carpenter

03-May-22 C.Carpenter
14-Jun-22 C.Carpenter

20-Jun-22 C.Carpenter
03-May-22 C.Carpenter

20-Jun-22

28-Feb-22 C.Carpenter
23-Mar-22 C.Carpenter
29-Mar-22 C.Carpenter
27-Apr-22 C.Carpenter
02-Jun-22 C.Carpenter

28-May-22 C.Carpenter
27-Apr-22 C.Carpenter

02-Jun-22

08-Mar-22 DL.Daily Laborer


18-Apr-22 DL.Daily Laborer

Page 2 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

AD-01 Activity Status Report

WBS
Activity ID Activity Name Original Remaining Activity % Start
Duration Duration Complete

A1039 c) For 150mm thick ground floor slab 2 2 0% 03-Jun-22

A1040 d) For basement beam 2 2 0% 18-Mar-22


A1041 e) In basement level retaining wall 2 2 0% 16-Apr-22
A1042 f) For foundation columns 2 2 0% 24-Mar-22
A1043 g) In Concrete stair 2 2 0% 09-Jun-22
A1044 h) For 100mm thick basement floor 2 2 0% 30-Mar-22

Subtotal 83 83 07-Mar-22

Subtotal 111 111 11-Feb-22

GH-01.1.4 Masonary Work


A1045 Basaltic or Equivalent stone masonry 1 1 0% 10-May-22
wall bedded in cement sand mortar
(1:3) below ground level to a depth
not exceedin
A1047 Basaltic or Equivalent stone masonry 2 2 0% 16-May-22
wall bedded in cement sand mortar
(1:3) belowAbove ground level to a
depth not ex

Subtotal 7 7 10-May-22

Subtotal 111 111 11-Feb-22

GH-01.5 SUPER-STRUCTURE
GH-01.5.6 Concrete Work
GH-01.5.6.1 Reinforced Concrete
A1053 a. In Elevation Columns 2 2 0% 27-Jun-22
A1054 b. In Intermediate Floor beams 2 2 0% 26-Jul-22
A1056 d. Stair Case 2 2 0% 18-Aug-22
A1055 c. In 150mm concrete Slab 5 5 0% 26-Jul-22

Subtotal 47 47 27-Jun-22

GH-01.5.6.2 Formwork
A1059 b. In Intermediate Floor beams 1 1 0% 02-Jul-22
A1061 d. Stair Case 2 2 0% 26-Jul-22
A1058 a. In Elevation Columns 5 5 0% 21-Jun-22
A1060 c. In 150mm concrete Slab 5 5 0% 14-Jul-22

Subtotal 32 32 21-Jun-22

GH-01.5.6.3 Reinforcement Bar


A1066 d) Ø 14mm deformed bars 1 1 0% 01-Aug-22
A1068 f) Ø 20mm deformed bars 1 1 0% 08-Jul-22
A1064 b) Ø 10mm deformed bars 2 2 0% 15-Jun-22
A1063 a) Ø 8mm deformed bars 5 5 0% 20-Jul-22
A1065 c) Ø 12mm deformed bars 5 5 0% 15-Jun-22
A1067 e) Ø 16mm deformed bars 5 5 0% 01-Aug-22

Subtotal 45 45 15-Jun-22

Subtotal 57 57 15-Jun-22

GH-01.5.4 Water Proof work


A1073 Construct a shield wall for the applied 1 1 0% 10-May-22
basement shear wall membrane out
of 10cm thick HCB block at the back
of the memb
A1072 Supply and apply APP modified 2 2 0% 01-Aug-22
4mm thick bituminous membrane
system with granular / slated finish to
the roof concrete co
A1071 Prepare the basement external RC 5 5 0% 04-May-22
wall for water proofing membrane
application by rectifying the rugged
face of the wall

Page 3 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

Finish Primary Resource

04-Jun-22 DL.Daily Laborer

19-Mar-22 DL.Daily Laborer


18-Apr-22 DL.Daily Laborer
25-Mar-22 DL.Daily Laborer
10-Jun-22 DL.Daily Laborer
31-Mar-22 DL.Daily Laborer

10-Jun-22

20-Jun-22

10-May-22 DL.Daily Laborer

17-May-22 DL.Daily Laborer

17-May-22

20-Jun-22

28-Jun-22 C.Carpenter
27-Jul-22 C.Carpenter
19-Aug-22 C.Carpenter
30-Jul-22 C.Carpenter

19-Aug-22

02-Jul-22 C.Carpenter
27-Jul-22 C.Carpenter
25-Jun-22 C.Carpenter
19-Jul-22 C.Carpenter

27-Jul-22

01-Aug-22 DL.Daily Laborer


08-Jul-22 DL.Daily Laborer
16-Jun-22 DL.Daily Laborer
25-Jul-22 DL.Daily Laborer
20-Jun-22 DL.Daily Laborer
05-Aug-22 DL.Daily Laborer

05-Aug-22

19-Aug-22

10-May-22 Pr.Proofer

02-Aug-22 DL.Daily Laborer

09-May-22 DL.Daily Laborer

Page 4 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

AD-01 Activity Status Report

WBS
Activity ID Activity Name Original Remaining Activity % Start
Duration Duration Complete

Subtotal 78 78 04-May-22

GH-01.5.7 Block Work


A1082 200 mm thick class B HCB wall 8 8 0% 06-Aug-22
bedded in cement sand mortar
mix(1:3)
A1083 150 mm thick class B HCB wall 10 10 0% 12-Aug-22
bedded in cement sand mortar
mix(1:3)

Subtotal 15 15 06-Aug-22

GH-01.5.8 Carpentery & Joinery


GH-01.5.8.1 Wooden doors of 40mm thick both sides covered with 4mm thick kerero plyeood
A1087 a) D1 size [900x2100] mm 1 1 0% 22-Mar-23
A1088 b) D2 size [950x2100] mm 1 1 0% 28-Mar-23
A1089 c) D3 size [1200x2100] mm 1 1 0% 03-Apr-23

Subtotal 11 11 22-Mar-23

GH-01.5.8.2 Ditto as [NG-01.5.8.1]


A1091 a) D4 size [900x2100] mm 1 1 0% 08-Apr-23
A1092 b) D5 size [950x2100] mm 1 1 0% 14-Apr-23

Subtotal 6 6 08-Apr-23

Subtotal 21 21 22-Mar-23

GH-01.5.9 Aluminum Work


A1097 1) W1 Size [2500x1800] 1 1 0% 19-Nov-22
A1098 2) W2 Size [3600x3200] 1 1 0% 25-Nov-22
A1099 3) W3 Size [2600x4500] 1 1 0% 01-Dec-22
A1100 4) W4 Size [700x100] 1 1 0% 07-Dec-22
A1101 5) DW1 Size [900x2100] 1 1 0% 13-Dec-22
A1102 6) DW2 Size [1200x2100] 1 1 0% 19-Dec-22
A1103 Supply and fix Stair case hand rail 1 1 0% 11-Jan-23
made of aluminum profiles
consisting of baluster and hand rail
as per shown in detai

Subtotal 46 46 19-Nov-22

GH-01.5.10 Finishing
A1121 100x8mm perque skirting 2 2 0% 21-Oct-22
A1123 100x20mm thick ceramic skirting 2 2 0% 02-Nov-22
A1125 333x30mm window sill 2 2 0% 14-Nov-22
A1113 PVC flooring 4 4 0% 28-Sep-22
A1114 15x15x6mm thick ceramic floor tile 5 5 0% 04-Oct-22
for toilet area
A1115 400x400x8mm non slippery colored 5 5 0% 10-Oct-22
ceramic floor tile
A1116 400x400x8mm thick perque tile 5 5 0% 15-Oct-22
A1122 100x20mm thick marble skirting 5 5 0% 27-Oct-22
A1124 5mm cement screed 5 5 0% 08-Nov-22
GH-01.5.10.2 Plastering
A1111 Ditto as item 5.4 but for concrete stair 4 4 0% 16-Sep-22
case
A1106 two coats of External HCB wall 5 5 0% 18-Aug-22
surface
A1108 Three coats of cement plaster to 5 5 0% 30-Aug-22
internal wall suraface
A1109 two coats of plaster to internal column 5 5 0% 05-Sep-22
and beams
A1110 Ditto as item 5.4 but for bottom side of 5 5 0% 10-Sep-22
slab
A1112 Ditto as item 5.4 but for retaining wall 5 5 0% 22-Sep-22

A1107 Ditto as item 5.1 but for external 6 6 0% 24-Aug-22


column and beams

Subtotal 35 35 18-Aug-22

GH-01.5.10.1 Wolega Marble Tile

Page 5 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

Finish Primary Resource

02-Aug-22

15-Aug-22 DL.Daily Laborer

23-Aug-22 DL.Daily Laborer

23-Aug-22

22-Mar-23 C.Carpenter
28-Mar-23 C.Carpenter
03-Apr-23 C.Carpenter

03-Apr-23

08-Apr-23 C.Carpenter
14-Apr-23 C.Carpenter

14-Apr-23

14-Apr-23

19-Nov-22 Af.Alumunium Fixer


25-Nov-22 Af.Alumunium Fixer
01-Dec-22 Af.Alumunium Fixer
07-Dec-22 Af.Alumunium Fixer
13-Dec-22 Af.Alumunium Fixer
19-Dec-22 Af.Alumunium Fixer
11-Jan-23 DL.Daily Laborer

11-Jan-23

22-Oct-22 DL.Daily Laborer


03-Nov-22 DL.Daily Laborer
15-Nov-22 T.Tiler
01-Oct-22 DL.Daily Laborer
08-Oct-22 DL.Daily Laborer

14-Oct-22 DL.Daily Laborer

20-Oct-22 DL.Daily Laborer


01-Nov-22 DL.Daily Laborer
12-Nov-22 DL.Daily Laborer

20-Sep-22 DL.Daily Laborer

23-Aug-22 DL.Daily Laborer

03-Sep-22 DL.Daily Laborer

09-Sep-22 DL.Daily Laborer

15-Sep-22 DL.Daily Laborer

27-Sep-22 DL.Daily Laborer

30-Aug-22 DL.Daily Laborer

27-Sep-22

Page 6 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

AD-01 Activity Status Report

WBS
Activity ID Activity Name Original Remaining Activity % Start
Duration Duration Complete

A1118 a) 300x300 for landing 2 2 0% 24-Dec-22


A1119 b) 300x30mm thick tread 2 2 0% 30-Dec-22
A1120 c) 160x20mm thick riser 2 2 0% 05-Jan-23

Subtotal 12 12 24-Dec-22

Subtotal 122 122 18-Aug-22

GH-01.5.3 Glazing
A1076 Supply and fix approved type 4mm 5 5 0% 20-Apr-23
thick clear glass as per the
architectural drawing for the ground
floor. Price shall in

Subtotal 5 5 20-Apr-23

GH-01.5.11 Painting
A1130 Ditto but column and beam surface 2 2 0% 28-Jan-23

A1132 Ditto but concrete stair 2 2 0% 09-Feb-23


A1128 Apply three coats of Quartz paint to 4 4 0% 17-Jan-23
external plastered wall surfaces.

A1131 Ditto but bottom slab 4 4 0% 03-Feb-23


A1129 Apply three coats of plastic emulsion 5 5 0% 23-Jan-23
paint to internal plastered wall
surfaces.
A1133 Ditto but concrete retaining wall 5 5 0% 15-Feb-23
GH-01.5.11.1 Gypsum
A1138 Ditto but stair case 2 2 0% 10-Mar-23
A1136 gypsum to all internal wall surface, 3 3 0% 27-Feb-23
column, beam suface
A1135 gypsum to all internal wall surface 4 4 0% 21-Feb-23

A1137 Ditto but to bottom slab 5 5 0% 04-Mar-23

Subtotal 17 17 21-Feb-23

GH-01.5.11.2 Gypsum Decoration


A1150 End Of Project 0 0 0%
A1140 Living and dining room 5 5 0% 16-Mar-23

Subtotal 35 35 16-Mar-23

Subtotal 85 85 17-Jan-23

Subtotal 306 306 04-May-22

Subtotal 376 376 11-Feb-22

Subtotal 376 376 11-Feb-22

Subtotal 376 376 11-Feb-22

Total 376 376 11-Feb-22

Page 7 of 8
Guest House Project G+1 Project Start 11-Feb-22
Report Date 14-Feb-22 03:20 Project Finish 25-Apr-23

Finish Primary Resource

26-Dec-22 T.Tiler
31-Dec-22 T.Tiler
06-Jan-23 T.Tiler

06-Jan-23

06-Jan-23

25-Apr-23 G.Glazer

25-Apr-23

30-Jan-23 DL.Daily Laborer

10-Feb-23 DL.Daily Laborer


20-Jan-23 DL.Daily Laborer

07-Feb-23 DL.Daily Laborer


27-Jan-23 DL.Daily Laborer

20-Feb-23 DL.Daily Laborer

11-Mar-23 DL.Daily Laborer


01-Mar-23 DL.Daily Laborer

24-Feb-23 DL.Daily Laborer

09-Mar-23 DL.Daily Laborer

11-Mar-23

25-Apr-23
21-Mar-23 DL.Daily Laborer

25-Apr-23

25-Apr-23

25-Apr-23

25-Apr-23

25-Apr-23

25-Apr-23

25-Apr-23

Page 8 of 8

You might also like