PALM VILLA

Renovation of Nannies Bathroom

BILL OF QUANTITIES

Item Description Quantity Unit Rate (AED) 4000


4000Amount (AED)
A Demolition of existing ceramic floor, wall and ceiling
finishes including carting away and disposal of
debris 1 LS 1000 1000
-

B Removal of washbasin and mirrors, wrap and return


to Client in good condition 1 LS -

C Supply and application of floor screed 5.5 m2 -

D Supply and installation of mosaic floor tiles Including


surface preparations, adhesive, grout and metal trim
as per drawings 5.5 m2 -

E Supply and installation of ceramic wall tiles tas per


drawings including surface preparations, fixings,
adhesive, grout and sealants. 31 m2 -

F Supply and installation of 20mm thick corian vanity


counter as shown in the drawings including MDF
sub-base, metal support frames, fasteners and wood
veneer fascia LS DELETED

G Supply and installation of 6mm thick silver mirror as


shown in the Drawings including insulated backing
and fixing accessories LS DELETED

H Supply and installation of 10mm thick tempered 2200 2200


Clear glass shower enclosure as shown I drawings
including s/s top frame, sealants, ironmongeries and
fixing accessories 1 LS -

J Supply and installation of 20 mm thick marble


threshold to WC and shower area including bedding,
pointing and grouting up joints, polishing and sealing 1 LS -

K Supply and installation of Corian skirting to


washroom including adhesive, grouting up joints,
polishing and sealing 5 m -

L Supply and application of water-based low VOC


paint to bedroom wall. Color: 8284 Olive 30 m2 DELETED

SUB -TOTAL (AED) -

Rev 02 Page /1