You are on page 1of 12

Topic Main Sub Sub-Sub

General 1

1.1

Ground Floor 2
2.1

2.2

2.3
2.4 2.4.1
2.4.2

2.5

2.6

2.7

2.8
2.9
2.1
2.11

2.12

2.13

2.14

2.15

2.16
2.17

2.18

2.19

2.20

2.21

2.22
2.23

2.24

2.25

2.26
2.27
2.28

First Floor 3
3.1

3.2

3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.1

3.11

3.12

External Building 4

4.1

4.2

4.3

4.4

4.5

4.6

Mechanical and Electrical 5


Rectangular LED Troffer Light c/w wiring: 5.1 5.1.1
5.1.2
5.1.3
5.1.4
5.1.5
5.1.6
5.1.7
5.1.8
5.1.9
5.1.10
5.1.11
5.1.12
5.1.13
5.1.14
5.1.15
5.1.16
5.1.17
5.1.18
5.1.19

Split Unit Ceiling Cassette Air Conditioner c/w wiring: 5.2


5.2.1
5.2.2
5.2.3
5.2.4
5.2.5
5.2.6
5.2.7
5.2.8
5.2.9
5.2.10
5.2.11
5.2.12
5.2.13
5.2.14
5.2.15
5.2.16

Emergency lights c/w wiring: 5.3


5.3.1
5.3.2
5.3.3

5.4
Ventilation fan for Bathrooms. 5.5
5.5.1
5.5.2
5.6

5.7

5.8
Plumbing 6

6.1

6.2

6.3

6.4

6.5

6.6

6.7

6.8

6.9

6.10

OTHERS 7
7.1
Items Qty Cost Total Cost

All expenses incurred in complying with conditions of Contract,


specification, insurance, mobilization, safety measure including
1 35,000.00 35,000.00
PPE, setting out, works facilities, works progress photos, site
clearing and disposal of rubbish & solid waste.

Gypsum board partition / wall for Operation Workshop,


1 13,000.00 13,000.00
Maintenance Store, Power Room, Server Room.
Glass partition / wall for Lab Store, Document Room, Operation
Office and Meeting Room. 1 18,000.00 18,000.00

Replace existing main door with double glass door. 1 5,500.00 5,500.00
Remove two (2) units of roller shutter on front 2 800.00 1,600.00
Brick wall to be built in the area. 2 2,500.00 5,000.00
Renovate space of single door in Maintenance Store in old roller
1 1,500.00 1,500.00
area.
Two (2) new roller shutters in Operation and Maintenance
2 6,000.00 12,000.00
Workshop.
Rearrange sewage pipe and cable tray for installation of roller
shutter. 2 2,000.00 4,000.00

Single wooden flush door with side vision glass for rooms. 5 600.00 3,000.00
Single glass door for rooms. 4 1,400.00 5,600.00
Single wooden flush door for Maintenance Store. 1 800.00 800.00
New staircase as per Appendix 1. 1 25,000.00 25,000.00
Remove emergency exit (double wooden flush door) on right side
1 1,500.00 1,500.00
of building and build brick wall.
Add shower room and renovate toilet as per Appendix 1 (Demolish
1 32,000.00 32,000.00
existing wall and build extended new wall).
Remove toilet doors from outside of building on rear side of
1 1,500.00 1,500.00
building and build brick wall.

Single waterproof door for toilet (entry from inside building). 1 1,300.00 1,300.00

Toilet and shower room doors. 8 1,200.00 9,600.00


Demolish existing server room. 1 800.00 800.00

Demolish the wall on current emergency stair (on rear side of


1 2,500.00 2,500.00
building and make access from GF and corridor to the stair.

Modify the space of single door at rear side of building to be double


1 3,500.00 3,500.00
door.
Double wooden flush door for rear exit. 1 3,000.00 3,000.00

Automatic hydraulic door closer mount on all wooden doors. 8 220.00 1,760.00

Floor spring hydraulic door closer mount glass doors. 6 500.00 3,000.00
New ceiling for whole ground floor. 1 25,000.00 25,000.00
2’ x 2’ tiles for rooms and corridor c/w with floor preparation. (Tiles 1 17,500.00 17,500.00
value <RM20)
Epoxy coated floor for Operation Workshop and Maintenance 1 30,299.00 30,299.00
Store.
Tiles for bathroom. 1 20,000.00 20,000.00
Windows location adjustment / installation c/w steel grill. 1 1,000.00 1,000.00
Painting of entire internal part of building. 1 6,000.00 6,000.00

Demolish the existing concreate cabinets. 1 5,000.00 5,000.00


2’ x 2’ tiles in the cabinet area that demolished. (Tiles value
=<RM20) 1 5,000.00 5,000.00

Glass partition for all rooms. 1 14,000.00 14,000.00


Glass door for all rooms. 5 1,400.00 7,000.00
Shower room as per Appendix 2 with access to toilet. 1 18,000.00 18,000.00
Single waterproof door for toilet (main door). 1 1,500.00 1,500.00
Toilet and changing room door. 4 1,500.00 6,000.00
Automatic hydraulic mount on bathroom door. 1 300.00 300.00
Floor spring hydraulic door closer mount glass doors. 5 500.00 2,500.00
Remove on left side of building and build brick wall. 1 5,000.00 5,000.00
Wall of emergency staircase to be raised until ceiling level with
1 4,000.00 4,000.00
gypsum drywall
Painting of entire internal part of building. 1 6,000.00 6,000.00

Remove the old steel emergency staircase on left side of the


1 4,000.00 4,000.00
building
Remove ramp of the roller shutter that removed on front side of
2 700.00 1,400.00
the building
Install new ramp for the new roller shutter of the Operation
2 3,000.00 6,000.00
Workshop and Maintenance Store
Replace ceiling on outside. 1 5,000.00 5,000.00
Roof to be inspected for leaking c/w report and refurbishment if
1 1,500.00 1,500.00
needed.
Painting of entire external part of building 1 13,500.00 13,500.00

Operation Workshop 16 300.00 4,800.00


Workshop Store 16 320.00 5,120.00
Server Room 4 300.00 1,200.00
Power Room 4 320.00 1,280.00
Lab Store 12 350.00 4,200.00
Doc Room 12 350.00 4,200.00
Operation Office 12 350.00 4,200.00
Meeting Room 8 350.00 2,800.00
Ground Floor corridor 12 350.00 4,200.00
Stairs. 8 400.00 3,200.00
Bathroom Ground Floor. 12 350.00 4,200.00
Instrumental Analysis Room. 12 500.00 6,000.00
Testing Room 1. 16 500.00 8,000.00
Testing Room 2. 12 500.00 6,000.00
Retention Sample Room. 12 500.00 6,000.00
Lab Office. 12 500.00 6,000.00
Pantry. 12 500.00 6,000.00
First Floor Corridor. 8 500.00 4,000.00
Bathroom First Floor. 8 500.00 4,000.00

-
Operation Workshop – 5HP 1 5,150.00 5,150.00
Workshop Store – 5HP 1 5,150.00 5,150.00
Server Room -1HP 1 1,880.00 1,880.00
Power Room – 1HP 1 1,880.00 1,880.00
Lab Store – 3HP 1 3,750.00 3,750.00
Doc Room – 3HP 1 3,750.00 3,750.00
Operation Office – 3HP 1 3,750.00 3,750.00
Meeting Room – 2.5HP 1 3,280.00 3,280.00
Ground Floor corridor – 2HP 2 3,080.00 6,160.00
Instrumental Analysis Room - 4HP 1 4,860.00 4,860.00
Testing Room 1 – 4HP 1 4,860.00 4,860.00
Testing Room 2 – 3HP 1 3,750.00 3,750.00
Retention Sample Room – 4HP 1 4,860.00 4,860.00
Lab Office – 4HP 1 4,860.00 4,860.00
Pantry – 4HP 1 4,860.00 4,860.00
First Floor Corridor – 2HP 2 3,080.00 6,160.00

-
Each Rooms 16 300.00 4,800.00
Corridor & Pantry 7 300.00 2,100.00
Stairs 4 300.00 1,200.00

Emergency exit light signage on every exit. 4 300.00 1,200.00

Ground Floor 2 500.00 1,000.00


First Floor 2 500.00 1,000.00
Dismantle all existing old lights in Ground Floor. 1 1,000.00 1,000.00

Dismantle all existing old lights and air conditioners in First Floor. 1 3,000.00 3,000.00

To install 2 plug points in each room, corridor, pantry and stair. 44 150.00 6,600.00
New piping c/w valves to be installed on Ground Floor shower
1 4,000.00 4,000.00
room connected from main water supply to building,

New piping c/w valves to Operation Workshop (on outside)


1 2,500.00 2,500.00
connected from main water supply to building.
New piping c/w valves to Maintenance Store (on outside) 1 2,500.00 2,500.00
connected from main water supply to building.
Emergency shower and eye wash c/w gutter to drain outside
1 6,000.00 6,000.00
Operation Workshop (comply with DOSH standard).
New piping c/w valves for new sinks in bathroom of Ground Floor
and First Floor from main water supply to building. 1 4,000.00 4,000.00

New piping c/w valves for pantry from main water supply to
1 1,500.00 1,500.00
building.

New piping for:


i. Instrumental Analysis Room
ii. Testing Room 1
1 4,500.00 4,500.00
iii. Testing Room 2
iv. Retention sample
v. Pantry

All waste water piping to be installed (shower room, Operation &


Maintenance Workshop) based on requirement (drain 1 8,000.00 8,000.00
or sewage line).

Complete bathroom fixtures and fittings including wash basin and


mop sink for both bathrooms:
i. Wash Basin – 4 units 1 4,000.00 4,000.00
ii. Mop Sink – 2 units
Wash basin for Pantry. 1 2,500.00 2,500.00

Ground & First Floor (Outgoing Supply) DB Repair, Setting Up and C 2 6,500.00 13,000.00

624,719.00
Percentage Per Unit Rate Rate

130% 45,500.00 45,500.00

45,500.00

170% 22,100.00 22,100.00

150% 27,000.00 27,000.00

140% 7,700.00 7,700.00


140% 1,120.00 2,240.00
140% 3,500.00 7,000.00

140% 2,100.00 2,100.00

140% 8,400.00 16,800.00

140% 2,800.00 5,600.00

140% 840.00 4,200.00


140% 1,960.00 7,840.00
140% 1,120.00 1,120.00
130% 32,500.00 32,500.00

140% 2,100.00 2,100.00

150% 48,000.00 48,000.00

140% 2,100.00 2,100.00

140% 1,820.00 1,820.00

140% 1,680.00 13,440.00


140% 1,120.00 1,120.00

140% 3,500.00 3,500.00


7
140% 4,900.00 4,900.00

140% 4,200.00 4,200.00

140% 308.00 2,464.00

140% 700.00 4,200.00


135% 33,750.00 33,750.00

170% 29,750.00 29,750.00

140% 42,418.60 42,419.00

140% 28,000.00 28,000.00


140% 1,400.00 1,400.00
140% 8,400.00 8,400.00
367,763.00

140% 7,000.00 7,000.00

140% 7,000.00 7,000.00

140% 19,600.00 19,600.00


150% 2,100.00 10,500.00
130% 23,400.00 23,400.00
140% 2,100.00 2,100.00
140% 2,100.00 8,400.00
140% 420.00 420.00
140% 700.00 3,500.00
140% 7,000.00 7,000.00

140% 5,600.00 5,600.00

140% 8,400.00 8,400.00


102,920.00

140% 5,600.00 5,600.00

140% 980.00 1,960.00

140% 4,200.00 8,400.00

140% 7,000.00 7,000.00

140% 2,100.00 2,100.00

140% 18,900.00 18,900.00


43,960.00

140% 420.00 6,720.00


140% 448.00 7,168.00
140% 420.00 1,680.00
140% 448.00 1,792.00
140% 490.00 5,880.00
140% 490.00 5,880.00
140% 490.00 5,880.00
140% 490.00 3,920.00
140% 490.00 5,880.00
140% 560.00 4,480.00
140% 490.00 5,880.00
140% 700.00 8,400.00
140% 700.00 11,200.00
140% 700.00 8,400.00
140% 700.00 8,400.00
140% 700.00 8,400.00
140% 700.00 8,400.00
140% 700.00 5,600.00
140% 700.00 5,600.00

140% 7,210.00 7,210.00


140% 7,210.00 7,210.00
140% 2,632.00 2,632.00
140% 2,632.00 2,632.00
140% 5,250.00 5,250.00
140% 5,250.00 5,250.00
140% 5,250.00 5,250.00
140% 4,592.00 4,592.00
140% 4,312.00 8,624.00
140% 6,804.00 6,804.00
140% 6,804.00 6,804.00
140% 5,250.00 5,250.00
140% 6,804.00 6,804.00
140% 6,804.00 6,804.00
140% 6,804.00 6,804.00
140% 4,312.00 8,624.00
-
-
140% 420.00 6,720.00
140% 420.00 2,940.00
140% 420.00 1,680.00
-
140% 420.00 1,680.00
-
140% 700.00 1,400.00
140% 700.00 1,400.00
140% 1,400.00 1,400.00

140% 4,200.00 4,200.00

140% 210.00 9,240.00


- 246,764.00
-

140% 5,600.00 5,600.00

140% 3,500.00 3,500.00

140% 3,500.00 3,500.00

150% 9,000.00 9,000.00

140% 5,600.00 5,600.00

140% 2,100.00 2,100.00

140% 6,300.00 6,300.00

140% 11,200.00 11,200.00

140% 5,600.00 5,600.00

140% 3,500.00 3,500.00


- 55,900.00
-
140% 9,100.00 18,200.00
-
-
-

862,807.00 862,807.00