General 1
1.1
Ground Floor 2
2.1
2.2
2.3
2.4 2.4.1
2.4.2
2.5
2.6
2.7
2.8
2.9
2.1
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
First Floor 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.1
3.11
3.12
External Building 4
4.1
4.2
4.3
4.4
4.5
4.6
5.4
Ventilation fan for Bathrooms. 5.5
5.5.1
5.5.2
5.6
5.7
5.8
Plumbing 6
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
OTHERS 7
7.1
Items Qty Cost Total Cost
Replace existing main door with double glass door. 1 5,500.00 5,500.00
Remove two (2) units of roller shutter on front 2 800.00 1,600.00
Brick wall to be built in the area. 2 2,500.00 5,000.00
Renovate space of single door in Maintenance Store in old roller
1 1,500.00 1,500.00
area.
Two (2) new roller shutters in Operation and Maintenance
2 6,000.00 12,000.00
Workshop.
Rearrange sewage pipe and cable tray for installation of roller
shutter. 2 2,000.00 4,000.00
Single wooden flush door with side vision glass for rooms. 5 600.00 3,000.00
Single glass door for rooms. 4 1,400.00 5,600.00
Single wooden flush door for Maintenance Store. 1 800.00 800.00
New staircase as per Appendix 1. 1 25,000.00 25,000.00
Remove emergency exit (double wooden flush door) on right side
1 1,500.00 1,500.00
of building and build brick wall.
Add shower room and renovate toilet as per Appendix 1 (Demolish
1 32,000.00 32,000.00
existing wall and build extended new wall).
Remove toilet doors from outside of building on rear side of
1 1,500.00 1,500.00
building and build brick wall.
Single waterproof door for toilet (entry from inside building). 1 1,300.00 1,300.00
Automatic hydraulic door closer mount on all wooden doors. 8 220.00 1,760.00
Floor spring hydraulic door closer mount glass doors. 6 500.00 3,000.00
New ceiling for whole ground floor. 1 25,000.00 25,000.00
2’ x 2’ tiles for rooms and corridor c/w with floor preparation. (Tiles 1 17,500.00 17,500.00
value <RM20)
Epoxy coated floor for Operation Workshop and Maintenance 1 30,299.00 30,299.00
Store.
Tiles for bathroom. 1 20,000.00 20,000.00
Windows location adjustment / installation c/w steel grill. 1 1,000.00 1,000.00
Painting of entire internal part of building. 1 6,000.00 6,000.00
-
Operation Workshop – 5HP 1 5,150.00 5,150.00
Workshop Store – 5HP 1 5,150.00 5,150.00
Server Room -1HP 1 1,880.00 1,880.00
Power Room – 1HP 1 1,880.00 1,880.00
Lab Store – 3HP 1 3,750.00 3,750.00
Doc Room – 3HP 1 3,750.00 3,750.00
Operation Office – 3HP 1 3,750.00 3,750.00
Meeting Room – 2.5HP 1 3,280.00 3,280.00
Ground Floor corridor – 2HP 2 3,080.00 6,160.00
Instrumental Analysis Room - 4HP 1 4,860.00 4,860.00
Testing Room 1 – 4HP 1 4,860.00 4,860.00
Testing Room 2 – 3HP 1 3,750.00 3,750.00
Retention Sample Room – 4HP 1 4,860.00 4,860.00
Lab Office – 4HP 1 4,860.00 4,860.00
Pantry – 4HP 1 4,860.00 4,860.00
First Floor Corridor – 2HP 2 3,080.00 6,160.00
-
Each Rooms 16 300.00 4,800.00
Corridor & Pantry 7 300.00 2,100.00
Stairs 4 300.00 1,200.00
Dismantle all existing old lights and air conditioners in First Floor. 1 3,000.00 3,000.00
To install 2 plug points in each room, corridor, pantry and stair. 44 150.00 6,600.00
New piping c/w valves to be installed on Ground Floor shower
1 4,000.00 4,000.00
room connected from main water supply to building,
New piping c/w valves for pantry from main water supply to
1 1,500.00 1,500.00
building.
Ground & First Floor (Outgoing Supply) DB Repair, Setting Up and C 2 6,500.00 13,000.00
624,719.00
Percentage Per Unit Rate Rate
45,500.00
862,807.00 862,807.00