Professional Documents
Culture Documents
0
SUMMARY
SUMMARY
BILL 01 PRELIMINARIES -
BILL NO. 0
B General Requirements
B.1 Bonds, Guarantees and Securities 1 LS -
B.2 Insurances (CAR, TPL, BPJS) 1 LS -
B.3 Site Management and Establishment Costs 1 LS -
B.4 Contractor's equipment 1 LS -
B.5 Contractor's Labour 1 LS -
B.6 Contractor's Employees 1 LS -
B.7 Workmen Living 1 LS -
B.8 Visitors 1 LS -
B.9 Identification Badges 1 LS -
B.10 Safeguarding the Works 1 LS -
Maintenance and Protection of Existing Roads, Bridges Footpaths,
B.11 1 LS -
Fences, Rivers and Irrigation Channels
B.12 Protection of Public and Private Services 1 LS -
B.13 Contractor's Responsibilities Towards Neighbours 1 LS -
B.14 Noise Control on the Site 1 LS -
B.15 Removal of Rubbish 1 LS -
B.16 Temporary Diversion of Traffic 1 LS -
B.17 Project Signage 1 LS -
B.18 Certification and guarantees 1 LS -
C.19 Rapid Test for Worker (as Per local regulation) 1 LS
C Temporary Works
C.1 Contractor's Storages 1 LS -
C.2 Contractor's Site Office 1 LS -
C.3 Site Accomodation for Security Staff 1 LS -
C.4 Telephone and Internet Connections (for contractor own use) 1 LS -
C.5 Water 1 LS -
C.6 Lighting and Power 1 LS -
C.7 Fire Protection 1 LS -
C.8 Temporary Lightning Protection 1 LS -
C.9 Cleaning Up 1 LS -
1.1 PRELIMINARIES
CARRIED OUT TO COLLECTION BILL NO. 01 Rp. -
The main contractor shall allow for forming all chases, recesses, holes and
penetration through concrete work brickwork/blockwork for the works of
the Direct Contractor
The main contractor shall allow for building or casting in all pipes, pipe
sleeves, anchors, brackets and the like sundry items supplied by the Direct
Contractors into concrete, reinforced and masonry
Core drilling for pipe/sleeve penetrations to "wet" areas (areas with liquid
applied or itegral waterproofing) including sealing between pipe and
concrete slab with non shrink grout with epoxy caulking
Conctractor should be responsible for all manhole, at ceiling all wall for
MEP works
Rp. -
Collection
1.1 PRELIMINARIES
CARRIED TO SUMMARY AT END OF BILL NO. 01 Rp. -
SUMMARY
02.2 EARTHWORK -
02.3 CONCRETE -
02.4 MASONRY -
02.5 METALS -
02.9. FINISHES -
BILL NO. 02
CARRIED TO SUMMARY -
02.2.1 EARTHWORK
B To External area m2
C To Concrete road m2
E To Control Box m2
F To Drainage
H To Absorption pit m2
I To Retention pit m2
J To Concrete road m2
K To Paving Block LD m2
L To Paving Block HD m2
M To ME Cable Duct m2
N To Concrete road m2
O To Paving Block LD m2
P To Paving Block HD m2
Q To Absorption pit m2
To Collection Rp. -
A To Retention pit m2
C To Absorption pit m2
D To Drainage m2
E To Control Box m2
02.2.4 OTHERS
F To Concrete road m2
G To Retention pit m2
To Collection Rp. -
COLLECTIONS
Page 02.2 /1 -
Page 02.2 /2 -
02.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 02 Rp. -
A To Road m2 -
B To Control Box m2 -
C To Absorption pit m2 -
02.3.2 CONCRETE
In-Situ Concrete
E To Road m3 -
F To Control Box m3 -
G To Absorption pit m3 -
I To Road m2 -
J To Control Box m2 -
K To Absorption pit m2 -
L To Foundation m2 -
To Collection Rp. -
02.3.3 REINFORCEMENT
B To Road kg -
C To Control Box kg -
D To Absorption pit kg -
E To Absorption pit kg -
F To Absorption pit kg -
G To Foundation kg -
02.3.4 DRAINAGE
Supply and install drain concrete precast U Channel complete with light
duty concrete cover as specified
H UC200 - m
I UC300 - m
J UC300x200 - m
K UC400 - m
L UC500 - m
M UC600 - m
N UC800 - m
Supply and install drain concrete precast U Channel complete with heavy
duty concrete cover as specified
O UG300 - m
P UG400 - m
Q UG500 - m
R UG600 - m
To Collection Rp. -
A OD200 m
B OD300 m
C OD300x200 m
D OD400 m
E OD500 m
F OD800 m
G RCP 800 m
02.3.5 SUNDRIES
K Supply and Install Concrete curb including drain hole, accessories, and m
support as drawing and specification
M Supply and Install Man ladder D16-200 c/c complete with baseplate, nos
anchor, and all accessories and support as drawing and specification
To Collection Rp. -
COLLECTIONS
Page 02.3 /1 -
Page 02.3 /2 -
Page 02.3 /3 -
02.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 02 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick m2
B To Wall m2
02.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
02.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 02 Rp. -
A Supply and intsall Steel grating cover complete with steel frame, steel m2
support and accessories as drawing and specification
02.5.2 GATES
Supply and install gate complete with accessories and support as drawing
and specification
B Gates nos
02.5 METALS
A To Parking area m2
02.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 02 Rp. -
PIPEWORKS
FITTINGS
N Pressure gauge 16 K with 4" dial stainless steel with water syphon and no
manometer holder,valve;threaded end connection
To Collection Rp. -
PIPEWORKS
FITTINGS
PIPEWORKS
FITTINGS
To Collection Rp. -
PIPEWORKS
FITTINGS
M Outdoor hydrant box with size 1350 x 660 x 200mm complete with hose rack, no
nozzle and rubber hose reel
COLLECTION
Page 02.11 /1 -
Page 02.11 /2 -
Page 02.11 /3 -
A Single street lighting LED 140W, 220V, min 14000lm, IP66, c/w 9000mm Pole no
single arm and fondation
B Single street lighting LED 140W, 220V, min 14000lm, IP66, c/w 2500mm Pole no
mounted pipe bridge
C Flood light LED 310W, 220V, min 40000lm, IP66 c/w 7000mm pole and no
foundation (without arm)
Supply and Install lighting cables from sub circuit to final circuit including
grounding system and all neccessary accessories accordance with the technical
specification and drawings, as described :-
D Cabling point from local panel (NYFGbY 3x2.5mm² underground direct burried no
at 300mm below grade (minimum) to lighting
Supply and Install Lightning protection system for panel and equipment
complete with support and all neccessary accessories in accordance with the
technical specification and drawings, as described :-
E Air terminal (ESE Type) c/w pole H=2 mtr, radius protection = 80mtr, installed no
on the top building
F Air terminal (ESE Type) c/w pole H=18 mtr, radius protection = 90mtr, installed no
on the level ground floor
G Junction box public address JBPA (include in every building system) no include
To Collection Rp. -
B IP based bullet camera outdoor type IP65/IK10, min 4 MP, VF, POE, mounted no
on pole
To Collection Rp. -
COLLECTION
Page 02.12 /1 -
Page 02.12 /2 -
SUMMARY
14.2 EARTHWORK -
14.3 CONCRETE -
BILL NO. 14
CARRIED TO SUMMARY -
14.2.2 EARTHWORK
B To Pile Cap m3
C To Slab m3
D To Tie Beam m3
E To Pile Cap m2
F To Slab m2
G To Tie Beam m2
H To Pile Cap m2
I To Slab m2
J To Tie Beam m2
K To Pile Cap m2
L To Slab m2
M To Tie Beam m2
14.2.5 OTHERS
Plastic sheet
N To Pile Cap m2
O To Slab m2
P To Tie Beam m2
14.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. -
14.3.1 FORMWORK
A To Pile Cap m2 -
B To Slab m2 -
C To Tie Beam m2 -
E To Wall m2 -
14.3.2 CONCRETE
In-Situ Concrete
F To Pile Cap m3 -
G To Slab m3 -
H To Tie Beam m3 -
J To Wall m3 -
Lean Concrete
K To Pile Cap m2 -
L To Slab m2 -
M To Tie Beam m2 -
To Collection Rp. -
14.3.3 REINFORCEMENT
14.3.4 SUNDRIES
I Waterstop joint, sika water including all necessary per drawings and m
specification
To Collection Rp. -
COLLECTION
Page 14.3 /1 -
Page 14.3 /2 -
14.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 14 Rp. -
SUMMARY
21.2 EARTHWORK -
21.3 CONCRETE -
21.4 MASONRY -
21.5 METALS -
21.9. FINISHES -
BILL NO. 21
CARRIED TO SUMMARY -
21.1 PILINGS
A Dia.350mm, L=12mm m
E Spun pile; dia. 400mm (Plate/joint included in piles, welding only) nos
Others
H Pile dynamic testing with PDA, including CAPWAP analysis and report by nos
independent contractor
I Pile integrity testing with PIT system including analysis and report for new nos
21.2.2 EARTHWORK
B To Pile Cap m3
D To Tie Beam m3
E To Pedestal m3
F To Pile Cap m2
H To Tie Beam m2
I To Pile Cap m2
K To Tie Beam m2
M To Ramp m2
N To Pile Cap m2
P To Tie Beam m2
Q To Pedestal m2
To Collection Rp. -
21.2.5 OTHERS
Plastic sheet
A To Pile Cap m2
C To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 21.2/1 -
Page 21.2/2 -
21.2 EARTHWORK
21.3.1 FORMWORK
A To Pile Cap m2 -
C To Tie Beam m2 -
D To Slab m2 -
E To Beam m2 -
21.3.2 CONCRETE
In-Situ Concrete
H To Pile Cap m3 -
Lean Concrete
M To Pile Cap m2 -
To Collection Rp. -
Lean Concrete
B To Tie Beam m2 -
21.3.3 REINFORCEMENT
21.3.4 SUNDRIES
O Flexible joint filler, folytirene 5mm thick per drawings and specification m
To Collection Rp. -
COLLECTIONS
Page 21.3 /1 -
Page 21.3 /2 -
21.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 21 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
21.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
21.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 21 Rp. -
A Supply and install cage ladder including landing step, connecting plates no -
and all fixing accessories and support as drawing and specification - to
21.5.2 RAILING
Supply and Install steel pipe railing including handrail support and knee
railing complete with kick plate, anchor bolt and all necessary fixing
accessories as drawings and specifications
B To external ramp m -
21.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 21 Rp. -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
C To Roof m2 -
21.7.2 SUNDRIES
21.8.1 DOORS
Supply and install steel door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
A 21.DF.003 no -
B 21.DF.002 no -
C 21.DF.004 no -
D 21.DF.005 no -
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
E 21.LA.001 no -
F 21.LA.002 no -
G Glassblock nos -
A To Floor m2 -
B To Coving m -
C To Floor m2 -
F To Ceiling m2 -
21.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 21 Rp. -
21.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 21 Rp. N/A
Supply and install Hydrant Pipes, Black steel pipe to ASTM A 53 schedule 40 ,
Grade B, including fitting (for 50 mm dia. Pipe or less) fixed in position complete
with supports, hangers, brackets, clamp, painting, and other necessary fixing and
jointing material in accordance to the technical specification and drawings, as
described;
A 21DB01 no
B 21DBAC01 no
E High bay LED 75W, 10503, 220V, surface mounted c/w nicad battery, rated 2 no
duration 1 hour
F Waterproof batten LED 20W, 220V, IP65, 2000lm, L600 c/w nicad battery, 4 no
rated duration 1 hour
H Batten LED 40W, 220V, 4100lm, mounted on the trunking c/w nicad battery, 5 no
rated duration 1 hour
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
I Cabling point from local panel (NYM 3C x 2.5 mm² run-in and with PVC high 47 no
impact conduit) to; lighting and switch
To Collection Rp. -
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
A General socket outlet c/w cover , wall mounted, 16A, 250V, (Waterproof) single 9 no
gang
Electrical
Electronic
Supply and Install Grounding system for panel and equipment complete with
support and all neccessary accessories accordance with the technical
specification and drawings, as described :-
E Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
FIRE ALARM
Supply and Install the following Fire Alarm Equipment complete with support, and
all necessary accessories in accordance to the technical specification and
drawings, as described : -
K JBFA-21-01 1 no
To Collection Rp. -
B Cable FRC 2Cx1,5 mm2; for horn & strobe light point 4 no
PUBLIC ADDRESS
Supply and Install the following Sound System Equipment complete with support,
and all necessary accessories in accordance to the technical specification and
drawings, as described : -
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
COLLECTIONS
Page 21.12/1 -
Page 21.12/2 -
Page 21.12/3 -
21.13.1 EQUIPMENT
AIR CONDITIONING
Supply and Install of Air Conditioning Units complete with hangers/supports,
vibration mountings, neoprene pads and all necessary accessories in accordance
to the technical specification and drawings, as described : -
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to the
technical specification and drawings, as described : -
DRAIN PIPES
L 25 mm diameter pipe PVC Class AW c/w insulation m
SUMMARY
31.2 EARTHWORK -
31.3 CONCRETE -
31.4 MASONRY -
31.5 METALS -
31.9. FINISHES -
BILL NO. 31
CARRIED TO SUMMARY -
31.1 DEMOLITION
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. N/A
31.2.2 EARTHWORK
B To Footings m3
D To Tank Foundation m3
E To Wall m3
F To Footings m2
H To Tank Foundation m2
J To Tie Beam m2
K To Footings m2
M To Tank Foundation m2
N To Tie Beam m2
O To Footings m2
Q To Tank Foundation m2
R To Wall m2
To Collection Rp. -
31.2.5 OTHERS
Plastic sheet
A To Footings m2
C To Tank Foundation m2
D To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 31.2 /1
Page 31.2 /2 -
31.2 EARTHWORK
31.3.1 FORMWORK
A To Footings m2 -
B To Slab on Ground m2 -
C To Slab m2 -
D To Tank Foundation m2 -
F To Column m2 -
H To Stair m2 -
31.3.2 CONCRETE
In-Situ Concrete
I To Footings m3 -
K To Tank Foundation m3 -
M To Column m3 -
O To Stair m3 -
To Collection Rp. -
Lean Concrete
A To Footings m2 -
B To Slab on Ground m2 -
C To Tank Foundation m2 -
D To Tie Beam m2 -
31.3.3 REINFORCEMENT
To Collection Rp. -
COLLECTIONS
Page 31.3 /1 -
Page 31.3 /2 -
31.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. -
31.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
31.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. -
31.5.1 RAILING
Supply and Install steel pipe railing including handrail support and knee
railing complete with kick plate, anchor bolt and all necessary fixing
accessories as drawings and specifications
A To stair m
31.5.2 SUNDRIES
Supply and install hot dipped galvanized steel angle complet with all
fixing accessories and support as drawing and specification
B L 50.50.5 m
Supply and install steel grating complete with metal angle support
grating including all fixing accessories and support as drawing and
C To Gutter m
31.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
C To Roof m2
31.8.1 DOORS
A 31.DR.001 nos
31.8.3 WINDOWS
B 31.WA.001 nos
C 31.WB.002 nos
D 31.WB.003 nos
A To Floor m2
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
B To Floor m2
C To Skirting m
D To Floor m2
J To Concrete Ceiling m2
K To Concrete Ceiling m2
31.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. -
31.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 31 Rp. N/A
A 31DB01 no
C Waterproof LED 40W, 220V, IP65 mounted on steel pipe 2.5m height Ø50mm no
D Flood light LED 100W, 9500lm, mounted on steel pipe 2.5m height Ø50mm no
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
G Cabling point from local panel (NYM 3C x 2.5 mm² run-in and with PVC high no
impact conduit) to; lighting and switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
I Industrial socket outlet, mounted on the front panel door, 16A, 250V, IP65 no
J Industrial socket outlet, mounted on the front panel door, 32A, 400V, IP65
To Collection Rp. -
Electrical
Supply and Install Grounding system for panel and equipment complete with
support and all neccessary accessories accordance with the technical
specification and drawings, as described :-
D Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
To Collection Rp. -
COLLECTIONS
Page 31.12 /1 -
Page 31.12 /2 -
SUMMARY
40.2 EARTHWORK -
40.3 CONCRETE -
40.4 MASONRY -
40.5 METALS -
40.9. FINISHES -
40.10 SPECIALITIES -
BILL NO. 40
CARRIED TO SUMMARY -
40.2.2 EARTHWORK
B To Pile Caps m3
D To Plinths/Tank Foundation m3
E To Pedestal m3
F To Pile Caps m2
H To Plinths/Tank Foundation m2
I To Tie Beam m2
J To Pile Caps m2
L To Plinths/Tank Foundation m2
M To Tie Beam m2
N To Pile Caps m2
P To Plinths/Tank Foundation m2
Q To Pedestal m2
To Collection Rp. -
40.2.5 OTHERS
Plastic sheet
A To Pile Caps m2
C To Plinths/Tank Foundation m2
D To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 40.2 /1
Page 40.2 /2 -
40.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
40.3.1 FORMWORK
A To Pile Caps m2 -
C To Gutter m2 -
D To Upper Slab m2 -
E To Tank Foundation m2 -
G To Pedestal m2 -
I To Stair m2 -
J To Gutter m2 -
Metal Deck BMT 0.7 thick including shear connector, support and all
necessary as drawing specified
K To Floor m2 -
40.3.2 CONCRETE
In-Situ Concrete
L To Pile Caps m3 -
M To Slab on Ground m3 -
N To Plinth/Tank Foundation m3 -
To Collection Rp. -
In-Situ Concrete
A To Pedestal m3 -
B To Wall/Parapet m3 -
C To Stair m3 -
D To Gutter m3 -
Lean Concrete
E To Pile Caps m2 -
F To Slab on Ground m2 -
G To Plinth/Tank Foundation m2 -
H To Tie Beam m2 -
40.3.3 REINFORCEMENT
To Collection Rp. -
40.3.3 REINFORCEMENT
To Collection Rp. -
COLLECTIONS
Page 40.3 /1 -
Page 40.3 /2 -
Page 40.3 /3 -
40.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
40..4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
Supply and Install Metal cladding 0.45 BMT finish colorbond fixed to
steel structure, including sealant, and all necessary fixing accessories; all in
accordance with drawings and specifications
E To Wall m2
Supply and install PIR Sandwich Panel including Coving and all necessary
fixing accessories and steel support; all in accordance with drawings and
specifications
Supply and install Rockwool 60kg/m3 complete with Glass Cloth and
Perporated Accoustic Gypsumboard including metal stud, and all necessary
fixing accessories and support; all in accordance with drawings and
specifications
G To Wall m2
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in accordance
with drawings and specifications
H To Ceiling m2 -
40.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
B SC6, WF250x250x9x14 kg -
C SC8, WF300x300x10x15 kg -
D SC10, WF350x350x12x19 kg -
E SC12, WF400x400x13x21 kg -
F SC21, UNP200x90 kg -
G PR3, C150x65x20x2.3 kg -
H PR4, C150x65x20x3.2 kg -
I PR5, C200x75x20x2.3 kg -
J PR8, Z20024 kg -
K PR9, Z15024 kg -
L R3, WF250x125x6x9-R kg -
M R4, WF300x150x6.5x9-R kg -
N R6, WF400x200x8x13-R kg -
O HB17, Dia16-HB kg -
P HB18, Dia19-HB kg -
Q SB2, WF200x100x5.5x8-SB kg -
R SB3, WF250x125x6x9-SB kg -
S SB4, WF300x150x6.5x9-SB kg -
T SB5, WF350x175x7x11-SB kg -
U SB6, WF400x200x8x13-SB kg -
V SB12, UNP150x75-SB kg -
W SB14, UNP200x90-SB kg -
X SG3, WF250x125x6x9-SG kg -
Y SG4, WF300x150x6.5x9-SG kg -
To Collection Rp. -
B SG6, WF400x200x8x13-SG kg -
C SG7, WF450x200x9x14-SG kg -
D TR2, Dia12-TR kg -
E VB2, L50x50x6-VB2 kg -
F All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
Supply and install cage ladder including landing step, connecting plates
and all fixing accessories and support as drawing and specification
40.5.3 RAILINGS
Supply and Install Stainless steel pipe railing including handrail support
and knee railing complete with kick plate, anchor bolt and all necessary
fixing accessories as drawings and specifications
40.5.4 OTHERS
L Supply and install galvanized steel grating 32mm thick including all m2 -
support and accessories per drawings and specifications
M Supply and install galvanized steel grating 30mm thick including all m2 -
support and accessories per drawings and specifications
To Collection Rp. -
Supply and install steel grating complete with metal angle support grating
including all fixing accessories and support as drawing and specification
A To Floor m2
B To Gutter m2
Supply and install steel bollard including baseplate and all fixing
accessories and support as drawing and specification
To Collection Rp. -
COLLECTIONS
Page 40.5 /1 -
Page 40.5 /2 -
Page 40.5 /3 -
40.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
Supply and Install metal roof Klip Lok 0.45 BMT fixed to steel purlin
including sealant, and all fixing accessories; all in accordance with
drawings and specifications
A To Roof m2
Supply and Install Waterstop Colorbond finish fixed to metal roof sheet,
including sealant and all necessary fixing accessories; all in accordance with
drawings and specifications
B To Roof m
Supply and Install Metal cladding Trimdek 0.45 BMT finish colorbond
fixed to steel structure, including sealant, over flow galvanized steel pipe
Ø2" 6000mm CTC, and all necessary fixing accessories; all in accordance
with drawings and specifications
C To Fascia m2
Supply and Install Metal Flashing 0.45 BMT precoated finish colorbond
fixed to steel purlin, including sealant and all necessary fixing accessories;
all in accordance with drawings and specifications
D To Fascia m
Supply and install PIR Sandwich Panel including Coving and all necessary
fixing accessories and steel support; all in accordance with drawings and
specifications
Supply and Install metal gutter 0.5mm with weatherproof sealant complete
with plate support, jointing and all necessary fixing accessories and support,
in accordance with manufacturer's recommendations, as drawings and
specifications
G To Roof Gutter m2
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
J To Roof m2
To Collection Rp. -
40.7.3 SUNDRIES
C Supply and Install Turbin Ventilator complete with all fixing accessories nos
and support as drawings and specifications
To Collection Rp. -
COLLECTIONS
Page 40.7 / 1
Page 40.7 / 2
40.8.1 DOORS
Supply and install High Speed Door including frames, hardwares, treshold,
steel plate, and all necessary accessories and fixing supports as drawings
and specifications
A 40.DA.002 nos
B 40.DA.004 nos
C 40.DA.006 nos
D 40.DA.010 nos
E 40.DA.012 nos
F 40.DB.001 nos
G 40.DD.007 nos
H 40.DE.014 nos
Supply and install steel door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
I 40.DF.016 nos
J 40.DF.018 nos
K 40.DG.017 nos
L 40.DH.028 nos
M 40.DL.009 nos
N 40.DL.013 nos
A 40.DL.030 nos
B 40.DL.037 nos
C 40.DL.038 nos
D 40.DL.039 nos
E 40.DN.003 nos
To Collection Rp. -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
A 40.DK.019 nos
B 40.DK.029 nos
C 40.DP.020 nos
D 40.DQ.023 nos
E 40.DQ.024 nos
F 40.DQ.025 nos
G 40.DQ.026 nos
H 40.DQ.027 nos
I 40.DR.005 nos
J 40.DR.011 nos
K 40.DR.021 nos
L 40.DR.022 nos
M 40.DR.031 nos
N 40.DR.034 nos
O 40.DR.035 nos
P 40.DR.036 nos
Supply and install alumnium glass door including vision panel / louvre,
frames, hardwares, treshold, steel plate, and all fixing accessories and
supports as drawings and specifications
Q 40.DU.032 nos
R 40.DU.033 nos
Supply and install steel fire rated door including vision panel / louvre,
frames, hardwares, treshold, steel plate, and all fixing accessories and
supports as drawings and specifications
S 40.DV.008 nos
T 40.DV.015 nos
To Collection Rp. -
40.8.2 WINDOWS
A 40.WA.005 nos
B 40.WB.001 nos
C 40.WB.002 nos
D 40.WB.003 nos
E 40.WB.004 nos
F 40.WB.006 nos
G 40.WB.007 nos
40.8.3 LOUVRES
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
H 40.LA.001 nos
I 40.LA.002 nos
J 40.LA.003 nos
K 40.LA.004 nos
L 40.LA.005 nos
M 40.LA.006 nos
N 40.LA.007 nos
O 40.LA.008 nos
P 40.LA.009 nos
Q 40.LA.010 nos
R 40.LA.011 nos
S 40.LA.012 nos
T 40.LA.013 nos
U 40.LA.014 nos
V 40.LA.015 nos
W 40.LA.016 nos
X 40.LA.017 nos
To Collection Rp. -
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
A 40.LA.018 nos
B 40.LA.019 nos
C 40.LA.020 nos
D 40.LA.021 nos
E 40.LA.022 nos
F 40.LA.023 nos
G 40.LA.024 nos
H 40.LA.025 nos
I 40.LA.026 nos
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
A 40.SR.001 nos
B 40.SR.002 nos
To Collection Rp. -
COLLECTIONS
Page 40.8 /1 -
Page 40.8 /2 -
Page 40.8 /3 -
Page 40.8 /4 -
A To Floor m2
B To Floor m2
C To Floor m2
D To Skirting H=150mm
E To Floor m2
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
F To Floor m2
G To Skirting H=100mm m
Supply and install Homogenous Tile Shock Resistant complete with screed,
gape grouting and all in accordance with manufactured instruction applied:
all in accordance with drawings and specifications
H To Floor m2
I To Skirting H=150mm m
Supply and install raised floor system complete with all fixing accessories
and support; all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
J To Floor m2
K To Floor m2
L PU Paint, h=100mm m
N Hardening, h=100mm m
To Collection Rp. -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
Prepare and apply anti acid/alkali tile with epoxy joint; all in accordance
with manufacturer's instruction, drawings, and specifications
F To Calciboard Ceiling m2
G To Exposed Concrete m2
H To Exposed Concrete m2
To Collection Rp. -
COLLECTIONS
Page 40.9 /1
Page 40.9 /2
40.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
To Collection Rp. -
40.10.2 FURNITURES
40.10.3 SUNDRIES
H Racking system, FILO Drive in Rack, 3 tier 3 Deep, 1.5m height, plt
including all supports and accessories as drawing specified
To Collection Rp. -
COLLECTIONS
Page 40.10 / 1 -
Page 40.10 / 2 -
40.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 40 Rp. -
PIPEWORKS
To Collection Rp. -
PIPEWORKS (VENTING)
FITTINGS
PIPEWORKS
To Collection Rp. -
FITTINGS
PIPEWORKS
FITTINGS
To Collection Rp. -
C Indoor Hydrant Box (IHB) complete with hose rack, rubber hose, hose reel, valve no
and nozzle
PIPEWORKS
FITTINGS
To Collection Rp. -
To Collection Rp. -
COLLECTION
Page 40.11 /1 -
Page 40.11 /2 -
Page 40.11 /3 -
Page 40.11 /4 -
Page 40.11 /5 -
A 40DB01 no
B 40DB02 no
C 40DBAC01 no
G High bay LED 75W, 10503 lm, c/w nicad battery duration 1 hour no
J Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
K Exit sign LED 5W, 220V, wall mounted no
M Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
O Waterproof LED 40W, 220V, IP65, 400 lm, L1200, c/w nicad battery duration 1 no
hour
P Waterproof LED 20W, 220V, IP65, mounted on steel pipe 2.5mtr height no
Ø50mm
To Collection Rp. -
C Downlight 16W 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
E Batten LED 40W, 220V, 4100 lm, c/w nicad battery duration 1 hour no
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
H Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
K General socket outlet fly catcher, wall mounted, 16A, 250V, single gang no
L General socket outlet c/w cover, wall mounted, 16A, 250V, (waterproof) single no
gang
M General socket outlet hand dryer, wall mounted, 16A, 250V, (waterproof) single no
gang
N Industrial socket outlet, mounted on the front panel door, 16A, 250V, IP65, 1 Ph no
O Industrial socket outlet, mounted on the front panel door, 32A, 400V, IP65, 3 Ph no
To Collection Rp. -
Electrical
Electronic
F Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
N JBFA-40-01 no
To Collection Rp. -
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
H Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
COLLECTIONS
Page 40.12 /1 -
Page 40.12 /2 -
Page 40.12 /3 -
Page 40.12 /4 -
Page 40.12 /5 -
40.13.1 EQUIPMENT
AHU UNIT
Supply and Install of AHU Units complete with hangers/supports,
vibration mountings, neoprene pads and all necessary accessories in
accordance to the technical specification and drawings, as described : -
VRF UNIT
Supply and Install of VRF Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
To Collection Rp. -
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to the
technical specification and drawings, as described : -
C Exhasut Fan EF-40.00.01, mixflow Inline type, cap 996 CMH, static pressure no
167 pa, 0.37kW, 220V/1Ph/50Hz
D Exhasut Fan EF-40.00.02, mixflow Inline type, cap 1041 CMH, static pressure no
363 pa, 0.37kW, 220V/1Ph/50Hz
E Exhasut Fan EF-40.02.01, mixflow Inline type, cap 549 CMH, static pressure no
201 pa, 0.1kW, 220V/1Ph/50Hz
F Exhasut Fan EF-40.02.02, mixflow Inline type, cap 127 CMH, static pressure no
191 pa, 0.1kW, 220V/1Ph/50Hz
40.13.2 DUCTWORK
Supply and Install galvanized steel sheet ductworks complete with
hangers, supports, brackets and all necessary fixing accessories in
accordance to the technical tpecification and drawings, as described :-
Install Textile Fabric duct including with support/rail and similar to it, fittings &
another accessories which are comply to clean room installation
requirement standard in accordance to the technical tpecification and
drawings, as described :-
To Collection Rp. -
Install Textile Fabric duct including with support/rail and similar to it, fittings &
another accessories which are comply to clean room installation
requirement standard in accordance to the technical tpecification and
drawings, as described :-
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
To Collection Rp. -
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
DRAIN PIPES
O 25 mm diameter pipe PVC Class AW c/w insulation m
To Collection Rp. -
COLLECTIONS
Page 40.13 /1 -
Page 40.13 /2 -
Page 40.13 /3 -
Page 40.13 /4 -
Page 40.13 /5 -
SUMMARY
50.2 EARTHWORK -
50.3 CONCRETE -
50.4 MASONRY -
50.5 METALS -
50.9. FINISHES -
50.10 SPECIALITIES -
BILL NO. 50
CARRIED TO SUMMARY -
50.2.2 EARTHWORK
B To Pile Cap m3
C To Slab m3
D To Tie Beam m3
E To Pedestal m3
F To Drop Panel m3
G To Gutter m3
H To Stair m3
I To Pile Cap m2
J To Slab m2
K To Tie Beam m2
L To Drop Panel m2
M To Gutter m2
N To Stair m2
O To Pile Cap m2
P To Slab m2
Q To Tie Beam m2
R To Drop Panel m2
S To Gutter m2
T To Stair m2
To Collection Rp. -
A To Pile Cap m2
B To Slab m2
C To Tie Beam m2
D To Pedestal m2
E To Drop Panel m2
F To Gutter m2
G To Stair m2
50.2.5 OTHERS
Plastic sheet
H To Pile Cap m2
J To Tie Beam m2
K To Drop Panel m2
L To Gutter m2
M To Stair m2
To Collection Rp. -
COLLECTIONS
Page 50.2/1 -
Page 50.2/2 -
50.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 50 Rp. -
50.3.1 FORMWORK
A To Pile Cap m2 -
B To Slab m2 -
C To Tie Beam m2 -
E To Drop Panel m2 -
D To Gutter m2 -
G To Stair m2 -
H To Slab m2 -
I To Beam m2 -
K To Wall/Parapet/Concrete Curb m2 -
L To Gutter m2 -
M To Stair m2 -
N To Plinths m2 -
Bondex BMT 0.7 thick including shear connector, support and all
necessary as drawing specified
O To Floor m2 -
50.3.2 CONCRETE
In-Situ Concrete
O To Pile Cap m3 -
To Collection Rp. -
In-Situ Concrete
D To Wall/Parapet/Concrete Curb m3 -
E To Gutter m3 -
F To Stair m3 -
G To Plinths m3 -
Lean Concrete
H To Pile Cap m2 -
I To Slab m2 -
J To Tie Beam m2 -
K To Drop Panel m2 -
L To Gutter m2 -
50.3.3 REINFORCEMENT
To Slab 2 layers m2 -
To Collection Rp. -
50.3.4 SUNDRIES
To Collection Rp. -
COLLECTIONS
Page 50.3 /1 -
Page 50.3 /2 -
Page 50.3 /2 -
50.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 50 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
50.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
Supply and install sandwich panel PIR Insulation including frames, support
and all necessary in accordance with manufacturer's recommendations, as
specified
D To Roof m2 -
E To Fascia m2 -
F To Wall m2 -
Supply and install gypsum board including frames, support and all
necessary in accordance with manufacturer's recommendations, as specified
G To Wall m2 -
Supply and install sandwich panel PIR Insulation including frames, support
and all necessary in accordance with manufacturer's recommendations, as
specified
H To Ceiling m2 -
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in accordance
with drawings and specifications
I To Ceiling m2 -
Supply and Install Grid system with accoustic tile complete with metal stud
framing hanger and all necessary accessories and support; all in
accordancce with drawings and specifications
J To Ceiling m2 -
50.4 MASONRY
B SC6, WF250x250x9x14 kg -
C SC7, WF300x150x6.5x9 kg -
D SC10, WF350x350x12x19 kg -
E SC11, WF400x200x8x13 kg -
F SC12, WF400x400x13x21 kg -
G PR7, Z 254x21mm kg -
H R3, WF250x125x6x9-R kg -
I R4, WF300x150x6.5x9-R kg -
J R6, WF400x200x8x13-R kg -
K R8, WF500x200x10x16-R kg -
L R9, WF600x200x11x17-R kg -
M SB12, UNP150x75-SB kg -
N SB13, UNP200x80-SB kg -
O SB16A, L75x75x6 kg -
P SB1A, WF150x150x7x10-SB kg -
Q SB2, WF200x100x5.5x8-SB kg -
R SB3, WF250x125x6x9-SB kg -
S SB4, WF300x150x6.5x9-SB kg -
T SB6, WF400x200x8x13-SB kg -
U SB7, WF450x200x9x14-SB kg -
V SB8, WF500x200x10x16-SB kg -
W SB9, WF600x200x11x17-SB kg -
X SB12/13 kg -
Y SG2, WF200x100x5.5x8-SG kg -
To Collection Rp. -
B SG4, WF300x150x6.5x9-SG kg -
C SG5, WF350x175x7x11-SG kg -
D SG6, WF400x200x8x13-SG kg -
E SG7, WF450x200x9x14-SG kg -
F SG8, WF500x200x10x16-SG kg -
H SG9, WF600x200x11x17-SG kg -
I SG9A, WF700x300x13x24-SG kg -
J TR3, Dia16-TR kg -
K VB15, T150x150x6.5x9 kg -
L VB16, T175x175x7x11 kg -
M VB17, T200x200x8x13 kg -
N WB6, Dia25-WB kg -
O All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
50.5.2 OTHERS
P Supply and install galvanized steel grating 30mm thick including all m2 -
support and accessories per drawings and specifications
Q Supply and install galvanized steel grating 32mm thick including all m2 -
support and accessories per drawings and specifications
Supply and install cage ladder including landing step, connecting plates
and all fixing accessories and support as drawing and specification
To Collection Rp. -
COLLECTIONS
Page 50.5/1 -
Page 50.5/2 -
50.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 50 Rp. -
Supply and Install Waterstop Colorbond finish fixed to metal roof sheet,
including sealant and all necessary fixing accessories; all in accordance with
drawings and specifications
A To Roof m -
Supply and Install Metal cladding Trimdek 0.45 BMT finish colorbond
fixed to steel structure, including sealant, over flow galvanized steel pipe
Ø2" 6000mm CTC, and all necessary fixing accessories; all in accordance
with drawings and specifications
B To Fascia m2 -
Supply and Install Metal Flashing 0.45 BMT finish colorbond fixed to steel
purlin, including sealant and all necessary fixing accessories; all in
accordance with drawings and specifications
C To Roof m -
Supply and Install metal gutter 0.5mm with weatherproof sealant complete
with plate support, jointing and all necessary fixing accessories and support,
in accordance with manufacturer's recommendations, as drawings and
specifications
D To Roof Gutter m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
H To Roof m2 -
I To Roof m2 -
50.8.1 DOORS
Supply and install high speed doors including frames, hardwares, treshold,
steel plate, and all necessary accessories and fixing supports as drawings
and specifications
A 50.DA.023 nos -
B 50.DA.024 nos -
C 50.DA.026 nos -
D 50.DA.031 nos -
E 50.DA.033 nos -
F 50.DA.035 nos -
G 50.DA.040 nos -
H 50.DA.042 nos -
I 50.DA.044 nos -
J 50.DB.046 nos -
K 50.DB.047 nos -
L 50.DC.028 nos -
M 50.DC.045 nos -
Supply and install fire shutter doors including frames, hardwares, treshold,
steel plate, and all necessary accessories and fixing supports as drawings
and specifications
N 50.DD.030 nos -
O 50.DD.032 nos -
P 50.DD.034 nos -
Supply and install steel doors including frames, hardwares, treshold, steel
plate, and all necessary accessories and fixing supports as drawings and
specifications
Q 50.DE.001 nos -
R 50.DE.002 nos -
To Collection Rp. -
Supply and install steel doors including frames, hardwares, treshold, steel
plate, and all necessary accessories and fixing supports as drawings and
specifications
A 50.DE.008 nos -
B 50.DF.062 nos -
Supply and install steel door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
C 50.DG.004 nos -
D 50.DG.006 nos -
E 50.DG.022 nos -
F 50.DG.063 nos -
Supply and install steel door including tempered and clear glass, vision
panel / louvre, frames, hardwares, treshold, steel plate, and all fixing
accessories and supports as drawings and specifications
G 50.DH.007 nos -
H 50.DH.016 nos -
I 50.DH.018 nos -
J 50.DH.064 nos -
Supply and install alumnium door including tempered and clear glass,
vision panel / louvre, frames, hardwares, treshold, steel plate, and all fixing
accessories and supports as drawings and specifications
K 50.DK.009 nos -
L 50.DK.010 nos -
Supply and install steel door including frames, hardwares, treshold, steel
plate, and all fixing accessories and supports as drawings and specifications
M 50.DL.017 nos -
N 50.DL.027 nos -
O 50.DL.037 nos -
P 50.DL.038 nos -
Q 50.DL.039 nos -
R 50.DL.065 nos -
To Collection Rp. -
Supply and install steel door including frames, hardwares, treshold, steel
plate, and all fixing accessories and supports as drawings and specifications
A 50.DL.070 nos -
B 50.DL.073 nos -
C 50.DL.074 nos -
D 50.DL.075 nos -
Supply and install steel door including temperedand clear glass, vision
panel / louvre, frames, hardwares, treshold, steel plate, and all fixing
accessories and supports as drawings and specifications
E 50.DN.052 nos -
F 50.DN.077 nos -
I 50.DW.005 nos -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
J 50.DQ.011 nos -
K 50.DQ.012 nos -
L 50.DQ.013 nos -
M 50.DQ.014 nos -
N 50.DQ.015 nos -
O 50.DQ.048 nos -
P 50.DQ.051 nos -
Q 50.DQ.053 nos -
R 50.DQ.055 nos -
To Collection Rp. -
Supply and install alumnium door including tempered and clear glass,
vision panel / louvre, frames, hardwares, treshold, steel plate, and all fixing
accessories and supports as drawings and specifications
A 50.DR.019 nos -
B 50.DR.020 nos -
C 50.DR.021 nos -
D 50.DR.025 nos -
E 50.DR.029 nos -
F 50.DR.041 nos -
G 50.DR.043 nos -
H 50.DR.049 nos -
I 50.DR.050 nos -
J 50.DR.054 nos -
K 50.DR.056 nos -
L 50.DR.059 nos -
M 50.DR.060 nos -
N 50.DR.061 nos -
O 50.DR.067 nos -
P 50.DR.068 nos -
Q 50.DR.069 nos -
R 50.DR.071 nos -
S 50.DR.072 nos -
T 50.DR.076 nos -
To Collection Rp. -
50.8.2 WINDOWS
A 50.WA.011 nos -
B 50.WA.012 nos -
C 50.WA.013 nos -
D 50.WA.014 nos -
E 50.WA.015 nos -
F 50.WA.016 nos -
G 50.WA.017 nos -
H 50.WB.001 nos -
I 50.WB.002 nos -
J 50.WB.003 nos -
K 50.WB.004 nos -
L 50.WB.005 nos -
M 50.WB.006 nos -
N 50.WB.007 nos -
O 50.WB.008 nos -
P 50.WB.009 nos -
Q 50.WB.018 nos -
R 50.WB.019 nos -
S 50.WB.020 nos -
U 50.WB.010 nos -
To Collection Rp. -
50.8.3 LOUVRES
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
A 50.LA.001 nos -
B 50.LA.002 nos -
C 50.LA.003 nos -
D 50.LA.004 nos -
E 50.LA.005 nos -
F 50.LA.006 nos -
G 50.LA.007 nos -
H 50.LA.008 nos -
I 50.LA.009 nos -
J 50.LA.010 nos -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
K 50.SR.001 nos -
To Collection Rp. -
COLLECTIONS
Page 50.8/1 -
Page 50.8/2 -
Page 50.8/3 -
Page 50.8/4 -
Page 50.8/5 -
Page 50.8/6 -
B To Floor m2 -
C To Floor m2 -
D To Floor m2 -
E To Floor m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
F To Floor m2 -
G To Skirting m -
H PU Paint, h=100mm m
J Hardening, h=100mm m
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
K Applied to wall m2 -
To Collection Rp. -
B Applied to wall m2 -
C Applied to wall m2 -
E To Calciboard Ceiling m2 -
F To Exposed Concrete m2 -
G To Exposed Concrete m2 -
To Collection Rp. -
COLLECTIONS
Page 50.9/1 -
Page 50.9/2 -
50.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 50 Rp. -
50.10.2 FURNITURES
To Collection Rp. -
50.10.3 SUNDRIES
F Racking system, FILO Drive in Rack, 3 tier 3 Deep, 1.5m height, plt -
including all supports and accessories as drawing specified
To Collection Rp. -
COLLECTIONS
Page 50.10/1 -
Page 50.10/2 -
50.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 50 Rp. -
PIPEWORKS
To Collection Rp. -
PIPEWORKS (VENTING)
FITTINGS
PIPEWORKS
To Collection Rp. -
FITTINGS
PIPEWORKS
FITTINGS
To Collection Rp. -
D Portable fire extinguisher with capacity 25 kg dry chemical CO2 type c/w trolley. no
E Indoor Hydrant Box (IHB) complete with hose rack, rubber hose, hose reel, valve no
and nozzle
PIPEWORKS
FITTINGS
To Collection Rp. -
To Collection Rp. -
COLLECTION
Page 50.11 /1 -
Page 50.11 /2 -
Page 50.11 /3 -
Page 50.11 /4 -
Page 50.11 /5 -
A 50DB01 no
B 50DB02 no
C 50DB03 no
D 50DBAC01 no
I High bay LED 75W, 10503 lm, c/w nicad battery duration 1 hour no
M Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
N Exit sign LED 5W, 220V, wall mounted no
P Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
To Collection Rp. -
A Waterproof LED 40W, 220V, IP65, 400 lm, L1200, c/w nicad battery duration 1 no
hour
B Waterproof LED 20W, 220V, IP65, mounted on steel pipe 2.5mtr height no
Ø40mm
E Downlight 16W 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
G Batten LED 40W, 220V, 4100 lm, c/w nicad battery duration 1 hour no
H Explosion proof LED 40W, 220V, Zone-2, T6 surface mounted, minimum 4000 lm no
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
K Cabling point from local panel (400V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
N General socket outlet fly catcher, wall mounted, 16A, 240V, single gang no
O General socket outlet c/w cover, wall mounted, 16A, 240V, (waterproof) single no
gang
To Collection Rp. -
A General socket outlet hand dryer, wall mounted, 16A, 240V, (waterproof) single no
gang
B Industrial socket outlet, mounted on the front panel door, 16A, 240V, IP65, 1 Ph no
C Industrial socket outlet, mounted on the front panel door, 32A, 400V, IP65, 3 Ph no
D Industrial combination outlet, 16A, 240V, IP65, 1 Ph & 32A, 400V, IP65, 3 Ph no
Electrical
Electronic
J Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
To Collection Rp. -
A JBFA-40-01 no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
K Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
P Box speaker 6W no
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 50.12 /1 -
Page 50.12 /2 -
Page 50.12 /3 -
Page 50.12 /4 -
Page 50.12 /5 -
Page 50.12 /6 -
50.13.1 EQUIPMENT
AHU UNIT
Supply and Install of AHU Units complete with hangers/supports,
vibration mountings, neoprene pads and all necessary accessories in
accordance to the technical specification and drawings, as described : -
COLD ROOM
Supply and Install of Cold Room Units complete with all necessary
accessories in accordance to the technical specification and drawings, as
described : -
To Collection Rp. -
VRF UNIT
Supply and Install of VRF Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
J OU-VRF.50.00.01; Air cooled VRF, cooling capacity 28.6-55.6 kWth, supply air no
flow 9600 CMH/fan, 380V/3Ph/50Hz
K OU-VRF.50.00.02; Air cooled VRF, cooling capacity 49-68 kWth, supply air no
flow 9600 CMH/fan, 380V/3Ph/50Hz
L OU-VRF.50.02.01; Air cooled VRF, cooling capacity 11-14 kWth, supply air no
flow 6600 CMH/fan, 220V/1Ph/50Hz
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
To Collection Rp. -
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
DUCT HEATER
Supply and Install of Duct Heater Units complete with hangers/supports,
vibration mountings, neoprene pads and all necessary accessories in
accordance to the technical specification and drawings, as described : -
G EDH-50.1, heating cap 2.9kWth, supply air flow 479 CMH, 380V/3Ph/50Hz no
H EDH-50.2, heating cap 3.4kWth, supply air flow 567 CMH, 380V/3Ph/50Hz no
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
J Exhasut Fan EF-50.00.01, centrifugal with accoustic case type, cap 1755 CMH, no
static pressure 406.7 pa, 0.37kW, 220V/1Ph/50Hz
K Exhasut Fan EF-50.00.02A&B, axial wall mounted type, cap 4738 CMH, static no
pressure 83.3 pa, 0.37kW, 380V/3Ph/50Hz
L Exhasut Fan EF-50.00.03, axial wall mounted type, cap 1225 CMH, static no
pressure 98 pa, 0.37kW, 380V/3Ph/50Hz
M Exhasut Fan EF-50.00.04, ceiling mounted type, cap 63 CMH, static pressure no
N/A pa, 0.1kW, 220V/1Ph/50Hz
N Exhasut Fan EF-50.00.05, single inlet centrifugal type, cap 2468 CMH, static no
pressure 313.6 pa, 1.1kW, 380V/3Ph/50Hz
To Collection Rp. -
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
A Exhasut Fan EF-50.00.06, mixflow inline type, cap 867 CMH, static pressure no
205.8 pa, 0.37kW, 220V/1Ph/50Hz
B Exhasut Fan EF-50.00.07, centrifugal with accoustic case, cap 2591 CMH, no
static pressure 294 pa, 0.37kW, 220V/1Ph/50Hz
C Exhasut Fan EF-50.02.01, axial wall mounted type, cap 733 CMH, static no
pressure 166.6 pa, 0.37kW, 380V/3Ph/50Hz
D Exhasut Fan EF-50.02.02, inlet circular duct type, cap 171 CMH, static pressure no
156.8 pa, 0.37kW, 220V/1Ph/50Hz
E Exhasut Fan EF-50.03.01, axial wall mounted type, cap 821 CMH, static no
pressure 166.6 pa, 0.37kW, 380V/3Ph/50Hz
50.13.2 DUCTWORK
Supply and Install galvanized steel sheet ductworks complete with
hangers, supports, brackets and all necessary fixing accessories in
accordance to the technical tpecification and drawings, as described :-
To Collection Rp. -
To Collection Rp. -
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
To Collection Rp. -
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
DRAIN PIPES
P 25 mm diameter pipe PVC Class AW c/w insulation m
To Collection Rp. -
To Collection Rp. -
E ENGINEERING
1. Engineering cost for system development, testing & commissioning (PLC ls
Programming, HMI Programming) ls
2. FAT ls
3. Project documentation : drawing, SOP, etc ls
4. On Site Training (Operational, Maintenance, & Troubleshoot) ls
To Collection Rp. -
COLLECTIONS
Page 50.13 /1 -
Page 50.13 /2 -
Page 50.13 /3 -
Page 50.13 /4 -
Page 50.13 /5 -
Page 50.13 /6 -
Page 50.13 /7 -
Page 50.13 /8 -
Page 50.13 /9 -
SUMMARY
77.2 EARTHWORK -
77.3 CONCRETE -
77.4 MASONRY -
77.5 METALS -
77.9. FINISHES -
BILL NO. 77
CARRIED TO SUMMARY -
77.2.2 EARTHWORK
C To Pile Cap m3
E To Tank Foundation m3
F To Wall m3
G To Tie Beam m3
H To Pile Cap m2
J To Tank Foundation m2
K To Tie Beam m2
L To Pile Cap m2
N To Tank Foundation m2
O To Tie Beam m2
P To Under Ramp m2
To Collection Rp. -
A To Pile Cap m2
C To Tank Foundation m2
D To Wall m2
77.2.5 OTHERS
Plastic sheet
E To Pile Cap m2
G To Tank Foundation m2
H To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 77.2 /1
Page 77.2 /2 -
77.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 77 Rp. -
77.3.1 FORMWORK
A To Pile Cap m2 -
C To Tank Foundation m2 -
E To Wall m2 -
F To Column m2 -
77.3.2 CONCRETE
In-Situ Concrete
G To Pile Cap m3 -
I To Tank Foundation m3 -
K To Wall m3 -
L To Column m3 -
Lean Concrete
M To Pile Cap m2 -
N To Slab on Ground m2 -
To Collection Rp. -
Lean Concrete
A To Tank Foundation m2 -
B To Tie Beam m2 -
77.3.3 REINFORCEMENT
77.3.4 OTHERS
P Supply and install waterstop, steel plate 300x3mm complete with all m -
necessary per drawings and specifications
Q Supply and install slab connection, dowel rebar dia. 16mm (round bar) ctc m -
300, L=300mm, bitumen paint complete with galv. Steel angle and anchor
bolt per drawings and specifications
To Collection Rp. -
COLLECTIONS
Page 31.3 /1 -
Page 31.3 /2 -
77.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 77 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
77.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
E To Wall m2 -
Supply and install gypsum board including frames, support and all
necessary in accordance with manufacturer's recommendations, as specified
F To Wall m2 -
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in
accordance with drawings and specifications
G To Ceiling m2 -
Supply and Install Grid system with accoustic tile complete with metal stud
framing hanger and all necessary accessories and support; all in
accordancce with drawings and specifications
H To Ceiling m2 -
77.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 77 Rp. -
B PR3, C150x65x20x2.3 kg -
C HB17, Dia16-HB kg -
D PR5A, C200x75x20x2.5 kg -
E R1, WF150x75x5x7-R kg -
F R3, WF250x125x6x9-R kg -
G R5, WF350x175x7x11-R kg -
H SB1, WF150x75x5x7-SB kg -
I SB21A, C150x65x20x2.3-SB kg -
J TR2, Dia12-TR kg -
K SB21C, C200x75x20x2.3-SB kg -
L SG2, WF200x100x5.5x8-SG kg -
M SG3, WF250x125x6x9-SG kg -
N SG9, WF600x200x11x17-SG kg -
O All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
77.5 METALS
Supply and Install metal roof Klip Lok Optima 0.45 BMT fixed to steel
purlin including flashing, sealant, and all fixing accessories; all in
accordance with drawings and specifications
Supply and Install Waterstop Colorbond finish fixed to metal roof sheet,
including sealant and all necessary fixing accessories; all in accordance with
drawings and specifications
B To Roof m -
Supply and Install Metal cladding Trimdek 0.45 BMT finish colorbond
fixed to steel structure, including sealant, over flow galvanized steel pipe
Ø2" 6000mm CTC, and all necessary fixing accessories; all in accordance
with drawings and specifications
C To Fascia m2 -
Supply and Install Metal Flashing 0.45 BMT finish colorbond fixed to steel
purlin, including sealant and all necessary fixing accessories; all in
accordance with drawings and specifications
D To Roof m -
Supply and Install metal gutter 0.5mm with weatherproof sealant complete
with plate support, jointing and all necessary fixing accessories and support,
in accordance with manufacturer's recommendations, as drawings and
specifications
E To Roof Gutter m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
H To Roof m2 -
77.8.1 DOORS
Supply and install high speed doors including frames, hardwares, treshold,
steel plate, and all necessary accessories and fixing supports as drawings
and specifications
A 77.DA.001 nos -
B 77.DB.002 nos -
C 77.DB.003 nos -
Supply and install steel doors including frames, hardwares, treshold, steel
plate, and all necessary accessories and fixing supports as drawings and
specifications
D 77.DL.004 nos -
E 77.DL.005 nos -
F 77.DL.008 nos -
Supply and install steel door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
G 77.DL.006 nos -
H 77.DL.007 nos -
77.8.2 WINDOWS
I 77.WA.001 nos -
J 77.WA.002 nos -
K 77.WB.003 nos -
77.8.3 LOUVRES
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
L 77.LA.001 nos -
M 77.LA.002 nos -
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
A 77.LA.003 nos -
B 77.LA.004 nos -
C 77.LA.005 nos -
D 77.LA.006 nos -
E 77.LA.007 nos -
F 77.LA.008 nos -
G 77.LA.009 nos -
H 77.LA.010 nos -
I 77.LA.011 nos -
J 77.LA.012 nos -
K 77.LA.013 nos -
L 77.LA.014 nos -
L 77.LA.015 nos -
M 77.LA.016 nos -
O 77.LA.017 nos -
P 77.LA.018 nos -
Q 77.LA.019 nos -
To Collection Rp. -
COLLECTIONS
Page 77.8 /1 -
Page 77.8 /2 -
A To Floor m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
B To Floor m2 -
C To Skirting m -
G To Calciboard Ceiling m2 -
77.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 77 Rp. -
77.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 77 Rp. N/A
PIPEWORKS
FITTINGS
D Indoor Hydrant Box (IHB) complete with hose rack, rubber hose, hose reel, valve no
and nozzle
To Collection Rp. -
PIPEWORKS
FITTINGS
To Collection Rp. -
FITTINGS
To Collection Rp. -
COLLECTION
Page 77.11 /1 -
Page 77.11 /2 -
Page 77.11 /3 -
A 77DB01 no
D High bay LED 75W, 10503 lm, c/w nicad battery duration 1 hour no
F Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
I Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
M Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
To Collection Rp. -
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
C General socket outlet c/w cover, wall mounted, 16A, 250V, (waterproof) single no
gang
Electrical
D Cable tray 300x100mm m
Electronic
E Cable tray 200x100mm m
F Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
K JBFA-77-01 no
To Collection Rp. -
D Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 77.12 /1 -
Page 77.12 /2 -
Page 77.12 /3 -
Page 77.12 /4 -
77.13.1 EQUIPMENT
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
DRAIN PIPES
F 25 mm diameter pipe PVC Class AW c/w insulation m
SUMMARY
92.2 EARTHWORK -
92.3 CONCRETE -
92.4 MASONRY -
92.5 METALS -
92.9. FINISHES -
92.10 SPECIALITIES -
BILL NO. 92
CARRIED TO SUMMARY -
92.2.2 EARTHWORK
B To Pile Caps m3
D To Tie Beam m3
E To Pedestal m3
F To Plinths/Tank Foundation m3
G To Pile Caps m2
I To Tie Beam m2
J To Plinths/Tank Foundation m2
K To Pile Caps m2
L To Slab m2
M To Tie Beam m2
N To Plinths/Tank Foundation m2
O To Under Ramp m2
P To Pile Caps m2
To Collection Rp. -
A To Tie Beam m2
B To Pedestal m2
C To Plinths/Tank Foundation m2
92.2.5 OTHERS
Plastic sheet
D To Pile Caps m2
E To Perimeter Slab m2
F To Tie Beam m2
G To Plinths/Tank Foundation m2
To Collection Rp. -
COLLECTIONS
Page 92.2/1 -
Page 92.2/2 -
92.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 92 Rp. -
92.3.1 FORMWORK
A To Pile Caps m2 -
C To Tie Beam m2 -
D To Upper Slab m2 -
F To Gutter m2 -
G To Plinths m2 -
Bondex BMT 0.7 thick including shear connector, support and all
necessary as drawing specified
H To Floor m2 -
92.3.2 CONCRETE
In-Situ Concrete
I To Pile Caps m3 -
M To Plinths m3 -
To Collection Rp. -
Lean Concrete
A To Pile Caps m2 -
C To Tie Beam m2 -
E To Plinths/Tank Foundation m2 -
92.3.3 REINFORCEMENT
Wiremesh as specified
92.3.4 SUNDRIES
To Collection Rp. -
COLLECTIONS
Page 92.3 /1 -
Page 92.3 /2 -
92.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 92 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
92.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in
accordance with drawings and specifications
E To Ceiling m2 -
Supply and Install Grid system with accoustic tile complete with metal stud
framing hanger and all necessary accessories and support; all in
accordancce with drawings and specifications
F To Ceiling m2 -
92.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 92 Rp. -
B SC8, WF300x300x10x15 kg -
D HB17, Dia16-HB kg -
E PR3, C150x65x20x2.3 kg -
F PR5, C200x75x20x2.3 kg -
G PR5A, C200x75x20x2.5 kg -
H R1, WF150x75x5x7-R kg -
I R2, WF200x100x5.5x8-R kg -
J R3, WF250x125x6x9-R kg -
K SB1, WF150x75x5x7-SB kg -
L SB3, WF250x125x6x9-SB kg -
M SB5, WF350x175x7x11-SB kg -
N SB6, WF400x200x8x13-SB kg -
O SB9, WF600x200x11x17-SB kg -
P SB10, UNP100x50-SB kg -
Q SB14, UNP200x90-SB kg -
R SB16A, L50x50x5-SB kg -
S SB21A, C150x65x20x2.3-SB kg -
T SB21D, C125x50x20x2.3 kg -
U SG2, WF200x100x5.5x8-SG kg -
V SG3, WF250x125x6x9-SG kg -
W SG5, WF350x175x7x11-SG kg -
X SG6, WF400x200x8x13-SG kg -
To Collection Rp. -
B SG9, WF600x200x11x17-SG kg -
C SG9A, WF588x300x12x20-SG kg -
D TR2, Dia12-TR kg -
E All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
Supply and install steel stair complete with step, railing, base plate, kick
plate, and all neccesary fixing accessories and support as drawing and
specification
F Staircase 1 no -
G Staircase 3 no -
Supply and install cage ladder including landing step, connecting plates
and all fixing accessories and support as drawing and specification
92.5.3 RAILING
Supply and Install steel pipe railing including handrail support and knee
railing complete with kick plate, anchor bolt and all necessary fixing
accessories as drawings and specifications
J To staircase 3 m -
92.5.4 OTHERS
K Supply and install chequered plate 4.5mm thick including, support and m2 -
all necessary per drawings and specifications
L Supply and install galvanized steel grating 32mm thick including all m2 -
support and accessories per drawings and specifications
To Collection Rp. -
COLLECTIONS
Page 92.5 /1 -
Page 92.5 /2 -
92.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 92 Rp. -
Supply and Install metal roof Klip Lok Optima 0.45 BMT fixed to steel
purlin including flashing, sealant, and all fixing accessories; all in
accordance with drawings and specifications
Supply and Install Waterstop Colorbond finish fixed to metal roof sheet,
including sealant and all necessary fixing accessories; all in accordance with
drawings and specifications
B To Roof m -
Supply and Install Metal cladding Trimdek 0.45 BMT finish colorbond
fixed to steel structure, including sealant, over flow galvanized steel pipe
Ø2" 6000mm CTC, and all necessary fixing accessories; all in accordance
with drawings and specifications
C To Fascia m2 -
Supply and Install Metal Flashing 0.45 BMT finish colorbond fixed to steel
purlin, including sealant and all necessary fixing accessories; all in
accordance with drawings and specifications
D To Roof m -
Supply and Install metal gutter 0.5mm with weatherproof sealant complete
with plate support, jointing and all necessary fixing accessories and support,
in accordance with manufacturer's recommendations, as drawings and
specifications
E To Roof Gutter m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
92.8.1 DOORS
Supply and install steel rolling doors including frames, hardwares, treshold,
steel plate, and all necessary accessories and fixing supports as drawings
and specifications
A 92.DE.001 nos -
B 92.DE.015 nos -
C 92.DE.016 nos -
D 92.DE.017 nos -
E 92.DE.018 nos -
F 92.DE.024 nos -
G 92.DE.025 nos -
Supply and install steel door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
H 92.DE.026 nos -
I 92.DE.012 nos -
J 92.DE.013 nos -
K 92.DE.019 nos -
L 92.DE.020 nos -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
M 92.DQ.005 nos -
N 92.DQ.006 nos -
O 92.DQ.007 nos -
P 92.DQ.008 nos -
Q 92.DQ.009 nos -
R 92.DR.002 nos -
S 92.DR.003 nos -
T 92.DR.010 nos -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
A 92.DR.011 nos -
B 92.DR.014 nos -
C 92.DR.022 nos -
Supply and install glass door including frames, hardwares, treshold, steel
plate, and all fixing accessories and supports as drawings and specifications
D 92.DU.021 nos -
E 92.DU.023 nos -
92.8.2 WINDOWS
F 92.WA.001 nos -
G 92.WA.002 nos -
H 92.WA.003 nos -
I 92.WA.004 nos -
J 92.WA.005 nos -
K 92.WA.006 nos -
L 92.WA.007 nos -
M 92.WA.008 nos -
N 92.WA.009 nos -
O 92.WA.010 nos -
P 92.WA.011 nos -
Q 92.WA.012 nos -
92.8.3 LOUVRES
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
R 92.LA.001 nos -
S 92.LA.002 nos -
To Collection Rp. -
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
and specification.
A 92.LA.003 nos -
B 92.LA.004 nos -
C 92.LA.005 nos -
D 92.LA.006 nos -
E 92.LA.007 nos -
F 92.LA.008 nos -
G 92.LA.009 nos -
H 92.LA.010 nos -
I 92.LA.011 nos -
J 92.LA.012 nos -
K 92.LA.013 nos -
L 92.LA.014 nos -
M 92.LA.015 nos -
N 92.LA.016 nos -
O 92.LA.017 nos -
P 92.LA.018 nos -
Q 92.LA.019 nos -
R 92.LA.020 nos -
S 92.LA.021 nos -
T 92.LA.022 nos -
U 92.LA.023 nos -
V 92.LA.024 nos -
W 92.LA.025 nos -
X 92.LA.026 nos -
To Collection Rp. -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
To Collection Rp. -
COLLECTIONS
Page 92.8 /1 -
Page 92.8 /2 -
Page 92.8 /3 -
Page 92.8 /4 -
A To Floor m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
C To Floor m2 -
D To Skirting m -
Supply and install Homogenous Tile Anti Skid complete with screed, gape
grouting and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
E To Floor m2 -
F To Skirting m -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
G To Toilet m2 -
J To Calciboard Ceiling m2 -
K To Exposed Concrete
L To Exposed Concrete m2 -
92.9. FINISHES
N Shower nos -
92.10 SPECIALITIES
PIPEWORKS
PIPEWORKS (VENTING)
To Collection Rp. -
PIPEWORKS (VENTING)
FITTINGS
PIPEWORKS
FITTINGS
To Collection Rp. -
FITTINGS
D Portable fire extinguisher with capacity 4.5 kg chemical powder ABC type. no
G Indoor Hydrant Box (IHB) complete with hose rack, rubber hose, hose reel, valve no
and nozzle
PIPEWORKS
FITTINGS
To Collection Rp. -
FITTINGS
To Collection Rp. -
COLLECTION
Page 92.11 /1 -
Page 92.11 /2 -
Page 92.11 /3 -
Page 92.11 /4 -
A 92DB01 no
B 92DBAC01 no
F Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
I Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
K Waterproof LED 40W, 220V, IP65, 4000 lm, L1200, c/w nicad battery duration no
1 hour
N Downlight 16W, 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
To Collection Rp. -
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
C Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
F General socket outlet c/w cover, wall mounted, 16A, 250V, (waterproof) single no
gang
G General socket outlet hand dryer, wall mounted, 16A, 250V, (waterproof) single no
gang
H General socket outlet c/w cover outbow type, wall mounted, 16A, 250V, no
(waterproof) single gang
Electrical
K Cable tray 300x100mm m
Electronic
M Cable tray 200x100mm m
To Collection Rp. -
A Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
I JBFA-92-01 no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
T Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
To Collection Rp. -
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 92.12 /1 -
Page 92.12 /2 -
Page 92.12 /3 -
Page 92.12 /4 -
Page 92.12 /5 -
92.13.1 EQUIPMENT
VRF UNIT
Supply and Install of VRF Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
N HEXV-92.02.01, heat exchanger, air flow 746 CMH, static pressure 150 pa, no
0.55kW, 220V/1Ph/50Hz
To Collection Rp. -
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to the
technical specification and drawings, as described : -
A Exhasut Fan EF-92.00.01, mixflow inline type, cap 1260 CMH, static pressure no
294 pa, 0.37kW, 220V/1Ph/50Hz
B Exhasut Fan EF-92.00.02, centrifugal with accoustic case type, cap 2110 CMH, no
static pressure 284 pa, 0.37kW, 220V/1Ph/50Hz
C Exhasut Fan EF-92.00.03, mixflow inline type, cap 448 CMH, static pressure no
221 pa, 0.37kW, 220V/1Ph/50Hz
D Exhasut Fan EF-92.00.04A-D, axial wall mounted type, cap 6654 CMH, static no
pressure 113 pa, 0.55kW, 380V/3Ph/50Hz
92.13.2 DUCTWORK
Supply and Install galvanized steel sheet ductworks complete with hangers,
supports, brackets and all necessary fixing accessories in accordance to the
technical tpecification and drawings, as described :-
To Collection Rp. -
To Collection Rp. -
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
To Collection Rp. -
DRAIN PIPES
F 25 mm diameter pipe PVC Class AW c/w insulation m
To Collection Rp. -
COLLECTIONS
Page 92.13 /1 -
Page 92.13 /2 -
Page 92.13 /3 -
Page 92.13 /4 -
Page 92.13 /5 -
SUMMARY
94.2 EARTHWORK -
94.3 CONCRETE -
94.4 MASONRY -
94.5 METALS -
94.9. FINISHES -
94.10 SPECIALITIES -
BILL NO. 94
CARRIED TO SUMMARY -
94.2.1 EARTHWORK
A To Footings m3
C To Tie Beam m3
D To Column m3
E To Weighe Bridge m3
F To Footings m2
H To Tie Beam m2
I To Weighe Bridge m2
J To Footings m2
K To Slab m2
L To Tie Beam m2
M To Weighe Bridge m2
O To Footings m2
Q To Tie Beam m2
R To Column m2
S To Weighe Bridge m2
To Collection Rp. -
94.2.4 OTHERS
Plastic sheet
A To Footings m2
B To Perimeter Slab m2
C To Tie Beam m2
D To Weighe Bridge m2
To Collection Rp. -
COLLECTIONS
Page 94.2/1 -
Page 94.2/2 -
94.2 EARTHWORK
94.3.1 FORMWORK
A To Footings m2 -
B To Ground Slab m2 -
C To Tie Beam m2 -
D To Weighe Bridge m2 -
F To Beam m2 -
G To Column m2 -
H To Gutter m2 -
I To Wall/Parapet/Bundwall m2 -
94.3.2 CONCRETE
In-Situ Concrete
J To Footings m3 -
M To Column m3 -
N To Wall m3 -
O To Gutter m3 -
P To Weighe Bridge m3 -
To Collection Rp. -
Lean Concrete
A To Footings m2 -
B To Slab m2 -
C To Tie Beam m2 -
D To Weighe Bridge m2 -
94.3.3 REINFORCEMENT
To Collection Rp. -
94.3.4 OTHERS
Weighing bridge
A Side Curbing m -
C Pipe arde m -
D Make a hole no -
To Collection Rp. -
COLLECTIONS
Page 94.3 /1 -
Page 94.3 /2 -
Page 94.3 /3 -
94.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 94 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
94.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
94.4.3 CEILING
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in
accordance with drawings and specifications
D To Ceiling m2 -
94.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 94 Rp. -
94.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 94 Rp. -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
Supply and install rubberized asphalt sheet, extrude polystyrene boar 30mm
thick, PU separation sheet, screed all in accordance with manufacturer's
recommendations, drawings and specifications
C To Concrete Roof m2 -
94.7.2 SUNDRIES
94.8.1 DOORS
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
94.8.2 WINDOWS
E 94.WA.004 nos -
F 94.WA.005 nos -
G 94.WB.002 nos -
H 94.WB.003 nos -
I 94.WC.001 nos -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
A To Guard House m2 -
B To Skirting m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
C To Toilet m2 -
G To Exposed Concrete m2 -
H To Ceiling m2 -
94.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 94 Rp. -
G SF23, Mirror no -
94.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 94 Rp. -
PIPEWORKS
PIPEWORKS (VENTING)
FITTINGS
To Collection Rp. -
Supply and Install STP Biotech cap. 3m3/day c/w Blower for aeration system,
effluent pump and all of supporting accessories. STP Biotech made of FRP
material, influuent BOD= 200 mg/lt, Efluent BOD=30 mg/lt, c/w control box,
vent pipe etc.
To Collection Rp. -
COLLECTION
Page 94.11 /1 -
Page 94.11 /2 -
A 94DB01 no
D Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
G Downlight 16W, 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
J Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
To Collection Rp. -
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
Electrical
C Cable tray 200x100mm m
Electronic
D Cable tray 100x100mm m
E Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
K MCPFA no
L JBFA-94-01 no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 94.12 /1 -
Page 94.12 /2 -
Page 94.12 /3 -
Page 94.12 /4 -
94.13.1 EQUIPMENT
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to the
technical specification and drawings, as described : -
C Exhasut Fan EF-94.00.01, axial wall mounted, cap 105-314 CMH, axial wall no
mounted, static pressure 117.6 pa, 0.1kW, 380V/3Ph/50Hz
D Exhasut Fan EF-94.00.01, axial wall mounted, cap 143-314 CMH, axial wall no
mounted, static pressure 117.6 pa, 0.1kW, 380V/3Ph/50Hz
DRAIN PIPES
G 25 mm diameter pipe PVC Class AW c/w insulation m
SUMMARY
95.2 EARTHWORK -
95.3 CONCRETE -
95.4 MASONRY -
95.5 METALS -
95.9. FINISHES -
BILL NO. 95
CARRIED TO SUMMARY -
95.2.1 EARTHWORK
A To Footings m3
C To Tie Beam m3
D To Column m3
E To Footings m2
G To Tie Beam m2
H To Footings m2
I To Slab m2
J To Tie Beam m2
L To Footings m2
N To Tie Beam m2
O To Column m2
To Collection Rp. -
95.2.4 OTHERS
Plastic sheet
A To Footings m2
B To Perimeter Slab m2
C To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 95.2/1 -
Page 95.2/2 -
95.2 EARTHWORK
95.3.1 FORMWORK
A To Footings m2 -
C To Tie Beam m2 -
D To Beam m2 -
E To Column m2 -
F To Gutter m2 -
G To Wall m2 -
H To Plinths m2 -
95.3.2 CONCRETE
In-Situ Concrete
I To Footings m3 -
M To Wall m3 -
N To Plinths m3 -
To Collection Rp. -
Lean Concrete
A To Footings m2 -
C To Tie Beam m2 -
95.3.3 REINFORCEMENT
95.3.4 SUNDRIES
O Supply and install steel galvanized grating 40mm thick including steel m2
angle, plate and all necessary per drawings and specifications (Cover
P Supply and install polystirene 5mm thick replace by flexible joint, dowel m
16mm (round bar) ctc 300, L=300mm one side coated with bitumen per
darings and specifications
To Collection Rp. -
COLLECTIONS
Page 95.3 /1 -
Page 95.3 /2 -
95.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 95 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
95.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
95.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 95 Rp. -
B HB17, Dia16-HB kg -
C PR5, C200x75x20x2.3 kg -
D R1, WF150x75x5x7-R kg -
E R2, WF250x125x6x9-R kg -
F R3, WF300x150x6.5x9-R kg -
G SB1A, WF100x50x5x7-SB kg -
H SB2, WF200x100x5.5x8-SB kg -
I SB21B, C100x50x20x2.3-SB kg -
J SG1, WF150x75x5x7-SG kg -
K SG2, WF200x100x5.5x8-SG kg -
L TR2, Dia12-TR kg -
M All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
95.5 METALS
CARRIED TO SUMMARY AT END OF BILL NO. 95 Rp. -
Supply and Install metal roof Klip Lok Optima 0.45 BMT fixed to steel
purlin including flashing, sealant, and all fixing accessories; all in
accordance with drawings and specifications
A To Roof m2 -
Supply and Install Waterstop Colorbond finish fixed to metal roof sheet,
including sealant and all necessary fixing accessories; all in accordance with
drawings and specifications
B To Roof m -
Supply and Install Metal cladding Trimdek 0.45 BMT finish colorbond
fixed to steel structure, including sealant, over flow galvanized steel pipe
Ø2" 6000mm CTC, and all necessary fixing accessories; all in accordance
with drawings and specifications
C To Fascia m2 -
Supply and Install Metal Flashing 0.45 BMT finish colorbond fixed to steel
purlin, including sealant and all necessary fixing accessories; all in
accordance with drawings and specifications
D To Roof m -
Supply and Install metal gutter 0.5mm with weatherproof sealant complete
with plate support, jointing and all necessary fixing accessories and support,
in accordance with manufacturer's recommendations, as drawings and
specifications
E To Roof Gutter m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
95.8.1 DOORS
Supply and install steel doors including frames, hardwares, treshold, steel
plate, and all necessary accessories and fixing supports as drawings and
A 95.DG.001 nos -
95.8.2 LOUVRES
Supply and install steel louvre complete with removable insect screen,
hardwares, and all necessary components, fixing, accessories as drawing
B 95.LA.001 nos -
C 95.LA.002 nos -
D 95.LA.003 nos -
E 95.LA.004 nos -
F 95.LA.005 nos -
Supply and install floor hardener including all necessary per drawings and
specifications
A To Floor m2 -
B Skirting, PU paint m -
95.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 95 Rp. -
95.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 95 Rp. N/A
95.11.1 EQUIPMENT
Supply and Install of following main equipment plumbing including control panel,
valve, supporting frame, connection, fixing, testing, commissioning and all
necessary accessories in arcondance to the technical spesification as shown on
drawing, as described : -
A Main Electrical Fire Pump, NFPA-20 and UL/FM listed with capacity 2000 no
GPM, 10 Bar (150 psi), power 336 BHP (MP-01)
B Diesel Engine fire Pump, NFPA-20 and UL/FM listed with capacity 2000 GPM, no
12 Bar (175 psi), power 336 BHP (MP-02)
C Jockey pump, in line centrifugal type with capacity 50 GPM, 13 Bar (185 psi), no
power 8 kw / 380 v / 50 Hz
D Daily fuel tank capacity 515 gallons complete with spill protection and all set
accessories needed.
PIPEWORKS
FITTINGS
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 95.11 /1 -
Page 95.11 /2 -
A 95DB01 no
D High bay LED 75W, 10503 lm, 220V, surface mounted, c/w nicad battery no
duration 1 hour
F Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
H Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
I General socket outlet c/w cover, wall mounted, 16A, 250V, single gang no
J General socket outlet c/w cover, wall mounted, 16A, 250V, double gang no
To Collection Rp. -
Electrical
A Cable ladder 600x100mm m
C Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
COLLECTIONS
Page 95.12 /1 -
Page 95.12 /2 -
SUMMARY
96.2 EARTHWORK -
96.3 CONCRETE -
96.4 MASONRY -
96.5 METALS -
96.9. FINISHES -
96.10 SPECIALITIES -
BILL NO. 96
CARRIED TO SUMMARY -
96.2.2 EARTHWORK
D To Tie Beam m3
E To Pedestal m3
H To Tie Beam m2
J To Slab m2
K To Tie Beam m2
O To Tie Beam m2
P To Pedestal m2
To Collection Rp. -
96.2.5 OTHERS
Plastic sheet
B To Perimeter Slab m2
C To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 96.2/1 -
Page 96.2/2 -
96.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 96 Rp. -
96.3.1 FORMWORK
C To Tie Beam m2 -
D To Upper Slab m2 -
E To Beam m2 -
G To Gutter m2 -
H To Wall/Parapet m2 -
I To Stairs m2 -
96.3.2 CONCRETE
In-Situ Concrete
N To Wall/Parapet m3 -
O To Stairs m3 -
To Collection Rp. -
Lean Concrete
C To Tie Beam m2 -
96.3.3 REINFORCEMENT
96.3.4 SUNDRIES
To Collection Rp. -
COLLECTIONS
Page 96.3 /1 -
Page 96.3 /2 -
96.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 96 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
96.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
Supply and install gypsum board including frames, support and all
necessary in accordance with manufacturer's recommendations, as specified
D To Wall m2 -
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in accordance
with drawings and specifications
E To Ceiling m2 -
Supply and Install Grid system with accoustic tile complete with metal stud
framing hanger and all necessary accessories and support; all in
accordancce with drawings and specifications
F To Ceiling m2 -
96.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 96 Rp. -
B R3, WF250x125x6x9 kg -
C SB2, WF200x100x5.5x8 kg -
D SB13, UNP200x80x7.5x11 kg -
E SB21, SP kg -
F SG13, UNP200x80x7.5x11 kg -
G All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
96.5.2 RAILING
Supply and Install steel pipe railing including handrail support and knee
railing complete with kick plate, anchor bolt and all necessary fixing
accessories as drawings and specifications
H To staircase m -
96.7.3 OTHERS
I Supply and install galvanized steel grating 32mm thick including all m2 -
support and accessories per drawings and specifications
96.5 METALS
Supply and install aluminium composite panel fire retardant core including
steel support, aluminium support, hollow support, framing, sealant, other
jointing system, and all fixing accessories as drawings and specifications
C To Canopy Ceiling m2
Supply and Install metal roof Klip Lok Optima 0.45 BMT finish fixed to
steel purlin including flashing, sealant, and all fixing accessories; all in
accordance with drawings and specifications
A To Canopy m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
D To Roof m2 -
E To Roof m2 -
96.8.1 DOORS
Supply and install steel door including tempered and clear glass, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
A 96.DH.002 nos -
Supply and install steel door including tempered and clear glass, vision
panel / louvre, frames, hardwares, treshold, steel plate, and all fixing
accessories and supports as drawings and specifications
B 96.DL.013 nos -
C 96.DL.014 nos -
D 96.DL.021 nos -
E 96.DL.039 nos -
Supply and install alumnium door including tempered and clear glass,
frames, hardwares, treshold, steel plate, and all fixing accessories and
supports as drawings and specifications
F 96.DK.008 nos -
G 96.DK.016 nos -
H 96.DR.015 nos -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
O 96.DQ.009 nos -
P 96.DQ.010 nos -
Q 96.DQ.011 nos -
R 96.DQ.012 nos -
S 96.DQ.019 nos -
To Collection Rp. -
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
A 96.DQ.020 nos -
B 96.DQ.023 nos -
C 96.DQ.024 nos -
D 96.DQ.025 nos -
E 96.DQ.026 nos -
Supply and install glass door including frames, hardwares, treshold, steel
plate, and all fixing accessories and supports as drawings and specifications
F 96.DT.001 nos -
G 96.DU.006 nos -
H 96.DU.017 nos -
I 96.DU.018 nos -
J 96.DU.028 nos -
K 96.DU.029 nos -
L 96.DU.030 nos -
M 96.DU.031 nos -
N 96.DU.032 nos -
O 96.DU.033 nos -
P 96.DU.034 nos -
Q 96.DU.035 nos -
R 96.DU.036 nos -
S 96.DU.037 nos -
96.DU.038 nos -
96.8.2 WINDOWS
T 96.WA.001 nos -
To Collection Rp. -
A 96.WA.005 nos -
B 96.WA.008 nos -
C 96.WB.003 nos -
D 96.WB.004 nos -
E 96.WB.006 nos -
F 96.WB.007 nos -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
G 96.SA.001 nos -
H 96.SA.002 nos -
I 96.SB.003 nos -
J 96.SB.004 nos -
K 96.SC.005 nos -
L 96.SD.006 nos -
M 96.SE.007 nos -
N 96.SF.008 nos -
O 96.SF.009 nos -
P 96.SF.010 nos -
Q 96.SF.011 nos -
R 96.SF.012 nos -
S 96.SF.013 nos -
T 96.SF.014 nos -
U 96.SG.015 nos -
V 96.SH.016 nos -
To Collection Rp. -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
A 96.SI.017 nos -
B 96.SJ.018 nos -
C 96.SJ.019 nos -
D 96.SJ.020 nos -
E 96.SJ.021 nos -
F 96.SJ.025 nos -
G 96.SJ.026 nos -
H 96.SJ.027 nos -
I 96.SJ.028 nos -
J 96.SJ.029 nos -
K 96.SJ.030 nos -
L 96.SJ.031 nos -
M 96.SK.022 nos -
N 96.SL.023 nos -
O 96.SL.024 nos -
P 96.SM.032 nos -
Q 96.SN.033 nos -
R 96.SN.034 nos -
S 96.SO.035 nos -
T 96.SP.036 nos -
U 96.SQ.037 nos -
V 96.SQ.039 nos -
W 96.SQ.041 nos -
Y 96.SR.040 nos -
Z 96.SR.042 nos -
To Collection Rp. -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
A 96.SR.043 nos -
B 96.SR.044 nos -
C 96.SR.045 nos -
D 96.SS.046 nos -
E 96.ST.047 nos -
F 96.SU.048 nos -
G 96.SU.049 nos -
H 96.SV.050 nos -
To Collection Rp. -
COLLECTIONS
Page 96.8 /1 -
Page 96.8 /2 -
Page 96.8 /3 -
Page 96.8 /4 -
Page 96.8 /5 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
B To Floor m2 -
C To Skirting m -
Supply and install Epoxy coating including all necessary and all in
accordance with manufactured instruction applied: all in accordance with
drawings and specifications
D To Floor m2 -
E To Skirting m -
Carpet tile including support and all necessary; all in accordance with
manufactured instruction applied: all in accordance with drawings and
specifications
G To Floor m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
I Applied to wall m2 -
To Collection Rp. -
A To Exposed Concrete m2 -
C To Ceiling m2 -
D To Exposed Concrete m2 -
To Collection Rp. -
COLLECTIONS
Page 96.9 /1 -
Page 96.9 /2 -
96.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 96 Rp. -
96.10.2 FURNITURES
96.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 96 Rp. -
PIPEWORKS
To Collection Rp. -
PIPEWORKS (VENTING)
FITTINGS
PIPEWORKS
To Collection Rp. -
FITTINGS
H Portable fire extinguisher with capacity 25 kg dry chemical CO2 type c/w trolley. no
I Indoor Hydrant Box (IHB) complete with hose rack, rubber hose, hose reel, valve no
and nozzle
PIPEWORKS
To Collection Rp. -
FITTINGS
To Collection Rp. -
COLLECTION
Page 96.11 /1 -
Page 96.11 /2 -
Page 96.11 /3 -
Page 96.11 /4 -
A 96DB01 no
B 96DB02 no
C 96DB-E_UPS no
F 96DBAC01 no
L Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
O Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
Q Downlight 16W, 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
To Collection Rp. -
Supply and Install lighting & switch cables from sub circuit to final circuit
including grounding system and all neccessary accessories accordance with the
technical specification and drawings, as described :-
C Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
F General socket outlet hand dryer, wall mounted, 16A, 250V, (waterproof) single no
gang
Electrical
I Cable tray 300x100mm m
Electronic
K Cable tray 300x100mm m
To Collection Rp. -
A Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
H JBFA-96-01 no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
P Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
To Collection Rp. -
A MDFPA no
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 96.12 /1 -
Page 96.12 /2 -
Page 96.12 /3 -
Page 96.12 /4 -
Page 96.12 /5 -
96.13.1 EQUIPMENT
VRF UNIT
Supply and Install of VRF Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
I IU-VRF.96.00.09; high static split duct, cooling capacity 11kWth, supply air no
flow 2280 CMH, static pressure 220 pa, 0.37kW, 220V/1Ph/50Hz
K IU-VRF.96.00.11; high static split duct, cooling capacity 14kWth, supply air no
flow 2280 CMH, static pressure 220 pa, 0.37kW, 220V/1Ph/50Hz
L IU-VRF.96.00.12A-B; high static split duct, cooling capacity 22kWth, supply air no
flow 2400 CMH, static pressure 220 pa, 0.75kW, 380V/2Ph/50Hz
To Collection Rp. -
VRF UNIT
Supply and Install of VRF Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
E IU-VRF.96.01.08; mid static split duct, cooling capacity 1.8kWth, supply air no
flow 316 CMH, static pressure 100 pa, 0.1kW, 220V/1Ph/50Hz
H IU-VRF.96.01.11A-B; mid static split duct, cooling capacity 2.3kWth, supply air no
flow 510 CMH, static pressure 100 pa, 0.1kW, 220V/1Ph/50Hz
I IU-VRF.96.01.12; mid static split duct, cooling capacity 2.3kWth, supply air no
flow 510 CMH, static pressure 100 pa, 0.1kW, 220V/1Ph/50Hz
J IU-VRF.96.01.13; mid static split duct, cooling capacity 2.3kWth, supply air no
flow 510 CMH, static pressure 100 pa, 0.1kW, 220V/1Ph/50Hz
To Collection Rp. -
DX UNIT
Supply and Install of DX Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to
the technical specification and drawings, as described : -
C HEXV-92.02.01, heat exchanger, air flow 746 CMH, static pressure 150 pa, no
0.55kW, 220V/1Ph/50Hz
D HEXV-92.00.01, heat exchanger, air flow 1087 CMH, static pressure 160 pa, no
0.55kW, 220V/1Ph/50Hz
E HEXV-92.01.01, heat exchanger, air flow 518 CMH, static pressure 150 pa, no
0.55kW, 220V/1Ph/50Hz
F HEXV-92.01.02, heat exchanger, air flow 728 CMH, static pressure 150 pa, no
0.55kW, 220V/1Ph/50Hz
FAN
Supply and Install of Fan Units complete with hangers/supports, vibration
mountings, neoprene pads and all necessary accessories in accordance to the
technical specification and drawings, as described : -
G Exhasut Fan EF-96.00.01, centrifugal with accoustic case, cap 2179 CMH, no
static pressure 372 pa, 0.37kW, 220V/1Ph/50Hz
H Exhasut Fan EF-96.00.02, mixflow inline, cap 683 CMH, static pressure 147 pa, no
0.37kW, 220V/1Ph/50Hz
I Exhasut Fan EF-96.00.03, mixflow inline, cap 852 CMH, static pressure 211 pa, no
0.37kW, 220V/1Ph/50Hz
J Exhasut Fan EF-96.02.01, mixflow inline, cap 683 CMH, static pressure 147 pa, no
0.37kW, 220V/1Ph/50Hz
To Collection Rp. -
96.13.2 DUCTWORK
Supply and Install galvanized steel sheet ductworks complete with
hangers, supports, brackets and all necessary fixing accessories in
accordance to the technical tpecification and drawings, as described :-
Install Textile Fabric duct including with support/rail and similar to it, fittings &
another accessories which are comply to clean room installation
requirement standard in accordance to the technical tpecification and
drawings, as described :-
To Collection Rp. -
Install Textile Fabric duct including with support/rail and similar to it, fittings &
another accessories which are comply to clean room installation
requirement standard in accordance to the technical tpecification and
drawings, as described :-
To Collection Rp. -
To Collection Rp. -
DRAIN PIPES
T 25 mm diameter pipe PVC Class AW c/w insulation m
To Collection Rp. -
COLLECTIONS
Page 96.13 /1 -
Page 96.13 /2 -
Page 96.13 /3 -
Page 96.13 /4 -
Page 96.13 /5 -
Page 96.13 /6 -
Page 96.13 /7 -
SUMMARY
97.2 EARTHWORK -
97.3 CONCRETE -
97.4 MASONRY -
97.5 METALS -
97.9. FINISHES -
97.10 SPECIALITIES -
BILL NO. 97
CARRIED TO SUMMARY -
97.2.1 EARTHWORK
A To Footings m3
C To Tie Beam m3
D To Column m3
E To Footings m2
G To Tie Beam m2
H To Footings m2
I To Perimeter Slab m2
J To Tie Beam m2
K To Slab m2
L To Footings m2
N To Tie Beam m2
O To Column m2
To Collection Rp. -
97.2.4 OTHERS
Plastic sheet
A To Footings m2
B To Perimeter Slab m2
C To Tie Beam m2
To Collection Rp. -
COLLECTIONS
Page 97.2/1 -
Page 97.2/2 -
97.2 EARTHWORK
CARRIED TO SUMMARY AT END OF BILL NO. 97 Rp. -
97.3.1 FORMWORK
A To Footings m2 -
C To Tie Beam m2 -
D To Upper Slab m2 -
E To Beam m2 -
F To Column m2 -
G To Wall/Parapet m2 -
97.3.2 CONCRETE
In-Situ Concrete
H To Footings m3 -
K To Column m3 -
L To Wall/Parapet m3 -
Lean Concrete
M To Footings m2 -
To Collection Rp. -
Lean Concrete
B To Tie Beam m2 -
97.3.3 REINFORCEMENT
97.3.4 SUNDRIES
O Supply and install flexible joint filler 4x25 deep sawcut, dowel 16mm m -
(round bar) ctc 300, L=300mm one side coated with bitumen per darings
and specifications (SJ)
P Supply and install polystiren 5mm thick replace by flexible joint, dowel m -
16mm (round bar) ctc 300, L=300mm one side coated with bitumen per
darings and specifications (CJ)
To Collection Rp. -
COLLECTIONS
Page 97.3 /1 -
Page 97.3 /2 -
97.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 97 Rp. -
Supply and Install Autoclaved aerated concrete block wall with mortar;
including reinforced concrete bonding ties, anchorage, latching, stiffener
columns and lintels beams as required, all in accordancce with drawings
and specifications
A To Wall 150mm thick External Wall m2 -
97.4.2 PLASTERED
Plaster; Mortar instant trowelled smooth with and including cement coating
instant as described
97.4.3 CEILING
Supply and install calsium silicate board 6mm glued in gypsum ceiling
including ceiling suspension system and fixing accessories all in accordance
with drawings and specifications
D To Ceiling m2 -
97.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 97 Rp. -
B R2, WF200x100x5.5x8-R kg -
C SP1A, SP48.6x1.5 kg -
D TR2, Dia12-TR kg -
E SB3, WF300x150 kg -
F All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
97.5 METALS
Supply and install aluminium composite panel fire retardant core including
steel support, aluminium support, hollow support, framing, sealant, other
jointing system, and all fixing accessories as drawings and specifications
Supply and Install metal roof Klip Lok Optima 0.45 BMT finish fixed to
steel purlin including flashing, sealant, and all fixing accessories; all in
accordance with drawings and specifications
A To Canopy m2 -
Supply and Install down pipe complete with overflow, steel clamp, support,
fitting, bracket, steel unp, and all fixing accessories; all in accordance with
drawings and specifications
D To Roof m2 -
E To Roof m2 -
97.7.3 SUNDRIES
97.8.1 DOORS
Supply and install steel doors including frames, hardwares, treshold, steel
plate, and all necessary accessories and fixing supports as drawings and
specifications
Supply and install alumnium door including vision panel / louvre, frames,
hardwares, treshold, steel plate, and all fixing accessories and supports as
drawings and specifications
Supply and install glass door including frames, hardwares, treshold, steel
plate, and all fixing accessories and supports as drawings and specifications
97.8.2 WINDOWS
P 97.WB.001 nos -
Q 97.WB.002 nos -
R 97.WB.003 nos -
To Collection Rp. -
Supply and install curtain wall system complete with hardwares, and all
necessary components, fixing, accessories as drawing and specification
A 97.SV.005 nos -
B 97.SW.002 nos -
C 97.SW.003 nos -
D 97.SX.004 nos -
E 97.SY.006 nos -
F 97.SW.001 nos -
To Collection Rp. -
COLLECTIONS
Page 97.8 /1 -
Page 97.8 /2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
B To External Corridor m2 -
C To Skirting m2 -
Supply and install Homogenous Tile complete with screed, gape grouting
and all in accordance with manufactured instruction applied: all in
accordance with drawings and specifications
D To Toilet m2 -
H To Exposed Concrete m2 -
I To Ceiling m2 -
97.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 97 Rp. -
R FU06 nos -
97.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 97 Rp. -
PIPEWORKS
To Collection Rp. -
PIPEWORKS (VENTING)
FITTINGS
I Portable fire extinguisher with capacity 4.5 kg chemical powder ABC type. no
To Collection Rp. -
COLLECTION
Page 97.11 /1 -
Page 97.11 /2 -
A 97DB01 no
D Recessed mounted TLED 40W, 220V, 3709 lm, c/w nicad battery duration 1 no
hour
G Waterproof LED 20W, 220V, IP65, 2000 lm, L600, c/w nicad battery duration 1 no
hour
I Downlight 16W, 220V, minimum 1200 lm, c/w nicad battery duration 1 hour no
K Surface downlight 16W, 220V, minimum 1200 lm, c/w nicad battery duration 1 no
hour
Supply and Install the following switches including provision of steel/metal box
and all accessories accordance with the technical specification and drawings, as
described :-
To Collection Rp. -
A Cabling point from local panel (500V/CU/PVC 3C x 2.5 mm² shall be UV & no
chemical resistance) run-in and with PVC high impact conduit) to; lighting and
switch
POWER OUTLET
Supply and Install the following power outlet including provision of steel/metal
box and all accessories accordance with the Technical Specification and
drawings, as described :-
C General socket outlet hand dryer, wall mounted, 16A, 250V, (waterproof) single no
gang
Electrical
D Cable tray 300x100mm m
Electronic
E Cable tray 200x100mm m
F Earth pit, Conductor clamp and rod electrode, dia 19mm x 3000 length no
To Collection Rp. -
A JBFA-97-01 no
Supply and Install the following Fire Alarm cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
J Cable FRC 2Cx1,5 mm2; for horn & strobe light point no
Supply and Install the following Public Address cables in final sub-circuit to
termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
Supply and Install the following Data and Telephone cables in final sub-circuit
to termination, run-in and with steel conduit 20mm dia; including earthing system
and all necessary accessories in accordance to the technical spesification as
shown on drawing, as described : -
To Collection Rp. -
COLLECTIONS
Page 97.12 /1 -
Page 97.12 /2 -
Page 97.12 /3 -
Page 97.12 /4 -
97.13.1 EQUIPMENT
DX UNIT
FAN
C Exhaust Fan EF-97.00.01, axial wall mounted type, cap 627 CMH, static no
pressure 93 pa, 0.37kW, 220V/1Ph/50Hz
D Exhaust Fan EF-97.00.02, axial wall mounted type, cap 249-400 CMH, static no
pressure 20 pa, 0.37kW, 220V/1Ph/50Hz
E Exhaust Fan EF-97.00.03, axial wall mounted type, cap 261-400 CMH, static no
pressure 20 pa, 0.37kW, 220V/1Ph/50Hz
F Exhaust Fan EF-97.00.04, axial wall mounted type, cap 261-400 CMH, static no
pressure 20 pa, 0.37kW, 220V/1Ph/50Hz
97.13.2 DUCTWORK
With external insulation (closed cell elastomeric fire retardant type class 0,
FM Approved, 25mm thickness + AL sheet Jacketing 0.4mm thckness)
To Collection Rp. -
Supply and Install Diffuser, Grilles and Volume Damper complete with air
equalising deflector blades, plenum box (if any) and all necessary
accessories including fixing, frame and connecting to ductwork in
accordance with the technical specification and drawings, as described :-
DRAIN PIPES
To Collection Rp. -
COLLECTIONS
Page 97.13 /1 -
Page 97.13 /2 -
SUMMARY
99.2 EARTHWORK -
99.3 CONCRETE -
99.5 METALS -
BILL NO. 99
CARRIED TO SUMMARY -
99.2.2 EARTHWORK
B To Pile Caps m3
C To Tie Beam m3
D To Pedestal m3
E To Pile Caps m2
F To Tie Beam m2
G To Pile Caps m2
H To Tie Beam m2
I To Pile Caps m2
J To Tie Beam m2
K To Pedestal m2
99.2.5 OTHERS
Plastic sheet
L To Pile Caps m2
M To Tie Beam m2
99.2 EARTHWORK
99.3.1 FORMWORK
A To Pile Caps m2 -
B To Tie Beam m2 -
C To Pedestal m2 -
99.3.2 CONCRETE
In-Situ Concrete
D To Pile Caps m3 -
E To Tie Beam m3 -
F To Pedestal m3 -
Lean Concrete
G To Pile Caps m2 -
H To Tie Beam m2 -
99.3.3 REINFORCEMENT
To Collection Rp. -
To Collection Rp. -
COLLECTIONS
Page 96.3 /1 -
Page 96.3 /2 -
99.3 CONCRETE
CARRIED TO SUMMARY AT END OF BILL NO. 99 Rp. -
99.4 MASONRY
CARRIED TO SUMMARY AT END OF BILL NO. 99 Rp. N/A
B SC4, WF200x200x8x12 kg -
C SC6, WF250x250x9x14 kg -
D SC8, WF300x300x10x15 kg -
E SC19, UNP150x75x6.5x10 kg -
F SC20A, UNP180x75x7x10.5 kg -
G SC21, UNP200x80x7.5x11 kg -
H HB2, L50x50x0x5 kg -
I HB3, L75x75x0x6 kg -
J HB4A, L90x90x0x7 kg -
K HB5, L100x100x0x7 kg -
L SB3, WF250x125x6x9-SB kg -
M SB11, UNP125x65x6x8 kg -
N SB12A, UNP180x75-SB kg -
O SB13, UNP200x80x7.5x11 kg -
P SB16, L50x50x0x6 kg -
Q SG2, WF200x100x5.5x8 kg -
R SG3, WF250x125x6x9 kg -
S SG4, WF300x150x6.5x9 kg -
T SG5, WF350x175x7x11 kg -
U SG6, WF400x200x8x13 kg -
V SG13, UNP200x80x7.5x11 kg -
W VB2, L50x50x0x5 kg -
X VB3, L75x75x0x6 kg -
To Collection Rp. -
B All connecting plates, brackets, cleats, bolts, anchor bolts and stiffeners, Ls -
welding, including sandblasting and painted finish and all necessary
fixing accessories as described
To Collection Rp. -
COLLECTIONS
Page 99.5 / 1 -
Page 99.5 / 1 -
99.5 METALS
99.9. FINISHES
CARRIED TO SUMMARY AT END OF BILL NO. 99 Rp. N/A
99.10 SPECIALITIES
CARRIED TO SUMMARY AT END OF BILL NO. 99 Rp. N/A