Professional Documents
Culture Documents
SS-RD 3604
LV SWITCHGEAR
1. VISUAL INSPECTION
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 2 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 3 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
Make AL HAMAD
Rated Voltage 440 V
Normal Current rating of load 2700 A
Normal Current rating of Bus bar 2700 A
Rated short circuit current 50 KA
Frequency 50 Hz
Year of manufacturing 10/2020
Serial No. LVAC-124/20/003
2. Functional Checks:
SI No. DESCRIPTION REMARKS
1 Manual close/open operation of the Incomer OK
1 Voltmeter function OK
3 Ammeter function OK
4 Control wiring checks OK
5 Indication lamps OK
6 Panel heater function OK
7 Bus bar tightness OK
8 Earthing of panel OK
9 Fuse rating verification OK
10 Phase Sequence Check OK
11 Continuity Test OK
Remarks:-
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 4 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
Remarks:-
Normal Current
2700 A Rated Volts 440 V
rating of busbar
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 5 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 6 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
Description
Make HOBUT
Type CT211
Burden 10 VA
Class 0.5FS10
Ratio 2500/5 A
Serial No. 165898//1/210 165898/1/257 165898/1/200
Visual Checks:
Measured at CT Terminal in
Primary Amps Ammeter Display in Amps
CT Ratio
Phase Current
(A)
Injected (A) R Y B
R Y B
R- PHASE 500 2500/5 1.0 -- -- 500 -- --
Y- PHASE 500 2500/5 -- 1.0 -- -- 500 --
B- PHASE 500 2500/5 -- -- 1.0 -- -- 500
Description
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 7 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
Make HOBUT
Type CT211
Burden 10 VA
Class 0.5FS10
Ratio 2500/5 A
Serial No. 165898//1/231 165898/1/163 165898/1/223
Visual Checks:
Measured at CT Terminal in
Primary Amps Ammeter Display in Amps
CT Ratio
Phase Current
(A)
Injected (A) R Y B
R Y B
R- PHASE 500 2500/5 1.0 -- -- 500 -- --
Y- PHASE 500 2500/5 -- 1.0 -- -- 500 --
B- PHASE 500 2500/5 -- -- 1.0 -- -- 500
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 8 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 9 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 10 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
LV DB FUNCTIONAL CHECK
SIGNATURE
DATE 18.11.2021
PROJECT RIYADH CITY SOUTH EQUIPMENT LV PANEL
EMPLOYER ALDAR DATE 18.11.2021
PMC KBR SUBSTATION RD 3604
CONSULTANT ARCADIS
PAGE Page 11 of 11
CONTRACTOR NATIONAL PROJECTS & CONSTRUCTION
SITE ACCEPTANCE TEST REPORT FOR LV PANEL
CHECKED
SINO TYPE OF OPERATION
OK NOT OK
1 Wiring Tightness ✔
ON ✔
2 LV Incomer-1
OFF ✔
ON ✔
3 LV Incomer-2
OFF ✔
ON ✔
4 Bus Coupler
OFF ✔
415 V,3 Phase,50Hz AC supply is applied to LVDB Incomer
5
1 and indications ✔
SIGNATURE
DATE 18.11.2021