Professional Documents
Culture Documents
10
April 2018
Quality Information
Quality Information
Quality Control
Addresses
Send to:
Name Company Send on:
Copy to:
Name Company Send on :
Daftar Isi
Daftar Isi........................................................................................................................ ii
Daftar Tabel..................................................................................................................iv
Daftar Gambar...............................................................................................................v
Daftar Foto...................................................................................................................vi
1. PENDAHULUAN................................................................................................1
1.1 Latar Belakang................................................................................................................1
1.2 Pengenalan SIMURP.......................................................................................................2
1.3 Proses Perencanaan.........................................................................................................3
1.4 Ruang Lingkup Laporan..................................................................................................3
1.5 Kesimpulan Sistem Planning...........................................................................................4
Foto 7 Bendung Siliwangi dilihat dari hilir kiri, kondisi rusak pada lantai dan tembok sayap..........17
Foto 8 Bendung Siliwangi dilihat dari hulu kanan, kondisi rusak pada lantai dan tembok sayap.....17
BWS
BANGDA Directorate General of Regional Development
BAPPEDA Provincial/District Planning and Development Agency
BAPPENAS National Planning and Development Agency
B/BWS Balai Besar Wilayah Sungai (River Basin Management Organisation)
BUPATI Head of District/Kabupaten
IC Irrigation Commission
GP3A Gabungan Perkumpulan Petani Pemakai Air (Federation of Water User’s Organisation)
GOI Government of Indonesia
Program SIMURP ini merupakan bagian dari Rencana Pembangunan Jangka Menengah
Pemerintah (RPJMN 2015-2019) untuk mempromosikan: (i) rehabilitasi 3 juta ha lahan
beririgasi; (ii) pengembangan 1 juta ha sistem irigasi baru; (iii) adopsi pendekatan
berkelanjutan untuk bertani di daerah dataran tinggi yang direhabilitasi; (iv) pengembangan
jalan pertanian; (v) peningkatan adopsi teknologi ramah lingkungan untuk tanaman pangan;
dan, (vi) pengembangan 65 bendungan dan waduk baru. Memenuhi target ini dan
mewujudkan kontribusi sektor irigasi dan rawa untuk penanggulangan kemiskinan akan
membutuhkan pendekatan ganda yang difokuskan pada rehabilitasi infrastruktur yang ada
dan peningkatan produktivitas dan efisiensi melalui modernisasi irigasi dan peningkatan
rawa. Untuk memenuhi target ini, Rencana Sektor untuk Sumber Daya Air dari tahun 2015
hingga 2019 membutuhkan investasi keseluruhan sebesar US $ 24,68 miliar secara
nasional.
Dukungan yang akan diberikan di bawah Perhatian REK ini pada dasarnya mendukung
Direktorat Irigasi dan Dataran Rendah untuk a) persiapan untuk Penaksiran/Perumusan
proyek SIMURP baru dan b) persiapan Rancangan Rekayasa Terinci termasuk dokumen
tender untuk primer dan sekunder sistem di area seluas sekitar 34.000 ha dan untuk sistem
tersier di 20% dari area ini, untuk implementasi pada tahun pertama proyek baru, keduanya
akan selesai sebelum 31 Mei 2018.
Pekerjaan SID jaringan irigasi secara partisipatif dibagi dalam empat (4) kegiatan pokok
sebagai berikut:
Pengumpulan data serta Laporan yang ada, yang menunjang untuk penyusunan desain
rehabilitasi, termasuk gambar purnalaksana dan Profil Sosio Ekonomi Teknik dan
Kelembagaan (PSETK).
Tahap perencanaan perubahan pada sistem irigasi oleh Konsultan perencana, diikuti
dengan diskusi bersama P3A/GP3A, B/BWS, Dinas SDA/Pengairan Propinsi/ Kabupaten
dan pembuatan laporan ‘System Planning’ (termasuk daftar usulan pekerjaan konstruksi
hasil penelusuran bersama).
Pembuatan desain rinci oleh Konsultan perencana, didahului dengan draft desain yang
sudah disepakati oleh B/BWS, Dinas SDA/Pengairan Propinsi/Kabupaten. Penyusunan
Rencana Anggaran Biaya (RAB) dan Daftar Kuantitas (BoQ), dan didiskusikan dengan
P3A/GP3A untuk menyusun daftar pekerjaan yang dapat dilaksanakan oleh P3A/GP3A
(RAB untuk jaringan tersier harus dipisahkan dengan RAB untuk jaringan
primer/sekunder). Penyusunan Dokumen Lelang untuk pekerjaan fisik yang akan
dilaksanakan.
Laporan ini menjelaskan hasil desain yang telah dilaksanakan oleh Konsultan setelah
menampung dan menganalisa semua masukan-masukan yang diperoleh dalam kegiatan
“Walkthrough” dengan P3A/GP3A, Juru Pengairan, Petugas-petugas O&P dan juga
pembahasan-pembahasan yang dilaksanakan baik tahap sosialisasi, Pertemuan Konsultasi
Masyarakat maupun Diskusi System Planning yang melibatkan unsure-unsur terkait di
Pemerintahan (BBWS Cimanuk Cisanggarung, Kabupaten Kuningan, Kabupaten Cirebon,
UPT PSDA Cikeusik dan penerima manfaat irigasi. Dalam proses desain, beberapa
pertemuan sudah dilakukan sebagai berikut:
LUAS LOKASI
NO BANGUNAN NAMA PETAK Panjang
EXISTING UPDATED DESA KECAMATAN
01. Saluran Induk Maneungteung Kepala 10,350.50
1 BM 1 M 1 Ka 23 23.00 Waled Desa Waled
2 BM 2' M 2' Ki 14 14.00 Waled Kota Waled
3 BM 2 Suplesi Ciberes
4 BM 3 M 3 Ka 76 8.00 Waled Kota Waled
5 BM 4 M 4 Ka 26 71.00 Waled Kota Waled
6 BM 4 M 4 Ki 50 21.00 Waled Kota Waled
7 BM 5 Bangunan Bagi
JUMLAH 189 137.00
02. Saluran Induk Maneungteung Timur : 4.289 ha 7,163.00
8 BMTr 1 MTr 1 Ka 2 2.00 Pabuaran Kidul Pabuaran
9 BMTr 2 MTr 2 Ki 45 45.00 Pabuaran Kidul Pabuaran
MTr 2 Ka 13 11.00 Pabuaran Kidul Pabuaran
10 BMTr 3 MTr 3 Ki 1 Leuweunggajah Ciledug Sek Tenjo Maya
11 BMTr 4 Bangunan Bagi
12 BMTr 5 MTr 5 Ki 26 17.00 Bojongnegara Ciledug
MTr 5 Ka 26 7.00 Bojongnegara Ciledug
13 BMTr 6 MTr 6 Ka 2 - Bojongnegara Ciledug
14 BMTr 7 MTr 7 Ka 70 68.00 Babakan Losari Ciledug
JUMLAH 184 150.00
03. Saluran Induk Maneungteung Barat : 2.094 ha 8,047.00
15 BMb 1 Mb 1 Ki 9 - Pabuaran Lor Pabuaran Tidak Difungsikan
16 BMb 2 Mb 2 Ki 52 65.00 Pabuaran Lor Pabuaran
Mb 2 Ka 98 78.00 Pabuaran Lor Pabuaran
17 BMb 3 Mb 3 Ki 78 92.00 Pabuaran Lor Pabuaran
Mb 3 Ka 1 63 65.00 Pabuaran Lor Pabuaran
Mb 3 Ka 2 77 70.00 Pabuaran Lor Pabuaran
18 BMb 4 Mb 4 Ki 48 48.00 Babakangebang Babakan
19 BMb 5 Mb 5 Ki 43 53.00 Babakangebang Babakan
Mb 5 Ka 10 10.00 Babakangebang Babakan
20 BMb 6 Mb 6 Ki 45 48.00 Babakan Babakan
Mb 6 Ka - -
Mb 6 Ka 1 Babakan Babakan Sek Karangwangun
Mb 6 Ka 2 Babakan Babakan Sek Karangmulya
21 BMb 7 Mb 7 Ki 10 - Karangwangun Babakan
22 BMb 8 Mb 8 Ki 1 32 26.00 Karangwangun Babakan
Mb 8 Ki 2 Karangwangun Babakan Sek Kali Mekar
Mb 8 Ki 3 53 52.00 Karangwangun Babakan
Mb 8 Ka 90 33.00 Karangwangun Babakan
23 BMb 9 Mb 9 Ki 1 24 23.00 Karangwangun Babakan
Mb 9 KI 2 38 38.00 Karangwangun Babakan
24 BMb 10 Mb 10 Ki 32 18.00 Gebang Gebang
Mb 10 Ka 5 58.00 Gebang Gebang
25 BMb 11 Mb 11 Ki 68 - Gebang Gebang
26 BMb 12 Mb 12 Ka 67 45.00 Gebang Gebang
JUMLAH 942 822.00
- Bendung Utama : 1 bh
- Bangunan Bagi : 2 bh
- Bangunan Bagi Sadap : 11 bh
- Bangunan Sadap dan Sadap Akhir : 74 bh
- Alat Ukur Parshal Flume : 1 bh
- Alat Ukur Cipoletty : 21 bh
- Alat Ukur Romijn : 26 bh
Tembok u/s
Bendung Daratan yg tergerus
Perkiraan alur
sungai lama
Bendung Siliwangi dibangun di Saluran Pembuang Utama Ciberu untuk memenuhi (suplesi)
kebutuhan air persawahan didaerah Sekunder Pabedilan dan Sekunder
Astanalanggar
Foto 7 Bendung Siliwangi dilihat dari hilir kiri, kondisi rusak pada lantai dan tembok sayap
Foto 8 Bendung Siliwangi dilihat dari hulu kanan, kondisi rusak pada lantai dan tembok sayap
Bendung Bacin dibangun di Saluran Pembuang Kali Bacin untuk memenuhi (suplesi) kebutuhan
air persawahan didaerah Saluran Induk Maneungteung Barat Ruas 7.
Bendung Prigi dibangun di Saluran Pembuang Prigi untuk memenuhi (suplesi) kebutuhan air
persawahan didaerah Sekunder Tersana
Bendung Prigi yang ada dibangun oleh swadaya masyarakat dengan kondisi rusak parah. Dilihat
dari kondisi topographi maka pada lokasi ini bendung perlu dibangun dengan ketinggian
3 m, yang mengakibatkan terjadinya genangan sepanjang 2 km dan mengenai daerah
pemukiman. Bendung pada lokasi ini tidak layak dibangun.
(km …. - …...)
I. SALURAN INDUK MANEUNGTEUNG KEPALA
1. Ruas-1 0.000 - 7.486 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 7.486 - 8.345 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 8.345 - 8.993 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 8.993 - 9.087 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
5. Ruas-5 9.087 - 10.351 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
II. SALURAN INDUK MANEUNGTEUNG TIMUR
1. Ruas-1 0.000 - 0.504 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 0.504 - 0.614 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 0.614 - 1.721 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 1.721 - 1.989 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
5. Ruas-5 1.989 - 6.138 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
6. Ruas-6 6.138 - 6.889 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
7. Ruas-7 6.889 - 7.163 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
III. SALURAN INDUK MANEUNGTEUNG BARAT
1. Ruas-1 0.000 - 0.558 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 0.558 - 0.893 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 0.893 - 1.898 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 1.898 - 3.351 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
5. Ruas-5 3.351 - 4.236 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
6. Ruas-6 4.236 - 4.932 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
7. Ruas-7 4.932 - 5.564 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
8. Ruas-8 5.564 - 6.136 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
9. Ruas-9 6.136 - 7.299 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
10. Ruas-10 7.299 - 7.869 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
11. Ruas-11 7.869 - 7.918 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
12. Ruas-12 7.918 - 8.048 RS KB Banyak sedimentasi, sampah, dinding pasangan rusak
Catatan ;
RS = Rusang Sedang
KB = Kurang berfungsi dalam arti tidak mampu mengalirkan air sesuai debit rencana karena
banyaknya sedimen dan sampah.
Kondisi saluran pembawa sekunder DI. Cikeusik secara umum sama dengan kondisi
saluran induk dimana mengalami pendangkalan (sedimentasi), banyaknya sampah
masyarakat serta dinding saluran baik dari pasangan batu kali maupun beton yang
mengalami kerusakan.
Kondisi senderan baik pada bagian kiri dan kanan saluran banyak yang rusak,
sementara pada bagian dasar saluran merupakan saluran tanah (tanpa
pasangan/struktur).
Saluran
(km …. - …...)
I. SALURAN SEKUNDER ROTI
1. Ruas-1 0.000 - 0.877 B B
2. Ruas-2 0.877 - 1.765 B B
II. SALURAN SEKUNDER SURAKATIGA
1. Ruas-1 0.000 - 0.886 B B
2. Ruas-2 0.886 - 1.738 B B
III. SALURAN SEKUNDER SUMBER
1. Ruas-1 0.000 - 0.212 B B
2. Ruas-2 0.212 - 0.477 RR B Banyak sedimentasi, dinding pasangan rusak
3. Ruas-3 0.477 - 0.758 RR B Banyak sedimentasi, dinding pasangan rusak
4. Ruas-4 0.758 - 1.391 RR B Banyak sedimentasi, dinding pasangan rusak
IV. SALURAN SEKUNDER GROGOL
1. Ruas-1 0.000 - 0.827 RR B Banyak sedimentasi, dinding pasangan rusak
2. Ruas-2 0.827 - 1.556 RR B Banyak sedimentasi, dinding pasangan rusak
V. SALURAN SEKUNDER BLAGEDOG
1. Ruas-1 0.000 - 0.990 RR B Banyak sedimentasi, dinding pasangan rusak
2. Ruas-2 0.990 - 1.548 RR B Banyak sedimentasi, dinding pasangan rusak, banyak bocor
VI. SALURAN SEKUNDER PLAYANGAN
1. Ruas-1 0.000 - 0.753 B B Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 0.753 - 1.194 RR B Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 1.194 - 1.810 RR B Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 1.810 - 2.100 RR B Banyak sedimentasi, sampah, dinding pasangan rusak
Banyak sedimentasi, sampah, dinding pasangan rusak,
5. Ruas-5 2.100 - 2.970 RS KB
areal ujung beralih fungsi
VII. SALURAN SEKUNDER JATISEENG
1. Ruas-1 0.000 - 0.266 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 0.266 - 0.505 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 0.505 - 0.795 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 0.795 - 1.647 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
5. Ruas-5 1.647 - 1.685 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
6. Ruas-6 1.685 - 2.325 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
7. Ruas-7 2.325 - 2.854 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
VIII. SALURAN SEKUNDER GENGGONG
1. Ruas-1 0.000 - 1.229 RS KB Banyak sedimentasi, dinding pasangan rusak
IX. SALURAN SEKUNDER PABEDILAN
1. Ruas-1 0.000 - 0.452 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 0.452 - 2.050 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 2.050 - 3.219 RR KB Banyak sedimentasi, dinding pasangan rusak
4. Ruas-4 3.219 - 4.416 RR KB Banyak sedimentasi, dinding pasangan rusak
5. Ruas-5 4.416 - 5.137 RR KB Banyak sedimentasi, dinding pasangan rusak
6. Ruas-6 5.137 - 5.960 RR KB Banyak sedimentasi, dinding pasangan rusak
7. Ruas-7 5.960 - 6.446 RR KB Banyak sedimentasi, dinding pasangan rusak
8. Ruas-8 6.446 - 6.820 RR KB Banyak sedimentasi, dinding pasangan rusak
9. Ruas-9 6.820 - 7.596 RR KB Banyak sedimentasi, dinding pasangan rusak
Saluran
Saluran Kode
(km …. - …...)
X. SALURAN SEKUNDER TERSANA
Banyak sedimentasi, dinding pasangan rusak, banyak
1. Ruas-1 0.000 - 1.183 RS KB
bocoran
XI. SALURAN SEKUNDER KEBON AGUNG
Banyak sedimentasi, dinding pasangan rusak, banyak
1. Ruas-1 0.000 - 1.081 B B
bocoran
XII. SALURAN SEKUNDER LOSARI
1. Ruas-1 0.000 - 1.358 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
2. Ruas-2 1.358 - 2.055 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
3. Ruas-3 2.055 - 3.340 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
4. Ruas-4 3.340 - 3.682 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
5. Ruas-5 3.682 - 4.289 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
6. Ruas-6 4.289 - 5.067 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
7. Ruas-7 5.067 - 5.942 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
8. Ruas-8 5.942 - 6.554 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
9. Ruas-9 6.554 - 8.139 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
10. Ruas-10 8.139 - 9.038 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
11. Ruas-11 9.038 - 9.423 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
12. Ruas-12 9.423 - 10.555 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
13. Ruas-13 10.555 - 11.187 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
14. Ruas-14 11.187 - 11.642 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
15. Ruas-15 11.642 - 12.173 RR KB Banyak sedimentasi, sampah, dinding pasangan rusak
Banyak sedimentasi, sampah, dinding pasangan rusak,
16. Ruas-16 12.173 - 12.673 RR KB
areal ujung beralih fungsi
XIII. SALURAN SEKUNDER ASTANALANGGAR
1. Ruas-1 0.000 - 0.821 B B
2. Ruas-2 0.821 - 1.327 B B
3. Ruas-3 1.327 - 1.792 B B
XIV. SALURAN SEKUNDER PANGGANG
1. Ruas-1 0.000 - 800.000 B B
XV. SALURAN SEKUNDER TAWANGSARI
1. Ruas-1 0.000 - 1.074 RS KB Banyak sedimentasi, dinding pasangan rusak
2. Ruas-2 1.074 - 1.531 RS KB Banyak sedimentasi, dinding pasangan rusak
3. Ruas-3 1.531 - 2.025 RS KB Banyak sedimentasi, dinding pasangan rusak
4. Ruas-4 2.025 - 2.199 RS TB Banyak sedimentasi, dinding pasangan rusak
5. Ruas-5 2.199 - 3.456 RS TB Banyak sedimentasi, dinding pasangan rusak
6. Ruas-6 3.456 - 4.526 RS TB Banyak sedimentasi, dinding pasangan rusak
Untuk perhitungan rencana anggaran biaya pekerjaan maka diperlukan cukup banyak data,
antara lain yaitu :
1. Harga dasar untuk Upah Pekerja, Harga Bahan dan Rate Alat Berat
2. Analisa Harga Satuan
3. Daftar Kuantitas dan Harga
Untuk penyiapannya digunakan beberapa referensi yang relevan sehingga hasil estimasi
diharapkan dapat dipertanggung jawabkan dan perhitungan detail dapat dilihat
dalam Laporan Penunjang untuk Rencana Anggaran Biaya, BOQ
Biaya dasar konstruksi diperhitungkan berdasarkan data dan dari berbagai sumber
diantaranya adalah :
1. Daftar harga satuan bahan bangunan dan upah kerja di Propinsi Jawa Barat,
Kabupaten Cirebon (Th. 2017)
2. Harga pasar di kota Cirebon dan Kabupaten Cirebon
3. Koefisien harga satuan pelaksanaan Balai Besar Wilayah Sungai Cimanuk-
Cisanggarung
4. Proyek-proyek yang sedah dan sedang berjalan.
c. Estándar Satuan Harga yang dikeluarkan oleh Pemerintah Kabupaten Cirebon TA 2018.
Secara umum analisa harga satuan pekerjaan untuk pekerjaan-pekerjaan pengairan atau
pekerjaan sipil didasarkan kepada hasil riset atau pengujian-pengujian (job mix atau
design mix) atau pendekatan empiris yang dapat dipertanggung jawabkan
sedangkan aplikasi untuk masing-masing lokasi akan disesuaikan dengan kondisi
lapangan / setempat yang dapat dipertanggung jawabkan dengan disertai alasan
serta bukti yang kuat.
Komponen dasar dalam analisa harga satuan pekerjaan terdiri atas tiga komponen utama
yaitu komponen upah pekerja, bahan serta peralatan dan perlengkapan. Kemudian
dalam setiap analisis pekerjaan juga diperhitungkan biaya-biaya lain yang
dikategorikan sebagai biaya overhead dan profit kontraktor dimana dalam ECE
umumnya dihitung sebanyak 10%.
Komponen tenaga kerja yang terklibat dalam setiap pekerjaan terdiri atas mandor, tukang
dan pekerja dan tenaga pendukung.
Tabel 4 Daftar Harga Standar Upah Pekerja Jasa Konstruksi
1 Pekerja 52.490,77
2. Tukang 65.613,46
4. Mandor 92.858,84
5. Mekanik 92.858,84
6. Operator 92.858,84
Komponen material yang disajikan dalam analisis harga satuan adalah material atau bahan
utama pembentuk dari fisik konstruksi yang dianalisis, sedangkan material minor
disarankan dimasukkan dalam komponen overhead. Harga satuan dasar
bahan/material selanjutnya di sajikan pada tabel berikut.
Tabel 5 Harga Satuan Bahan/Material
Komponen peralatan yang dipergunakan dalam setiap pekerjaan dalam penyajian analisis
harga satuan pekerjaan dipisahkan atas komponen peralatan utama / peralatan
berat atau peralatan dengan status sewa per jam atau per periode serta komponen
peralatan dan kelengkapan minor dimana dalam analisis hanya diuraikan nama
serta jenis peralatan yang digunakan sedangkan dalam perkiraan biayanya dapat
diperkirakan sebesar 0.5 – 1% dari total biaya, yaitu sesuai dengan kebutuhan.
Untuk menentukan harga sewa peralatan konstruksi maka digunakan sesuai
dengan SK Bupati Cirebon.
Harga SK Bupati
No Peralatan
Rp/Jam Cirebon
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
H.(RP.)
SATUAN (RP.)
JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
I BAHAN
II. TENAGA
1 Mandor hari 0.0017 91,859 152
II. TENAGA
2 Pekerja hari 0.0165 52,491 868
1 Mandor hari 0.0036 91,859 332
2 Pekerja hari 0.0362 52,491 1,899
III. ALAT
1 Excavator jam 0.0132 413,000 5,463
III. 2A Whell
L A T Loader jam 0.0453 314,000 14,214
1 Excavator + Breaker jam 0.0670 566,100 37,908
2 Whell Loader jam 0.0289 314,000 9,086
3 Dump Truck jam 0.0362 276,000 10,001
SUB TOTAL 20,697
IV. SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN 10% 59,226
2,070
IV.
V. BIAYA UMUM
JUMLAH DAN KEUNTUNGAN
HARGA 10% 5,923
22,766
V. JUMLAH HARGA 65,148
VI. HARGA SATUAN PEKERJAAN (Dibulatkan) 22,760
VI. HARGA SATUAN PEKERJAAN (Dibulatkan) 65,140
ANALISA HARGA
ANALISA HARGA SATUAN
SATUAN
UraianPekerjaan
Uraian Pekerjaan GALIANTANAH
: : GALIAN BATU PASIR & KERIKIL
MataPembayaran
Mata Pembayarandalam
dalamBOQ
BOQ ::
33
SatuanPembayaran
Satuan Pembayaran :: Rp 115,960
41,550 / /mm
H.H.SATUAN
SATUAN JUMLAH
JUMLAH
NO.
NO. UURRAAI IAANN SAT.
SAT. KUANTITAS
KUANTITAS
(RP.)
(RP.) (RP.)
(RP.)
II BAHAN
BAHAN
II.
II. TTEENNAAGGAA
11 Mandor
Mandor hari
hari 0.0032
0.0049 91,859
91,859 295
451
22 Pekerja
Pekerja hari
hari 0.0193
0.0490 52,491
52,491 1,013
2,574
III. ALAT
III. ALAT
1 Excavator jam 0.0257 413,000 10,622
1 Excavator + Breaker jam 0.1339 566,100 75,817
2 Whell Loader jam 0.0823 314,000 25,844
2 Whell Loader jam 0.0392 314,000 12,320
3 Dump Truck jam 0.0517 276,000 14,260
SUB TOTAL 37,774
IV. SUB TOTAL
BIAYA UMUM DAN KEUNTUNGAN 10% 105,421
3,777
V.
IV. JUMLAH HARGA
BIAYA UMUM DAN KEUNTUNGAN 10% 41,551
10,542
VI. HARGA SATUAN PEKERJAAN (Dibulatkan) 41,550
V. JUMLAH HARGA 115,963
VI. HARGA SATUAN PEKERJAAN (DIBULATKAN) 115,960
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. TENAGA
1 Mandor hari 0.0032 91,859 295
2 Pekerja hari 0.0321 52,491 1,686
3
III. A LAT
1 Bulldozer jam 0.0128 359,000 4,612
2 Vibroroller jam 0.0111 241,000 2,684
3 Water tank truck jam 0.0242 273,000 6,601
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. TENAGA
1 Mandor hari 0.0054 91,859 499
2 Pekerja hari 0.0407 52,491 2,137
III. A LAT
1 Bulldozer D65 jam 0.0109 479,133 5,202
2 Dumptruck jam 0.0409 276,000 11,301
3 Vibro Roller jam 0.0140 241,000 3,382
4 Mobil Tangki Air jam 0.0242 273,000 6,601
5 Excavator jam 0.0409 329,500 13,491
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 Tanah Timbunan m3 1.2000 39,426 47,311
II. TENAGA
1 Mandor hari 0.0054 91,859 499
2 Pekerja hari 0.0407 52,491 2,137
III. A LAT
1 Excavator jam 0.0120 413,000 4,957
2 Bulldozer D 65 jam 0.0109 479,133 5,202
3 Dump Truck jam 0.0444 276,000 12,267
4 Vibro Roller jam 0.0140 241,000 3,382
5 Water Tank Truck jam 0.0235 273,000 6,406
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 Tanah Timbunan m3 1.2000 39,426 47,311
II. TENAGA
1 Mandor hari 0.0054 91,859 499
2 Pekerja hari 0.0407 52,491 2,137
III. A LAT
1 Excavator jam 0.0120 413,000 4,957
2 Bulldozer D 65 jam 0.0109 479,133 5,202
3 Dump Truck jam 0.1154 276,000 31,859
4 Vibro Roller jam 0.0140 241,000 3,382
5 Water Tank Truck jam 0.0242 273,000 6,601
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 Bahan Timbunan m3 1.2000 39,426 47,311
II. TENAGA
1 Mandor hari 0.0144 91,859 1,318
2 Pekerja hari 0.0957 52,491 5,022
III. A LAT
1 Excavator jam 0.0622 413,000 25,671
2 Bulldozer D 65 jam 0.0191 479,133 9,169
3 Dump Truck jam 0.2503 276,000 69,085
4 Vibro Roller jam 0.0070 241,000 1,691
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. T EN AG A
1 Mandor hari 0.0034 91,859 308
2 Pekerja hari 0.0335 52,491 1,760
III. ALAT
1 Bulldozer D65 jam 0.0235 530,100 12,442
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. T EN AG A
1 Mandor hari 0.0015 91,859 142
2 Pekerja hari 0.0155 52,491 812
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.0437 276,000 12,068
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. TENAGA
1 Mandor hari 0.0015 91,859 142
2 Pekerja hari 0.0155 52,491 812
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.0931 276,000 25,698
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. TENAGA
1 Mandor hari 0.0015 91,859 142
2 Pekerja hari 0.0155 52,491 812
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.1425 276,000 39,327
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
II. TENAGA
1 Mandor hari 0.0015 91,859 142
2 Pekerja hari 0.0155 52,491 812
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.1919 276,000 52,957
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 Lempengan rumput m2 1.1000 8,000 8,800
II. TENAGA
1 Mandor hari 0.0063 91,859 574
2 Pekerja hari 0.0625 52,491 3,281
III. ALAT
1 Gerobak/Kereta dorong unit 0.0050 5,000 25
2 Alat bantu lain, bambu unit 1.0000 50 50
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
II. TE NAGA
1. Mandor hari 0.0750 91,859 6,889
2. Kepala Tukang hari 0.0750 78,736 5,905
3. Tukang hari 0.7500 65,613 49,210
4. Pekerja hari 1.5000 52,491 78,736
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1. Batu muka m2 1.10 250,000 275,000
2. Pasir pasangan m3 0.0320 133,500 4,272
3. Semen zak 0.1200 94,400 11,328
II. TENAGA
1. Mandor hari 0.0340 91,859 3,123
2. Kepala Tukang hari 0.0500 78,736 3,937
3. Tukang hari 0.3000 65,613 19,684
4. Pekerja hari 0.3750 52,491 19,684
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
II. TENAGA
1. Mandor hari 0.0100 91,859 919
2. Kepala Tukang hari 0.0150 78,736 1,181
3. Tukang hari 0.1500 65,613 9,842
4. Pekerja hari 0.2000 52,491 10,498
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
II. TENAGA
1. Mandor hari 0.0150 91,859 1,378
2. Kepala Tukang hari 0.0140 78,736 1,102
3. Tukang hari 0.1400 65,613 9,186
4. Pekerja hari 0.3000 52,491 15,747
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TE NAGA
1 Mandor hari 0.0600 91,859 5,512
2 Kepala Tukang hari 0.0200 78,736 1,575
3 Tukang hari 0.2000 65,613 13,123
4 Pekerja hari 1.2000 52,491 62,989
III. ALAT
1 Concrete Mixer jam 0.6667 70,000 46,667
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TE NAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
2 Tukang hari 0.2750 65,613 18,044
3 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.1481 846,600 125,422
2 Agitator Truck jam 0.1761 332,000 58,462
3 Concrete Pump jam 0.0667 192,263 12,818
4 Concrete Vybrator jam 0.1481 49,000 7,259
H. SATUAN JUMLAH
NO. U RAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
2 Tukang hari 0.2750 65,613 18,044
3 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.0889 846,600 75,253
2 Agitator Truck jam 0.1264 332,000 41,973
3 Concrete Pump jam 0.0667 192,263 12,818
4 Concrete Vybrator jam 0.0889 49,000 4,356
H. SATUAN JUMLAH
NO. U RAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
2 Tukang hari 0.2750 65,613 18,044
3 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.0889 846,600 75,253
2 Agitator Truck jam 0.1264 332,000 41,973
3 Concrete Pump jam 0.0667 192,263 12,818
4 Concrete Vybrator jam 0.0889 49,000 4,356
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
2 Tukang hari 0.2750 65,613 18,044
3 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.0889 846,600 75,253
2 Agitator Truck jam 0.1264 332,000 41,973
3 Concrete Pump jam 0.0667 192,263 12,818
4 Concrete Vybrator jam 0.0889 49,000 4,356
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.2750 65,613 18,044
3 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.0889 846,600 75,253
2 Agitator Truck jam 0.1414 332,000 46,942
3 Concrete Pump jam 0.0444 192,263 8,545
4 Concrete Vybrator jam 0.0889 49,000 4,356
II. TE NAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.2750 65,613 18,044
4 Pekerja hari 1.6500 52,491 86,610
III. AL AT
1 Batching Plan jam 0.0889 846,600 75,253
2 Agitator Truck jam 0.1414 332,000 46,942
3 Concrete Pump jam 0.0444 192,263 8,545
4 Concrete Vybrator jam 0.0889 49,000 4,356
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 Split m3 0.8000 374,550 299,640
2 Pasir beton m3 0.4000 135,000 54,000
3 Semen zak 9.0000 94,400 849,600
II. TE NAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.2750 65,613 18,044
4 Pekerja hari 1.6500 52,491 86,610
III. ALAT
1 Beton Molen jam 0.0889 846,600 75,253
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 11,779,219 11,779,219
2
3
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.1400 65,613 9,186
4 Pekerja hari 0.2800 52,491 14,697
III. ALAT
1 Crane/Excavator jam 0.1667 329,500 54,917
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 10,601,297 10,601,297
2
3
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.1400 65,613 9,186
4 Pekerja hari 0.2800 52,491 14,697
III. ALAT
1 Crane/Excavator jam 0.1538 329,500 50,692
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 8,795,150 8,795,150
2
3
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.1400 65,613 9,186
4 Pekerja hari 0.2800 52,491 14,697
III. ALAT
1 Crane/Excavator jam 0.1385 329,500 45,623
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 6,528,676 6,528,676
2
3
II. TENAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.1400 65,613 9,186
4 Pekerja hari 0.2800 52,491 14,697
III. ALAT
1 Crane/Excavator jam 0.1256 329,500 41,399
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 6,062,342 6,062,342
2
3
II. TE NAGA
1 Mandor hari 0.0830 91,859 7,624
2 Kepala Tukang hari 0.0280 78,736 2,205
3 Tukang hari 0.1400 65,613 9,186
4 Pekerja hari 0.2800 52,491 14,697
III. ALAT
1 Crane/Excavator jam 0.1231 329,500 40,554
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 3,794,560 3,794,560
2
3
II. TE NAGA
1 Mandor hari 0.0477 91,859 4,379
2 Kepala Tukang hari 0.0161 78,736 1,266
3 Tukang hari 0.0804 65,613 5,276
4 Pekerja hari 0.1608 52,491 8,441
III. ALAT
1 Crane/Excavator jam 0.0957 329,500 31,540
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 4,324,896 4,324,896
2
3
II. TENAGA
1 Mandor hari 0.0451 91,859 4,147
2 Kepala Tukang hari 0.0152 78,736 1,199
3 Tukang hari 0.0762 65,613 4,997
4 Pekerja hari 0.1523 52,491 7,995
III. ALAT
1 Crane/Excavator jam 0.0907 329,500 29,872
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 1,983,438 1,983,438
2
3
II. TENAGA
1 Mandor hari 0.0176 91,859 1,620
2 Kepala Tukang hari 0.0059 78,736 468
3 Tukang hari 0.0297 65,613 1,952
4 Pekerja hari 0.0595 52,491 3,123
III. ALAT
1 Crane/Excavator jam 0.0354 329,500 11,669
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 1,442,500 1,442,500
2
3
II. TE NAGA
1 Mandor hari 0.0149 91,859 1,371
2 Kepala Tukang hari 0.0050 78,736 396
3 Tukang hari 0.0252 65,613 1,652
4 Pekerja hari 0.0503 52,491 2,642
III. ALAT
1 Crane/Excavator jam 0.0300 329,500 9,873
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 1,418,000 1,418,000
2
3
II. TE NAGA
1 Mandor hari 0.0131 91,859 1,206
2 Kepala Tukang hari 0.0044 78,736 349
3 Tukang hari 0.0221 65,613 1,453
4 Pekerja hari 0.0443 52,491 2,324
III. ALAT
1 Crane/Excavator jam 0.0264 329,500 8,685
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(RP.) (RP.)
I BAHAN
1 U-Ditch Precast bh 1.0000 721,840 721,840
2
3
II. TENAGA
1 Mandor hari 0.0064 91,859 587
2 Kepala Tukang hari 0.0022 78,736 170
3 Tukang hari 0.0108 65,613 707
4 Pekerja hari 0.0216 52,491 1,131
III. ALAT
1 Crane/Excavator jam 0.0128 329,500 4,228
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0330 91,859 3,031
2 Kepala Tukang hari 0.0330 78,736 2,598
3 Tukang hari 0.3300 65,613 21,652
4 Pekerja hari 0.6600 52,491 34,644
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0260 91,859 2,388
2 Kepala Tukang hari 0.0260 78,736 2,047
3 Tukang hari 0.2600 65,613 17,059
4 Pekerja hari 0.5200 52,491 27,295
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Kayu klas 3 m3 0.0791 4,042,500 319,762
2 Paku kg 0.8000 23,400 18,720
II. TENAGA
1 Mandor hari 0.0025 91,859 230
2 Kepala Tukang hari 0.0100 78,736 787
3 Tukang hari 0.0500 78,736 3,937
4 Pekerja hari 0.2000 52,491 10,498
III. ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0004 91,859 37
2 Kepala Tukang hari 0.0007 78,736 55
3 Tukang hari 0.0070 78,736 551
4 Pekerja hari 0.0070 52,491 367
III. ALAT
: BRONJONG
:
Satuan Pembayaran : Rp 837,890 / m3
H. SATUAN JUMLAH
URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
BAHAN
1. Batu Kali m3 1.2000 320,210 384,252
2. Kawat Pabrikasi (2*1*0.5) dia 3 mm unit 1.0000 332,200 332,200
TENAGA
1. Mandor hari 0.0500 91,859 4,593
2. Kepala Tukang hari 0.1000 78,736 7,874
3. Tukang hari 0.1000 65,613 6,561
4. Pekerja hari 0.5000 52,491 26,245
ALAT
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1. Mandor hari 0.0050 91,859 459
2. Kepala Tukang hari 0.0080 78,736 630
3. Tukang hari 0.0800 65,613 5,249
4. Pekerja hari 0.1000 52,491 5,249
III. ALAT
1. Sewa Alat Las jam 0.0170 407,000 6,919
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Pipa PVC dia 2" btg 0.1250 31,000 3,875
2 Kerikil m3 0.0175 193,000 3,378
3 Ijuk kg 1.7500 7,500 13,125
II. TENAGA
1 Mandor hari 0.0040 91,859 367
2 Kepala Tukang hari 0.0100 78,736 787
3 Tukang hari 0.0200 65,613 1,312
4 Pekerja hari 0.0400 52,491 2,100
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0040 91,859 367
2 Kepala Tukang hari 0.0040 78,736 315
3 Tukang hari 0.0400 65,613 2,625
4 Pekerja hari 0.0800 52,491 4,199
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Peilshaal tinggi 5 m m 1.0000 1,000,000 1,000,000
II. TENAGA
1 Mandor hari 0.0240 91,859 2,205
2 Kepala Tukang hari 0.0240 78,736 1,890
3 Tukang hari 0.2400 65,613 15,747
4 Pekerja hari 0.4800 52,491 25,196
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SATUAN KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Material dan Karung m3 1.1000 20,000 22,000
II. TENAGA
1 Mandor hari 0.0500 91,859 4,593
2 Pekerja hari 0.2000 52,491 10,498
III. ALAT
1 Alat bantu Ls 1.0000 3,000 3,000
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Peilshaal tinggi 3 m m 1.0000 600,000 600,000
II. TENAGA
1 Mandor hari 0.0160 91,859 1,470
2 Kepala Tukang hari 0.0160 78,736 1,260
3 Tukang hari 0.1600 65,613 10,498
4 Pekerja hari 0.3200 52,491 16,797
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Peilshaal tinggi < 2 m m 1.0000 250,000 250,000
II. TENAGA
1 Mandor hari 0.0120 91,859 1,102
2 Kepala Tukang hari 0.0120 78,736 945
3 Tukang hari 0.1200 65,613 7,874
4 Pekerja hari 0.2400 52,491 12,598
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SATUAN KUANTITAS
(Rp.) (Rp.)
I BAHAN
1. Pasir Urug m3 0.0938 190,630 17,872
2. Batu Kali (5 ~ 10) cm m3 0.3750 320,210 120,079
3. Sirtu ( 1 ~ 2 ) cm m3 0.1875 190,630 35,743
II. TENAGA
1. Mandor hari 0.0086 91,859 794
2. Kepala Tukang hari 0.0173 78,736 1,361
3. Tukang hari 0.0346 65,613 2,269
4. Pekerja hari 0.0519 52,491 2,723
III. ALAT
1. Motor Grader jam 0.0346 369,000 12,761
2. Mobil Tanki Air jam 0.0455 273,000 12,425
3. Vibro Roller jam 0.1123 241,000 27,060
H. SATUAN JUMLAH
NO. URAIAN SATUAN KUANTITAS
(Rp.) (Rp.)
I BAHAN
1 Aspal panas kg 4.1064 14,100 57,901
2 Split 3/5 m3 0.0700 317,350 22,215
3 Split 2/3 m3 0.0205 317,350 6,516
4 Pasir Kasar m3 0.0070 190,630 1,334
II. TENAGA
1. Mandor hari 0.0182 91,859 1,670
2. Kepala Tukang hari 0.0364 78,736 2,863
3. Tukang hari 0.0727 65,613 4,772
4. Pekerja hari 0.2727 52,491 14,316
III. ALAT
1 Aspalt Sprayer jam 0.0263 76,000 2,001
2 Steel Whell Roller jam 0.0333 170,400 5,680
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
II. TENAGA
1 Mandor hari 0.0060 91,859 551
2 Kepala Tukang hari 0.0060 78,736 472
3 Tukang hari 0.0600 65,613 3,937
4 Pekerja hari 0.1200 52,491 6,299
III. ALAT
1
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
II. TENAGA
1. Mandor hari 0.1667 91,859 15,311
2. Kepala Tukang hari 0.1667 78,736 13,123
3. Tukang hari 0.3334 65,613 21,872
4. Pekerja hari 3.3335 52,491 174,978
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.0931 276,000 25,698
H. SATUAN JUMLAH
NO. URAIAN SAT. KUANTITAS
(Rp.) (Rp.)
I BAHAN
II. TENAGA
1. Mandor hari 0.3334 91,859 30,621
2. Kepala Tukang hari 0.3334 78,736 26,247
3. Tukang hari 0.6667 65,613 43,744
4. Pekerja hari 6.6670 52,491 349,956
III. ALAT
1 Whell Loader jam 0.0110 314,000 3,457
2 Bulldozer D3 jam 0.0124 359,000 4,445
3 Dump Truck jam 0.0931 276,000 25,698
a. Pekerjaan Persiapan
Pekerjaan ini pada umumnya adalah pekerjaan penunjang agar dapat melaksanakan
pekerjaan dengan baik, yaitu antara lain :
2. Pekerjaan Pengukuran
Pada dasarnya banyak kebutuhan dilapangan, namun ada aturan yang mengikat kita yang
perlu dicermati sehingga tidak semua dari pekerjaan tersebut dapat dicantumkan
dalam kategori pekerjaan umum seperti gambar karja ataupun gambar terbangun,
yang ditetapkan masuk sebagai biaya over head.
b. Pekerjaan Tanah
Pekerjaan tanah secara umum dalam konstruksi irigasi meliputi pekerjaan stripping, galian
tanah biasa, galian batu lapuk, dan galian batu keras, timbunan, timbunan kembali
(backfill).
Pelaksanaan pekerjaan tanah dibedakan atas pekerjaan tanah secara manual dan
pekerjaan tanah dengan menggunakan peralatan berat (mekanis). Untuk
Pelaksanaan pekerjaan secara manual didasarkan kepada analisis produktifitas dari
kelompok kerja tukang dan pekerja sehigga didapat volume tenaga kerja untuk
setiap satuan pekerjaan.
Dalam menghitung analisa pekerjaan tanah pada umumnya yang perlu ditetapkan adalah
manajemen tanahnya terlebih dahulu, yaitu hendak diatur bagaimana sehingga
pergerakan alat dapat dilaksanakan secara sistimatis. Pergerakan alat selalu
berulang antara satu kegiatan dengan kegiatan lainnya, dimana kegiatan tersebut
dapat dipelajari kecenderungannya.
Pekerjaan lain yaitu pekerjaan timbunan, yaitu timbunan dari galian, timbunan dari stock
pile dan timbunan dari borrow, semua pekerjaan ini memerlukan alat berat, yaitu
Truck Tangki Air dan Vibro Roller.
Analisa pekerjaan pasangan batu kali yang dibahas ini adalah pekerjaan
beton yang dilaksanakan dengan menggunakan molen (concrete mixer)
dengan kapasitas 250 ltr atau 350 ltr.
2) Pekerjaan Plesteran (1 PC : 3 Ps) dengan acian atau tanpa acian dan pointing
(Siaran)
Komponen utama bahan plesteran adalah semen porland cement dan pasir
dengan analisa kuantitas cement disarankan disajikan dalam satuan 50 kg per
sak agar memudahkan dalam control pelaksanaan pekerjaan.
Analisa pekerjaan beton yang dibahas ini adalah pekerjaan beton yang
dilaksanakan dengan mengunakan molen (concrete mixer) dengan kapasitas
250 ltr atau 350 ltr, sedangkan untuk produksi mortar dengan baching plan
tidak dibahas.
2) Pekerjaan Perancah
3) Pekerjaan Bekisting
4) Pekerjaan Pembesian
Referensi harga pintu-air per unit atau harga bahan pembentuk pintu air bisa didapat dari
survey pasar, harga terdahulu, bengkel yang kompeten, publikasi Bupati ybs,
maupun harga pekerjaan terdahulu. Komponen dasar konstruksi pintu secara umum
terdiri atas tiga pokok pekerjaan yaitu :
2) Pengangkutan
3) Pemasangan
Besarnya biaya untuk item-item pekerjaan tersebut diatas diestimasi sebagai biaya
lumpsump (LS) yang dihitung berdasarkan usulan rencana konstruksi dan taksiran
kuantitas pekerjaan.
a. Upah
Kerja
Upah kerja berdasarkan pada harga dasar upah buruh setempat. Sedangkan untuk
skill labor, tehnisi maupun operator dari daerah luar.
Upah pekerja ditentukan 8 jam sehari sesuai aturan yang ditetapkan oleh departemen
Tenaga Kerja.
b.
Material Konstruksi
Harga upah dan bahan diambil dari data sekunder berupa harga dasar (basic price), di
daerah lokasi proyek (Kab. Cirebon) dimana disajikan pada lampiran pada akhir
bab ini.
c Harga
Satuan
Harga satuan merupakan besarnya harga masing-masing pekerjaan. Pada analisis ini
dibutuhkan data harga satuan upah dan bahan serta analisis harga satuan
berdasarkan HSP di Kabupaten Cirebon.
Biaya tak langsung yang terdiri atas profit dan overhead sebesar 10 % dari biaya konstruksi.
Overhead dan profit untuk pelaksanaan proyek terdiri dari biaya administrasi umum
termasuk gaji, tunjangan personil, biaya kesejehteraan, biaya perjalanan dinas,
komunikasi, penyusutan, asuransi dan lain-lain. Pelaksanaan perhitungan biaya
overhead diambil secara langsung pada masing-masing item pekerjaan.
Biaya dasar pengantian terdiri dari biaya pembebasan lahan, biaya ganti rugi
perumahan/bangunan dan tanaman. Untuk rencana revitalisasi jaringan irigasi DI.
Cikeusik direncanakan tidak ada biaya penggantian pembebasan lahan.
a. Biaya Administrasi
Biaya tak terduga meliputi penggantian harga dikarenakan kondisi yang tak
sesuai karena kenaikan harga akibat inflasi. Besarnya biaya tak terduga karena
eskalasi harga diperhitungkan sebesar 2,5 % per tahun dari jumlah biaya dasar
konstruksi dan biaya dasar penggantian.
Biaya phisik tak terduga diperkirakan jika terjadi perubahan volume konstruksi
karena kondisi konstruksi dengan catatan mendapat persetujuan dari pemilik
proyek. Biaya ini diperhitungkan maksimum 5 % dari jumlah biaya konstruksi,
biaya kompensasi, biaya administrasi dan biaya tak terduga.
Dalam menghitung Rencana Anggaran Biaya, terlebih dahulu dihitung Volume pekerjaan (BOQ)
sebagai berikut :
N
NAMA SALURAN PANJANG PEKERJAAN TANAH SALURAN PASANGAN BATUKALI BONGKARAN
O
4 Saluran Sekunder Roti 1,451.63 83.05 - 103.35 18.95 264.17 2.13 72.10
5 Saluran Sekunder Surakatiga 1,784.95 409.93 75.22 439.61 114.19 1,522.87 9.58 444.34
6 Saluran Sekunder Jatiseeng 3,843.97 14,341.25 - 4,997.52 1,080.58 11,389.71 102.20 3,332.32
7 Saluran Sekunder Ganggong 1,241.10 11,627.10 - 1,083.52 335.11 1,675.54 30.07 836.68
12,639.1
8 Saluran Sekunder Losari 9 2,185.23 205.37 2,101.10 403.52 5,683.99 39.42 1,860.50
9 Saluran Sekunder Astanalanggar 3,025.64 1,886.37 367.70 1,801.15 540.08 3,365.27 35.22 622.88
10 Saluran Sekunder Tawangsari 5,872.64 5,305.29 2,727.88 3,847.78 1,312.16 12,473.70 75.62 1,158.21
11 Saluran Sekunder Tenjomaya 687,00 1,318.13 90.24 1,491.30 758.62 2,061.41 33.79 -
12 Saluran Sekunder Karangmulya 1027,24 5,742.31 - 1,206.46 308.34 918.85 12.20 -
13 Saluran Sekunder Karangwangun 877,90 1,134.96 21.61 570.64 263.37 913.02 11.70 -
14 Saluran Sekunder Karanganyar 1575,00 1,886.68 235.87 1,056.25 487.50 1,397.50 21.45 -
15 Saluran Sekunder Panggang 798.51 286.12 - 205.82 52.33 279.44 4.11 80.70
16 Saluran Sekunder Pabedilan 7,655.79 7,844.87 613.38 6,739.02 1,192.68 15,364.14 97.50 2,456.63
17 Saluran Sekunder Tersana 3,533.59 7,610.14 83.09 2,746.76 835.59 6,286.87 54.07 1,786.48
18 Saluran Sekunder Kebonagung 1,069.31 1,857.27 0.78 2,301.47 320.79 2,707.00 19.28 690.38
19 Saluran Sekunder Sumber 3,135.37 4,461.05 556.35 2,604.86 614.93 5,040.18 57.79 1,884.12
Improvement of Participatory Irrigation Management (IoPIM) 136
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) Budget Plan – Cikeusik Irrigation Scheme
N
NAMA SALURAN PANJANG PEKERJAAN TANAH SALURAN PASANGAN BATUKALI BONGKARAN
O
JUMLAH HARGA
NO PEKERJAAN
Rp
I. PEKERJAAN BENDUNG CIKEUSIK: -
II. PEKERJAAN PERSIAPAN 3,276,715,000
III. PEKERJAAN SALURAN INDUK : 19,974,826,696
1 PEKERJAAN KANTONGLUMPUR-BANGUNAN PENGURAS-BANGUNAN UKUR -
2 SALURAN INDUK MANEUNGTEUNG KEPALA 19,974,826,696
III. SALURAN INDUK MANEUNGTEUNG TIMUR 19,626,928,058
IV SALURAN INDUK MANEUNGTEUNG BARAT 9,897,393,495
V PEKERJAAN SALURAN SEKUNDER: 56,683,840,896
1 Saluran Sekunder Roti 260,402,479
2 Saluran Sekunder Surakatiga 819,898,628
3 Saluran Sekunder Jatiseeng 8,528,895,793
4 Saluran Sekunder Genggong 1,897,533,180
5 Saluran Sekunder Losari 3,920,832,980
6 Saluran Sekunder Astanalanggar 2,610,083,613
7 Saluran Sekunder Tawangsari 6,096,339,662
8 Saluran Sekunder Tenjomaya 1,846,426,860
9 Saluran Sekunder Karangmulya 1,605,331,093
10 Saluran Sekunder Karangwangun 835,865,263
11 Saluran Sekunder Karananyar 1,472,029,089
12 Saluran Sekunder Panggang 295,527,492
13 Saluran Sekunder Pabedilan 9,744,599,875
14 Saluran Sekunder Tersana 4,348,217,910
15 Saluran Sekunder Kebonagung 3,135,101,367
16 Saluran Sekunder Sumber 4,990,649,660
17 Saluran Sekunder Grogol 713,139,446
18 Saluran Sekunder Playangan 2,229,197,536
19 Saluran Sekunder Blagedog 1,333,768,972
VI. PEKERJAAN SALURAN SUPLESI: 2,895,863,655
1 Saluran Suplesi Ciberes
2 Saluran Suplesi Roti 2,895,863,655
3 Saluran Suplesi Surakatiga
VII PEKERJAAN BENDUNG SUPLESI: -
1 BENDUNG SUMBER MAKMUR/TERSANA -
2 BENDUNG SILIWANGI -
3 BENDUNG BACIN -
JUMLAH 112,355,567,800
PPN 10% 11,235,556,780
TOTAL 123,591,124,580
Jumlah D. 1 : 1,778,280,540
Jumlah D. 2 : 7,499,116,284
Jumlah D. 3 : 680,774,550
Jumlah E. 1 : 1,387,728,310
Jumlah E. 2 : 16,293,487,911
Jumlah F. 1 : 793,269,683
Jumlah F. 2 : 9,040,394,912
Jumlah G. 2 : 253,010,968
Jumlah 1 : 105,313,477
Jumlah 1 : 5,782,673
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER KEBONAGUNG
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 161
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) Budget Plan – Cikeusik Irrigation Scheme
HARGA SATUAN JUMLAH HARGA
NO PEKERJAAN SATUAN VOLUME
Rp Rp
Q PEKERJAAN JARINGAN IRIGASI SEKUNDER KEBONAGUNG
Q.1 PEKERJAAN TANAH
Q.1.1 Galian Tanah biasa m3 22,760 1,857.27 42,271,481
Q.1.3 Timbunan galian setempat m3 46,870 0.78 36,533
Q.1.4 Pembuangan sisa galian setempat m3 15,960 1,857.27 29,642,040
Jumlah 1 : 71,950,054
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER GENGGONG
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Jumlah J. 2 : 1,630,900,377
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER SUMBER
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER KARANGMULYA
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) HARGA SATUAN JUMLAH HARGA 164
NOand Irrigation Sector Management
Water Resources PEKERJAAN
Program-2 (WISMP-2) SATUAN
Budget Plan – Cikeusik VOLUME
Irrigation Scheme
Rp Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER KARANGMULYA
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 5,742 130,694,896
S.1.2 Timbunan hasil galian m3 17,460 - -
Jumlah 1 : 130,694,896
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER KARANGWANGUN
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 165
Water Resources
NOand Irrigation Sector ManagementPEKERJAAN
Program-2 (WISMP-2) Budget
SATUANPlan –HARGA SATUAN
Cikeusik IrrigationVOLUME
Scheme JUMLAH HARGA
Rp Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER KARANGWANGUN
S.1 PEKERJAAN TANAH
S.1.2 Timbunan hasil galian m3 17,460 1,135 19,816,410
S.1.3 Timbunan galian setempat m3 46,870 22 1,013,048
Jumlah 1 : 46,661,159
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER KARANGANYAR
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) HARGA SATUAN JUMLAH HARGA 166
NOand Irrigation Sector Management
Water Resources PEKERJAAN
Program-2 (WISMP-2) SATUAN
Budget Plan – Cikeusik VOLUME
Irrigation Scheme
Rp Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER KARANGANYAR
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 1,887 42,940,737
S.1.2 Timbunan hasil galian m3 17,460 1,887 32,941,356
Jumlah 1 : 86,937,275
ENGINEERING ESTIMATE
REVITALISASI SALURAN TENJOMAYA
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 167
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) HARGA
Budget SATUAN
Plan JUMLAH HARGA
– Cikeusik Irrigation Scheme
NO PEKERJAAN SATUAN VOLUME
Rp Rp
V PEKERJAAN SALURAN SUPLESI
V.1 PEKERJAAN TANAH
V.1.3 Timbunan galian setempat m3 46,875 90.24 4,230,162
Jumlah 1 : 34,230,763
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER JATISEENG
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 168
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) HARGA SATUAN
Budget Plan – Cikeusik Irrigation Scheme JUMLAH HARGA
NO PEKERJAAN SATUAN VOLUME
Rp Rp
I PEKERJAAN JARINGAN IRIGASI SEKUNDER JATISEENG
I.1 PEKERJAAN TANAH
I.1.2 Timbunan Galian tanah setempat m3 46,870 - -
I.1.3 Pembuangan sisa galian setempat 80% m3 15,960 11,473.00 183,109,114
I.1.4 Pembuangan sisa galian jarak angkut < 1 km 20% m3 23,010 2,868.25 65,998,445
Jumlah 2 : 7,875,258,225
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER BLAGEDOG
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER PABEDILAN
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) HARGA SATUAN JUMLAH HARGA 170
NOand Irrigation Sector Management
Water Resources PEKERJAAN
Program-2 (WISMP-2) SATUAN VOLUME
Budget Plan –RpCikeusik Irrigation Scheme Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER PABEDILAN
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 7,845 178,549,192
Jumlah 1 : 207,298,480
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER SURAKATIGA
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement ofNO
Participatory Irrigation Management (IoPIM)
PEKERJAAN
NOMOR
SATUAN
HARGA SATUAN
VOLUME
JUMLAH HARGA 171
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) ANALISA Budget Plan – Cikeusik
Rp Irrigation Scheme Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER SURAKATIGA
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 410 9,330,084
S.1.2 Timbunan hasil galian m3 17,460 - -
Jumlah 1 : 12,855,525
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER ASTANALANGGAR
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) HARGA SATUAN JUMLAH HARGA 172
NO PEKERJAAN SATUAN VOLUME
Water Resources and Irrigation Sector Management Program-2 (WISMP-2) Budget Plan – Cikeusik
Rp Irrigation Scheme Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER ASTANALANGGAR
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 1,886 42,933,749
S.1.3 Timbunan galian setempat m3 46,870 368 17,234,052
Jumlah 1 : 60,167,802
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER TAWANGSARI
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER TERSANA
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 174
HARGA SATUAN JUMLAH HARGA
Water Resources
NOand Irrigation Sector Management Program-2 (WISMP-2)
PEKERJAAN Budget Plan – Cikeusik Irrigation
SATUAN VOLUME Scheme
Rp Rp
S PEKERJAAN JARINGAN IRIGASI SEKUNDER TERSANA
S.1 PEKERJAAN TANAH
S.1.1 Galian Tanah biasa m3 22,760 7,610 173,206,788
S.1.3 Timbunan galian setempat m3 46,870 83 3,894,557
Jumlah 1 : 177,101,345
ENGINEERING ESTIMATE
REVITALISASI SALURAN SEKUNDER PLAYANGAN
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) 175
HARGA SATUAN JUMLAH HARGA
Water Resources
NO and Irrigation Sector Management Program-2
PEKERJAAN (WISMP-2) Budget PlanSATUAN
– Cikeusik Irrigation Scheme
VOLUME
Rp Rp
T PEKERJAAN JARINGAN IRIGASI SEKUNDER PLAYANGAN
T.1 PEKERJAAN TANAH
1.1 Galian Tanah biasa m3 22,760 569.93 12,971,498
1.3 Pembuangan sisa galian setempat 80% m3 15,960 455.94 7,276,805
1.4 Pembuangan sisa galian jarak angkut < 1 km 20% m3 23,010 113.99 2,622,796
ENGINEERING ESTIMATE
REVITALISASI SALURAN SUPLESI CIBERES
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
Improvement of Participatory Irrigation Management (IoPIM) NOMOR HARGA SATUAN JUMLAH HARGA 176
NO and Irrigation Sector Management
Water Resources PEKERJAANProgram-2 (WISMP-2) SATUAN
Budget Plan – Cikeusik VOLUME
Irrigation Scheme
ANALISA Rp Rp
V PEKERJAAN SALURAN SUPLESI
V.1 PEKERJAAN TANAH
V.1.1 Galian Tanah biasa m3 22,760 1,613.35 36,719,936
Jumlah 1 : 103,306,968
ENGINEERING ESTIMATE
REVITALISASI SALURAN SUPLESI ROTI
KABUPATEN CIREBON-KUNINGAN, PROPINSI JAWA BARAT
LAMPIRAN :
1. VOLUME PEKERJAAN SALURAN