Mini Building Management System u
Complete Daikin mini BMS
for building climate control
› Integrate full Daikin
portfolio
› Integrate 3rd party
equipment
2
System
Overview
Web Access
Internet
To connect intelligent Touch Extranet
Manager to the Daikin Cloud LAN
Service, the IoT gateway (EU. 3G
SB.5000072) and AC/DC HTTP interface
converter (999175A) is needed.
Max. 7
DCM601A51 ITM plus adaptor line adapters
Di/Pi port
kWh meter
Direct plug & play connection!
Split
BACnet/IP
Lighting Fan
I/O module
Pump Sensor
DALI Lighting
Protocol
Sensor
3
User
friendliness
Intuitive user interface
Intuitive menu screens enable, even novice users
to operate and monitor the system like an expert.
List view
Designed for simplicity, this menu provides a quick view of overall status
and essential information in a list format. Using the sorting function,
air conditioning units operating under the same conditions and status
are identified for comparison and assessment.
ON
Filter sign
OFF
Error
Layout view
4
Comprehensive management history
via internet
5
Smart energy
management
Powerful schedules guarantee correct operation throughout the year
Calendar settings can automate daily management of air conditioning equipment for the entire year to optimize energy savings and comfort.
A weekly schedule can be set for any air conditioning unit and its
group.
Administrator can also set Start/Stop, Setpoint and below
conditions:
Interlock insures all system components work together, saving energy and increasing comfort.
6
Example 3 Air conditioning interlock with
underfloor heating
By interlocking fire alarms, the system can perform Stops all air conditioning units in
affected fire protection areas
an emergency stop of air conditioning and
ventilation units. OR
Stops all air conditioning
units
Smart energy
management tools
Energy navigator
kWh meter
kWh meter
water meter
Hourly energy
consumption is measured
and the intelligent Touch iTM plus adaptor (Up to 7)
Manager records data sent
Power kWh meter
from the energy meters. gas meter Supply
kWh meter Lighting
kWh meter
7
Accumulated data appears in an easy-to-understand graph.
4 5
1 1
2
5 6
2
3
6 7
3
4
1 - Warning indication 4 - Current month’s target 1 - Warning indication 5 - Current year’s target
2 - Actual daily energy consumption 5 - Prediction line 2 - Actual monthly energy consumption 6 - Prediction line
3 - Cumulate line 6 - Daily average to achieve 3 - Monthly target energy consumption 7 - Monthly target to achieve
month’s target 4 - Cumulate line year’s target
LAN
3
1
2 4
4 The more to
1
5 the upper right
a room is, the higher
6 the extra energy
2 consumption is.
8
PPD calculates air conditioning
usage to divide across tenants
PPD function
The energy consumption is proportionally calculated for each indoor unit.
The data can be used for energy management and calculation of air
conditioning usage fees for respective tenants.
Operational information of individual indoor units are monitored, Daikin’s PPD* keeps track of power
allowing for distribution of power consumption at outdoor units. distribution for each indoor unit.
It performs air conditioning billing
calculations quickly and automatically.
Operational information of
Tenant A individual indoor units
HIGH Operation duration
Room temperature
Expansion valve opening
ratio
Tenant B
er
LOW
et
Automatic calculation of
m
Invoice
m
Invoice
ro
lf
na
Tenant C Tenant B
sig
se
9
Other energy saving tools
Automatic changeover Remote control set point limitation
Cooling/heating operations of each room can be Specify the minimum and maximum set point, so
automatically changed based on setpoint and room the user cannot select a temperature outside the
temperature. range, saving energy.
* In the case of heat pump type VRV, cooling/heating operations can be changed
at the same time for the entire VRV system.
Sliding Temperature
This function is designed to change setpoint to and similar locations, this function effectively prevents
reduce differences between the outdoor and indoor a “cold shock” from exposure to a sudden drop in
temperatures. Particularly useful at building entrances temperature and can also enhance energy savings.
Max.
Min.
Heat shock is likely to occur when differences Heat shock can be prevented by providing a
between indoor and outdoor temperatures are gradual decline in temperature that minimises the
substantial. steep differences between indoor and outdoor Min. Max.
Outdoor temperature
temperatures near entrances.
Timer Extension ON ON
Setback
Unoccupied rooms such as offices at night have no feature changes the air conditioning setpoints in
need for maximum air conditioning operation to unoccupied rooms to prevent unnecessary energy
maintain a suitable room environment. The setback consumption and provide lower electricity costs.
10
Flexible
in size & integration Web Access
In size Internet
Extranet
LAN
3G
http interface
modular design for use in small to large
applications
BACnet protocol
› direct connection on ITM BACnet protocol
› modular to fit the size of the building
WAGO I/O
› simple I/O control
› stepped control via multi state objects
DALI
DALI protocol Protocol
Lighting Lighting
› Control and monitor the lights Lighting Lighting
› Easier facility management: receive error signal
Lighting Sensor
when light or light controller has a malfunction Pump Pump
› Flexible approach and less wiring needed Pump Pump
Sensor Sensor
WAGO I/O Sensor Sensor
› via modbus protocol
› modular to fit the size of the building Air handling
unit Air handling
› simple I/O control unit
11
Easy servicing
and commissioning
containment check
Easy, comfortable and cost efficient compliance to
F-gas requirement for bi-yearly refrigerant contain‑
ment check.
No need for the installer to go on site: 1. Remotely set the 2. Connect to the site via
time 3G or internet
� Remotely set the time and date for refrigerant
containment check.
Simplified trouble
shooting
Display of maintenance contact information
Up to 10 e-mail
addresses can
be registered.
E-mail alerts
are sent to
smartphones
and PCs.
12
Air Conditioning Network Service System
(Optional Maintenance Service). Trouble
commissioning tool
Commissioning of a VRV system was never easier and
faster. 3 flexible ways enable you to commission
the VRV system the way you want.
13
Functions & options
Supported languages English, French, German, Italian, Spanish, Portuguese, Dutch, Chinese and Japanese
Basic functions
Icon view Icons show the operation status of equipment.
Monitoring screens List view Detailed information of each management point is displayed.
Number of programmes:100
Schedule
Up to 20 actions/day can be set.
Number of programmes:500
Interlock
Interlock trigger state can be on/off, malfunction, analogue value, and operation mode switching.
Timer extension Operation stop is selectable from 30, 60, 90, 120, and 180 minutes.
Setback setpoint shift can be set for high and low pattern.
Setback
Temperature range: 1-7°c, -1 -7°c (setpoint shift amount).
14
Functions & options
*1: Total of DIII connection equipment (Indoor, Ventilator, D3 Chiller, D3 Di, D3 Dio)
*2: Maximum number of management points for D3 Chiller only
*3: Total of Di/Pi management points
*4: Total of External Di, External Do, External Ai, and Internal Ai
*5: Maximum number of McQuay AHU management points.
*6: Total of BACnet connection management points. Daikin AHU management point should count as 20 per management point.
15
Download the WAGO selection tool from
my.daikin.eu
› Easy selection of WAGO materials
› Material list creation
› Time saving
- Includes wiring schemes
- Contains commissioning/preset data for iTM
Daikin Europe N.V. Naamloze Vennootschap Zandvoordestraat 300 · 8400 Oostende · Belgium · www.daikin.eu · BE 0412 120 336 · RPR Oostende (Responsible Editor)
The present publication is drawn up by way of information only and does not
constitute an offer binding upon Daikin Europe N.V. Daikin Europe N.V. has
compiled the content of this publication to the best of its knowledge. No express
or implied warranty is given for the completeness, accuracy, reliability or fitness
for particular purpose of its content and the products and services presented
ECPEN21-30210/20 therein. Specifications are subject to change without prior notice. Daikin Europe
N.V. explicitly rejects any liability for any direct or indirect damage, in the broadest
sense, arising from or related to the use and/or interpretation of this publication.
All content is copyrighted by Daikin Europe N.V.