Professional Documents
Culture Documents
Date: 27-Feb-22
Dear Mam,
We are pleased to submit our best proposal for your evaluation and approval.
MATERIAL LABOR
Item No DESCRIPTION Quantity Unit TOTAL ITEM COST
Unit Cost Total Cost Unit Cost Total Cost
I PRELIMINARIES
1 Mobilization/ Demobilization 1.00 lot 10,000.00 10,000.00 0.00 10,000.00
2 Tools & Equipment
3 Bonds and Insurance
3.1 Contractors All-Risk Insurance (CARI)
3.2 Performance Bond
3.3 Guarantee Bond
4 Permits
5 Project Management & Site Supervision
6 Security, Health & Safety
Sub-total I 10,000.00
1 Supply of technical expertise for the repair of davit launching equipment. 1.00 lot 10,000.00 10,000.00
Sub-total X 10,000.00
GRAND TOTAL
I 10,000.00 Preliminaries
X 10,000.00 Inspection and Repair
P 20,000.00 Total Cost (Vat Inclusive)
If you find the proposal, kindly affix your conformity by signing on the space provided below.
We look forward to serving your requirement.