You are on page 1of 5

Site Memo No.

10632-05/SEDE/SITE/
05/SEDE/SITE/SM-203/AKS/NH
30 June 2022
th

D’Entreprises (SEDE)
Societe Egyptienne D’Entreprises (SEDE)
P.O. Box 43321
Abu Dhabi
U.A.E.

Attention: Manager
General Manager

Project: Transmission Scheme


Water Transmission Scheme from
from Madinat
Madinat Zayed
Zayed to
to Liwa
Liwa
Liwa and
and
andQusahwira
Qusahwira
Qusahwira,
12192.1 (Lot
Contract No. N-12192.1 (Lot 2A
2A && 2B)
2B)

Subject: HSE Observations


HSE Observations for Lot 2A Areas

Dear Sir,

With
With reference
reference toto the
the subject
subject above
above and
and site
site visit
visit by
by our HSE
HSEengineer at above
engineer area
at above on on 29-06-2022 of the
area
project,
project, please
please
project, pleasefind
findfind
enclosed
enclosed the
enclosedthethe
observation/safety
observation/safety
observation/safety violations
violations noticed
noticed
violations during
during
noticed the
thethe
during site
sitesite
visit
visitvisit
for
for for
your
your
your
necessary
necessary corrective
corrective and
and preventive
preventive actions.
actions.

You
Youare
areadvised
advisedtotoensure/confirm
ensure/confirmthe
the corrective
corrective and
and preventive
preventive measures
measures taken
taken from
from your
your end
end and
and
necessary close out report of the same shall be submitted to Transco/Engineer not later than three (03)
essary close out report of the same shall be submitted to Transco/Engineer not later than three (03)
days.

This is
This is for
for your
your information
information and
and prompt
prompt action.

Yours faithfully,
Tebodin Middle East Ltd.

A.K. Siddiqui
Resident Engineer

Encl: As above
cc:
TRANSCO – Abu Dhabi
- Project Manager

RW,
RW, AKS, TME PF+encl Page1 of 1
E:\10632-05 TRANSCO - WTS
WTS from
from MZ
MZ to
to Liwa
Liwa && Qusahwira\02.
Qusahwira Correspondence and reports\2.04 To SEDE\2.04.05 Site Memo\SM203 HSE
SM203 Observations
HSE for Lot
Observations 2A 2A
for Lot
Areas.docx
Requirement
Sr (OSHAD & HSE Severity Closeout Photo
No Location Observation Observation Photos
Plan)

Daily Site HSE Observation Report


Sr.
No. Location Observation

PROJECT: Water transmission scheme from Madinat Zayed to Liw

HSE Inspection Team: Shaji Panicker –Shaji Panicker, Resident Engineer, Abdul Siddiqui (ARE) - Waheed
Khan and Mr. Gireesh

It is observed that an
Section 3.8.3
Excavator AD 2 76469
(vi) of OSHAD
is being used for lifting
SF CoP 34.0 –
concrete block, there
1 Pumping Safe Use of
is no evidence of 3 rd
Medium
Station Lifting
party certificate of the
Equipment
hook attached to the
and Lifting
bucket.
Accessories

i). The washroom OSHAD SF CoP


provided for worker 8.0 - General
has foul smell, Workplace
moreover there is no Amenities &
2 Pumping evidence of cleaning Section 2C (vi) Low
Station and disinfection. of OSHAD SF
ii) Urine charts are not CoP 11.0 -
displayed inside the Safety in the
Washrooms. Heat

HSE Observation Report


Page 1 of 4
Requirement
Sr (OSHAD & HSE Severity Closeout Photo
No Location Observation Observation Photos
Plan)

It is observed that
(i) PET bottle are
being used by
worker to drink
water.
(ii) Even though a
calibrated Heat
Stress meter is
Section 3.1.1
available, there is
(e) OSHAD SF
3 Pumping no evidence of
CoP 11.0 - Medium
Station monitoring and
Safety in the
recording of TWL
Heat
index when the
ambient
temperature is
well above 35
degrees Celsius.
(iii) There is no
evidence of mock
drill on Heat

HSE Observation Report


Page 2 of 4
Requirement
Sr (OSHAD & HSE Severity Closeout Photo
No Location Observation Observation Photos
Plan)

Stress to test the


preparedness in
case of an heat
stress incident in
the project.

It is observed that
deep excavation is not OSHAD SF CoP
4 Pumping adequately barricaded 22.0 - Low
Station
to prevent person Barricading of
from falling in. Hazards

It is observed that
sand blasting is being
OSHAD SF CoP
carried out in Tank 1,
5 Pumping 27.0 - Mediu
however there is no
Station Confined m
hole watcher to
Spaces
prevent unauthorized
access.

It is observed that the OSHAD SF CoP


deep excavation is 29.0 –
6 Pumping blocked with wooden Excavation Low
Station
pieces which have
nails.

HSE Observation Report


Page 3 of 4
Requirement
Sr (OSHAD & HSE Severity Closeout Photo
No Location Observation Observation Photos
Plan)

OSHAD SF CoP
Its observed that
54.0 - Waste
7 Pumping waste skip is full and
Management Low
Station has not been cleared
on timely basis.

It is observed that
OSHAD SF CoP
Argon, Acetylene and
8 Pumping 49.0 -
Oxygen compressed High
Station Compressed
gas cylinders are
Gases and Air
stored together.

Prepared by:
Shaji Panicker (HSEQ Coordinator)
Sign: ____________________________________
Resident Engineer. 29 June 2021

HSE Observation Report


Page 4 of 4