Professional Documents
Culture Documents
500 N/mm 2.
X53 8. IN PORTION MARKED 'Z' (SHOWN IN TYP. SECTION THROUGH COL.)
X54
X55 OF THE COL. SAME LINK SHALL BE PROVIDED FOR ZONE 'h1' IN
X56 CASE OF EXTERNAL COL. & FOR ZONE 'h2' IN CASE OF INTERNAL
X57 COLUMN, FACILITATE IS PLACING TH ESE LINKS MAY BE PROVIDED
'U' SHAPED.
9. THE FOUNDATION DESIGN IN THIS DRAWING IS BASED ON SOIL
TESTING REPORT SUBMITTED
10. FOUNDATION HAS BEEN DESINED CONSIDERING SBC 250KN/M2 AT
B3
B3
B7
B7 DEPTH 2.0 M
B7
B7 B7a
B7
B10
B7
B7 B9 S1 B2 B3
B15 c B3 WILL BE USED AS IN FILL WALL MAS ONRY
B9 B1 B7 B7a b 12. THIS IS GFC BUIDLING SUBJECT ED TO THE APPROVAL BY THE
B9 S1 c CLIENT.
LIFT B9
B15 S1 c SHAFT 13.ALL ELECTRICAL AND PHE SHAFTS WILL BE AS PER ARCHITECTURAL
B9 a S1 DRAWINGS.
B3 B2 a Y8
B1
B4
B2 B3
B4
B3
B3
S1 B3
S1 c
B4
c c STAIRCASE c Y7
B2
S1
c B7
c
B2
S1 a S1
a a S1 c Y6
B7
SB2
B2
S1 B7
B3
B2
a S1
b b B3 b S2 Y5
B1
B3
B2 B3
B3
S3
d c B3
B5 S3 B2
B3 B7
c B7
a B8
B1
150 c B11 S3
B1
B1
S4
c B8
Y4
B11
21460
S5 165
B6
a
B1
e S4
150 B7
B3
B1
c b
A B7
B5 Y3
B1
S1
B7
c
c
B7
125
B7
B1
B7
125
B7 c B1
A S1
B7
B1
B7
SB1
B7
B7 S1 B1 S1
B7
B1
SB1 S1 B7
125 125
B1
B7
B1
9415
125 B7
S1
Y2
A SHAFT
B1
Cut out a
B11
B8 A
A
B7
B7
B7
B7
B7
B7 B8
A
Y1
8.6°
EQ
90
.0°
c
Y'
Floor slab reinf.
150
160
GENERAL ARRANGEMENT AT THIRD FLO OR SLAB DETAIL
From grid X45 to X57
Floor Beam.
THICKNESS OF SLAB IS 140 MM, UNO
Indicate bottom Reinforcement
Indicate Top Reinforcement
Provide 8Ø @ 200 c/c distributio n reinforcement if not shown in plan
0.2L1
0.3L1 0.3L2 0.2L2
DISTRIBUTION R/F AT
a-10 @150 c/c TOP (MIN. TWO BARS)
b- 8 @150 c/c Bottom Reinforcement
c- 10 @150 c/c L1 L2
d- 8 @175 c/c
e-12 @150 c/c TYPICAL SLAB SECTION SHOWING N. B. C. C.
I.S.O 9001
PROVIDE DISTRIBUTION REINF- 8 @ 200c/c NBCC
WHEREVER REQUIVED CONSULTANCY DIVISION