Professional Documents
Culture Documents
SR.
DESCRIPTION QTY.
NO.
30 FEET CONTAINER
1. 1 Nos.
(PLC/MCC/RECTIFIER)
24 FEET CONTAINER
2. 1 Nos.
(H2 GEN. & PURIFICATION SKID)
3. DM UNIT 1 Nos.
R S T U V W X Y Z A1 B1 C1 D1 5. BUFFER VESSEL 1 Nos.
3000TYP 3000
BRICK WALL
15
3000
25700
gate
2812
2' deep surface water drain
16
3280
C C
B
3800 9490 510 3020 1268 2500
3840 700 4950
3095 .2
3000TYP
4089
325
NEUTRALIZATION
938
2370 PIT 2000
613
DEPTH-1000mm
300
EL(+)0.0M
3015 2365 17
2000
wa
EL(+)0.300M
2 4000.0000
der
1
1778
RW
ter
d
325
5907
Gro H TA
rain
8000
Un und NK
R4
5000 R4
4685
EXISTING 18
ROUTE FOR
FORKLIFT AREA
4207 2000.0000
ROUTE FOR 1076
FENCING
FORKLIFT AREA
2891
.02
5476 3400 4924 1793 5326.5734
EL(+)0.300M
B
H
20502.34
4096
HIG ST
MA
19
ref detail A
3400
5 3480
ROUTE FOR 8353
36
FORKLIFT AREA
74.4
EL(+)0.300M
9
527
3
1050
658
(2X100%)
2250
2250
3304
3304
AIR COMPRESSOR
5365
EL(+)0.300M
21
1050
rea
4 m space ga
itin
wa 4.29
14 61
1503 A
4000
TOWARDS BLENDING SKID
CUSTOMER
23 NAME
Torrent Gas Pvt. Limited
Torrent Power Limited
D:\USERS\Desktop \d own load .p ng
OWNERS ENG. TRACTEBEL ENGINEERING PVT. LTD.
PROJECT NAME 0.5 MW GREEN HYDROGEN GENERATION PLANT AND BLENDING FACILITY
2) HRP to confirm if the provided space is sufficient to redesign and increase the pile capacity. FACILITY
3) EEL, TPL, and Tractebel to confirm the space remaining as indicated in the sketch and interdistances are complying with statutory regulations.