You are on page 1of 1

NOTES :-

1. PIPING ARRANGEMENT WILL BE UPDATED LATER.


2. ALL DIMENSIONS ARE IN MM..

SR.
DESCRIPTION QTY.
NO.
30 FEET CONTAINER
1. 1 Nos.
(PLC/MCC/RECTIFIER)

24 FEET CONTAINER
2. 1 Nos.
(H2 GEN. & PURIFICATION SKID)

3. DM UNIT 1 Nos.
R S T U V W X Y Z A1 B1 C1 D1 5. BUFFER VESSEL 1 Nos.

3000TYP 3000

BRICK WALL

15
3000

25700
gate
2812
2' deep surface water drain
16

3280
C C

B
3800 9490 510 3020 1268 2500
3840 700 4950
3095 .2
3000TYP
4089
325
NEUTRALIZATION

938
2370 PIT 2000

613
DEPTH-1000mm
300

EL(+)0.0M
3015 2365 17
2000

wa

EL(+)0.300M
2 4000.0000

der
1

1778
RW
ter
d
325
5907

Gro H TA
rain
8000

Un und NK
R4
5000 R4
4685
EXISTING 18

ROUTE FOR
FORKLIFT AREA
4207 2000.0000
ROUTE FOR 1076

FENCING
FORKLIFT AREA

2891
.02
5476 3400 4924 1793 5326.5734
EL(+)0.300M

B
H

20502.34
4096
HIG ST
MA
19
ref detail A
3400
5 3480
ROUTE FOR 8353
36

FORKLIFT AREA
74.4

EL(+)0.300M
9

4m space 5429 1400 2500 1650 1300


R4 600 200
20
5391
.43

527
3
1050
658
(2X100%)

2250
2250
3304

3304
AIR COMPRESSOR

5365
EL(+)0.300M

21
1050

rea
4 m space ga
itin
wa 4.29
14 61
1503 A

1" H2 OUTPUT FROM BUFFER VESSEL TO BLENDING SKID


22
14602.06 5472.72

4000
TOWARDS BLENDING SKID
CUSTOMER
23 NAME
Torrent Gas Pvt. Limited
Torrent Power Limited
D:\USERS\Desktop \d own load .p ng
OWNERS ENG. TRACTEBEL ENGINEERING PVT. LTD.

PROJECT NAME 0.5 MW GREEN HYDROGEN GENERATION PLANT AND BLENDING FACILITY

CONTINGENCY PLAN Rudra Gas Greenstat


CONTRACTOR
Hydrogen Private Limited
In case if working pile test for buffer vessel foundation fails and we need to redesign,
DRAWING TITLE CIVIL AND FOUNDATION LAYOUT
1) Keeping provision to add extra row of piles in X and Y axis as shown HYDROGEN GENERATION
in the drawing.

2) HRP to confirm if the provided space is sufficient to redesign and increase the pile capacity. FACILITY
3) EEL, TPL, and Tractebel to confirm the space remaining as indicated in the sketch and interdistances are complying with statutory regulations.

You might also like