Gas Transportation:

The Bridge between the Gas Source and the Market

by

Justin Ezeala
GM, Commercial NGPTC
5th June 2018
Outline
The Nigerian Natural Gas Industry

Industrial Hubs: Existing and Proposed/Potential

Gas Transportation Infrastructure: Bridge for Gas Supply to Industrial hubs

Developing a Backbone Gas Transportation Network

Existing & Proposed Gas Transportation Infrastructure

Conclusion

2
The Nigerian Natural Gas Industry
Nigeria has an estimated gas reserve of
Export LNG (47%)
198.74Tcf (as at 1st January 2017)*
3.7 Bscf/d (NLNG)

Re-injection and
Other Operational
Usage (28%)
2.2 Bscf/d

Gas Flaring (9%)


Current Gas Production
0.7 Bscf/d
7.9 Bscf/d**

Domestic Consumption (16%)


1.3 Bscf/d (Power and Industries)

*Estimate obtained from Annual Reserve & Production Report (ARPR) - 2017.
**Figures are as at 12th May, 2018.

3
Industrial Hubs: Existing and Proposed/Potential
Existing Proposed/Potential
West
Lagos, Ibafo – Sagamu Ijebu-Ode, Omotosho,
Interchange, Agbara-Ota, Ibadan, etc.
Ikorodu, Ogijo, Abeokuta,
Lekki, etc.
East/South-South
Aba, Onitsha, Nnewi, Port Calabar, Enugu, Ogidigben,
Harcourt, etc. etc.
North
Kano, Kaduna, Ajaokuta, etc. Abuja, Gboko, etc.

4
Industrial Hubs: Existing and Proposed/Potential

Industrial Hubs
Gas Sources

5
Gas Transportation Infrastructure:
Bridge for Gas Supply to Industrial hubs
Most of Nigeria’s gas resource is located in the Niger Delta region
and the East while the markets are spread across the country.

A robust gas transportation network is required to deliver gas to the


existing and proposed industrial hubs.

Clearly, the presence of gas supply infrastructure supports the


development of industrial hubs, bringing cleaner, cheaper and more
environmentally friendly fuel to the markets.

6
Developing a Backbone Gas Transportation Network

One of the main goals of the Gas Master Plan was to develop a backbone
gas transportation network to make gas available to existing and potential
industrial hubs across the country.

While this may not have been fully realized, a lot of progress has been made
with required modifications to the initial proposal where necessary.

7
Existing & Proposed Gas Transportation Infrastructure
Western and Eastern Gas Pipeline Networks - Existing

8
Existing & Proposed Gas Transportation Infrastructure
Western Gas Pipeline Network - Existing

9
Existing & Proposed Gas Transportation Infrastructure
Northern Gas Pipeline Network - Existing

10
SCHEMATICS OF MAJOR ON-GOING AND PLANNED GAS INFRASTRUCTURES
Kano

Jebba
40”X221 Km
AKK Proposed
Kano
PP
NNPC/Oando Kaduna
(EIIJ) Obajana Proposed
Cement Abuja
24” PP AKK Proposed
Ilorin 40”X193 Km Kaduna
18” Geregu PP
PP 40”X199 Km
Abuja
Ajaokuta
LEGEND 2
NNPC/Oando AKK
(EIIJ) Existing Pipelines
24”
On-going ELP II
500 MMscfd ??
Ajaokuta
Olorunshogo Seplat
OB3 Pipeline (on-going)
PP Ibadan Gas 24”
36”
TNGP (Phase 1)
Sapele Plant CS 36”X 206 Km
500 MMscfd
Trans Nigerian Gas Pipeline
PP
Egbin Enugu Odidi – Warri Expansion Pipeline
PP Oben
Omotosho TNGP (Phase 1)
Ihovbor 100 MMscfd
Station ELPS –Ibadan-Ilorin-Jebba (EIIJ)
36” PP
PP
Oredo OB3 36”X 90 Km
Green Colour (Rich Gas)
48”X111 Km
GP
200 MMscfd
OB3 Samabri/ Umuahia
36”X18 Km Biseni
Ovade
GP Assa North/ TNGP (Phase 2)
Ohaji South
PS5 PS4 PS3 Oben
CS2 CS1 Central 24”X75 Km
Node OBOB
(PS1) Delta
50 MMscfd
CPF TNGP (Phase 1)
30”
PS2 KP52.7 ELP II IV
Ugehelli
Lekki 36” PP
GP NAOC TNGP (Early Gas) 36” X 110 Km
NGC
Facilit Ikot
GP y Alaoji Ekpene
40” X 88 Km
Utorogu PP
WAGP Warri
GTP GP Obite
- Benin Ubeta Imo
510 MMscfd GP
- Togo, TNGP (Phase 2)
40”X30 Km
- Ghana) OUR River
Escravos Odidi TNGP (Early Gas)36”X47Km 24”X 38Km
Node Node NOPL (24”) CS Obigbo
Rumuji Node
Ukanafun
Escravos
Odidi 86 MMscfd
Gas Plant WEND 36”X85Km
CPF GTS 1 20”X 16 Km
TNGP (Early Gas) 20”X 26 Km
(EGP) CPF Obigbo
2,400 MMscfd 80 MMscfd GTS 4 North
490 MMscfd
LEGEND 1

TNGP (Early Gas)


Uyo
F. Yokri /
Okan

24”X18Km
S. Swamp Okolom Ikot
Dom, Gas Plant Abasi
240 MMscfd Cawthorne a GP
Alakiri Calabar
Rich Gas Plant Erha/ Channel
Giga Gas 75 MMscfd
Bossi 45 MMscfd 100 MMscfd
CPF Okoped
Power Plant 180 MMscfd Afam i
PP
Existing Node, Metering Station, Terminal Gas Station Alscon 24”X43 Km
Seven TNGP (Phase 2)
Other Gas Off taker Energy QIT
200 MMscfd
400 MMscfd
CS ELPS Compressor Station (Planned)

Oso
CS TNGP Compressor Station NLNG Platform
11
Bonny NGPTC 2016
Existing & Proposed Gas Transportation Infrastructure
•On-going Gas Infrastructure Projects
S/N Gas Pipeline Status
1 Obiafu-Obrikom-Oben (OB3) Pipeline On-going
(East-West interconnection, to link Gas sources in the East to Western and Completion: Q4 2018
Northern markets)

2 ELPS II Pipeline (ELPS Expansion) On-going


(From Gas source to customers: Capacity increase) Completion: Q4 2018

3 ELPS-Lekki Pipeline Under construction


(Linking gas demand centre) Completion: Q4 2018

4 Trans-Nigeria Gas Pipeline (TNGP)


(Extending pipeline network footprints in the East and North)

- QIT- Obigbo - Obiafu/Obrikom Tendering stage


Early Gas Phase
- Cawthorne Channel – Alakiri – Obigbo Tendering stage
- Ajaokuta – Abuja – Kaduna - Kano (AKK) Awarded
Phase 1
- Obigbo – Umuahia – Enugu - Ajaokuta (OUA) Tendering stage
5 Odidi-Warri Gas Pipeline Expansion Project (OWEP) EPC awarded
(Linking gas source to network - capacity increase)

6 Assa North/Ohaji South (ANOH) – OB3 Pipeline EPC award stage


(Linking gas source to network) 12
Existing & Proposed Gas Transportation Infrastructure
•The Trans-Nigeria Gas Pipeline Project
Map view Phases

 261 km x 20/36 inches pipeline from QIT-Ikot Abasi-Ukanafun-


Obigbo-Ob/Ob
 Artery to connect gas supply to feed the Ajaokuta-Kano line
QIT – and the ELPS via OB3 pipeline
OB/OB

 614 km x 40 inches pipeline from Obigbo-Umuahia-Enugu-


Ajaokuta; 683 km x 40 inches pipeline from Ajaokuta – Abuja –
Kaduna – Kano
 Connects gas supply from SPDC/CNL’s Assa North
AKK development via the Eastern axis through AKK, further
reinforcing supply to the East and to AKK
Phase one

 174 km x 24 inches pipeline from QIT axis, traversing Calabar-


Ikot-Ekpene-Umuahia
Phase
Two
Phase two

Early phase

Front End Engineering Design has been completed. 13


Conclusion
Development of a robust gas transportation network is critical for the
development of gas industrial hubs across the country.

Major pipeline projects are being developed to realize this.

All stakeholders across the natural gas value chain (gas suppliers, gas
transporters, LDCs, etc.) must work together to catalyze the development of
gas industrial hubs.

Synergy among stakeholders reduces costs, increases profits, minimizes


business risks and serves the customer better.