YUUZAN TWIN OPERATION PROCEDURE

Start for twin operating Twin operation

Completion for single operating OUT OF SYNC lamp on master crane


preparation for both master & slave control panel

Return change over switch to


TWIN PREP mode
Turn change over switch of master crane
control panel to TWIN PREP mode
In case where luffing & hositing
each are not in synchronize

Both master & slave crane should be turned to stop


automatically at Twin set position (1) (2)

Confirm of SLEWING ZERO lamp on


master crane controller (for hoisting)

Adjust jib angle of master crane to slave


SLEW LUFF HOIST ZERO
ZERO ZERO ZERO RESET
LAMP LAMP LAMP
LUFFING

ZERO
Confirm of LUFFING ZERO lamp on master crane controller (for hoisting) RESET
HOISTING

Adjust hook height of master crane to slave SOURCE HYD.


PUMP

Confirm of HOISTING ZERO lamp on master crane controller (for hoisting) STOP
EMGCY

LIMIT TWIN
Confirm of TWIN STAND BY lamp of master crane control panel CANCEL PREP

BUZZER TWIN
STOP STAND BY

Turn change over switch of master crane


control panel to TWIN mode OUT OF LIMIT
SYNC

Fit hanging beam ( Twin spreader block )


OIL LEVEL WIRE
LOW
SLACK
Twin operation
Completion for twin operating preparation OVER OIL
LOAD TEMP