Project Name: Tanajib Cogeneration And Desalination Plant Project No: AHC/EW/KSA/22/02
RA TEAM (NAMES) DESIGNATION SIGNATURES DOUCMNET-TASK/ACTIVITY/PROCESS NAME RISK EVALUATION TABLE
6
2 3
Ahmed Mansoor HSE Incharge PERSON EXPOSED RISK FACTOR PROBABILITY Probabl
Remote Possible
e
Risk Assessment for High Risk Eliminate; 6
E – Employee / WSWP to reduce risk to
Nandhu CK Construction Manager
Mobilization & Establishment Consultant 25 - 36
acceptable level
Major/Fatal
Injury
M M H
SEVERITY
C – Contractors / only with full
Hassan Albaqali Site Engineer Sub- 12 - 24 implementation of all Reportable L M M
contractors
control measures. Injury
O – Others, such 2
as Public, Maintain all basic
visitor and 1 - 11 disciplines and controls. First Aid or L L M
clients. Minor
DEPARTMENT/AREA APPROVED BY: DATE: 27 June 2022 NEXT REVIEW DATE:
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk.
RISK ASSESSMENT
RISK REDUCTION ACTION PLAN
HAZARD IDENTIFICATION CONTROL Consequences X Likelihood
Consequences X Likelihood = Risk Ranking
= Risk Ranking
Risks Issue Person
Implemented
Consequence
Consequence
(Possible incident) Exposed
Risk Ranking
Risk Ranking
Likelihood
Likelihood
Controls
Workplace/Activity/ Follow up by
Yes/No
[What can go wrong] IMPROVED EXISTING CONTROLS /
No.
Consequence
Consequence
Implemented
Risk Ranking
Risk Ranking
Likelihood
Likelihood
Risks Issue
Controls
Yes/No
(Possible incident) IMPROVED EXISTING
Person Follow up by
No.
Consequence
Consequence
Implemented
Risk Ranking
Risk Ranking
Likelihood
Likelihood
Risks Issue
Controls
Yes/No
(Possible incident) IMPROVED EXISTING
Person Follow up by
No.
4 Excavation works for Damage to Underground Major or Minor Injury All equipment Using on site must be in good X X 4 3 12 Continuous supervision throughout the 4 2 8 Project execution team Yes
HAZARD IDENTIFIFCATION AND RISK ASSESSMENT
Identify the hazard on the given task and conduct assessment of the actual site condition, all identified risk should provide with a plan to eliminate or control the risk. Samsung Revision-00 Date:
RISK ASSESSMENT RISK REDUCTION ACTION PLAN
HAZARD IDENTIFICATION CONTROL Consequences X Likelihood
Consequences X Likelihood = Risk Ranking
= Risk Ranking
Consequence
Consequence
Implemented
Risk Ranking
Risk Ranking
Likelihood
Likelihood
Risks Issue
Controls
Yes/No
(Possible incident) IMPROVED EXISTING
Person Follow up by
No.