Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
2.0.2 Research & Reference Center 106 sf² 49.00 5,194.00 51.75 5,485.50 80.00 8,480.00 52 5,486 49.00 5194
2.0.3 Servent Rooms, Servent Toilets, WC, Unitlity, Kitchen 975 sf² 50.00 48,750.00 51.75 50,456.25 80.00 78,000.00 52 50,456 50.00 48750
Breaking of existing Tile Flooring, packing, carting away the debris and
3.0.2 disposal. (As per site visit). 850 sf² 21.00 17,850.00 23.00 19,550.00 70.00 59,500.00 23 19,550 21.00 17850
Area: Servent Rooms
4.0.0 Millworks: - - - 0
1
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
4.0.2 Servent Toilets, WC, Unitlity, Kitchen 7 Nos 2,490.00 17,430.00 2,875.00 20,125.00 2,500.00 17,500.00 2,500 17,500 2,490.00 17430
4.0.3 Kitchen, Dining, Bath, Ablution, Prayer Area, Store 8 Nos 2,490.00 19,920.00 2,875.00 23,000.00 2,500.00 20,000.00 2,500 20,000 2,490.00 19920
4.0.4 Finance Store 1 No 2,490.00 2,490.00 2,875.00 2,875.00 2,500.00 2,500.00 2,500 2,500 2,490.00 2490
5.0.0 Miscellanous Works: - - - 0
1.0.2 Studio 1225 sf² 19.00 23,275.00 17.25 21,131.25 65.00 79,625.00 17 21,131 17.25 21131.25
2.0.0 Wall Works: - - - 0
2.0.2 Rest Room 350 sf² 45.00 15,750.00 51.75 18,112.50 80.00 28,000.00 52 18,113 45.00 15750
2.0.3 Server Room - Studio 80 sf² 45.00 3,600.00 51.75 4,140.00 80.00 6,400.00 52 4,140 45.00 3600
2.0.4 Lounge 50 sf² 45.00 2,250.00 51.75 2,587.50 80.00 4,000.00 52 2,588 45.00 2250
2.0.5 Bath 50 sf² 45.00 2,250.00 51.75 2,587.50 80.00 4,000.00 52 2,588 45.00 2250
2.0.6 Bed 85 sf² 45.00 3,825.00 51.75 4,398.75 80.00 6,800.00 52 4,399 45.00 3825
2.0.8 Rest Room 1 No 5,500.00 5,500.00 2,875.00 2,875.00 10,000.00 10,000.00 2,875 2,875 2,875.00 2875
3.0.0 Flooring Works: - - - 0
2
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
3.0.3 Rest Room 175 sf² 15.00 2,625.00 13.80 2,415.00 70.00 12,250.00 14 2,415 13.80 2415
4.0.0 Millworks: - - - 0
Removing of existing shutter swing Door including sub-frames and
architraves, packing, carting away the debris and disposal. (As per site - - - - - - 0
visit).
Single Shutter: - - - 0
4.0.1 Server Room - Studio 1 No 5,000.00 5,000.00 8,625.00 8,625.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
4.0.2 Powder, Expo, Office, CEO's Office, Filling, Bath (Wooden) 5 Nos 3,000.00 15,000.00 8,625.00 43,125.00 2,500.00 12,500.00 2,500 12,500 2,500.00 12500
4.0.3 Café 1 No 6,500.00 6,500.00 8,625.00 8,625.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
4.0.4 Rest Room 1 No 6,500.00 6,500.00 8,625.00 8,625.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
4.0.5 Bath 1 No 6,500.00 6,500.00 8,625.00 8,625.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
Double Shutter: 6,500.00 - - 6,500.00 0
4.0.6 Studio Entrance 1 No 6,500.00 6,500.00 8,625.00 8,625.00 4,500.00 4,500.00 4,500 4,500 4,500.00 4500
4.0.7 Board Room (Excluded) 1 No 6,500.00 6,500.00 8,625.00 8,625.00 4,500.00 4,500.00 4,500 4,500 4,500.00 4500
4.0.8 Server Room 4 Nos 6,500.00 26,000.00 8,625.00 34,500.00 4,500.00 18,000.00 4,500 18,000 4,500.00 18000
1.0.2 Project Office 1225 sf² 19.00 23,275.00 17.25 21,131.25 65.00 79,625.00 17 21,131 17.25 21131.25
2.0.0 Wall Works: - - - 0
2.0.2 Meeting Room 150 sf² 40.00 6,000.00 46.00 6,900.00 85.00 12,750.00 46 6,900 40.00 6000
3
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
2.0.3 Finance Department 400 sf² 40.00 16,000.00 46.00 18,400.00 85.00 34,000.00 46 18,400 40.00 16000
3.0.0 Millworks: - - - 0
Single Shutter: - - - 0
3.0.1 Business Dynamic Department 1 No 4,900.00 4,900.00 5,175.00 5,175.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
3.0.2 Meeting Room 1 No 4,900.00 4,900.00 5,175.00 5,175.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
3.0.3 Rest Room 1 No 4,900.00 4,900.00 5,175.00 5,175.00 2,500.00 2,500.00 2,500 2,500 2,500.00 2500
Double Shutter: 4,900.00 - - - - - 4,900.00 0
3.0.4 Finance Department 1 No 4,900.00 4,900.00 5,175.00 5,175.00 4,500.00 4,500.00 4,500 4,500 4,500.00 4500
4
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
5
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Ditto: 4" thk Masonry Wall as per approved shop drawings drawings.
2.0.5 75 sf² 325.00 24,375.00 375.00 28,125.00 280.00 21,000.00 280 21,000 280.00 21000
Area: Gents Toilet
Supply and apply of 1/2" thick Plaster including 1:4 Ratio Cement Sand
2.0.6 mortar. 515 sf² 90.00 46,350.00 110.00 56,650.00 60.00 30,900.00 60 30,900 60.00 30900
Area: Gents Prayer Area
2.0.7 Ladies Prayer Area 650 sf² 90.00 58,500.00 110.00 71,500.00 60.00 39,000.00 60 39,000 60.00 39000
2.0.8 Gents Ablution 160 sf² 90.00 14,400.00 110.00 17,600.00 60.00 9,600.00 60 9,600 60.00 9600
2.0.9 Ladies Ablution 200 sf² 90.00 18,000.00 110.00 22,000.00 60.00 12,000.00 60 12,000 60.00 12000
3.0.0 Miscellanous Works: - - - 0
Supply and constructing of Ablution Seat out of PCC for 6 person.
3.0.1 Overall size: W2'xL15'-6"xH1'. 1 Item 22,000.00 22,000.00 23,500.00 23,500.00 35,000.00 35,000.00 23,500 23,500 22,000.00 22000
Area: Gents Ablution
Supply and constructing a PCC Step towards Gaming area. Length: 8'
3.0.4 1 No 17,250.00 17,250.00 16,500.00 16,500.00 5,000.00 5,000.00 5,000 5,000 5,000.00 5000
Area: Café
Breaking the earth and Excavating (for bed and to expand basement) for
4.0.1 handicapped children and elevator. 13000 ft³ 23.00 299,000.00 25.00 325,000.00 22.00 286,000.00 22 286,000 22.00 286000
Area: Next to existing Café.
6
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
2.0.11 Entire Toilet Area 3700 sf² 90.00 333,000.00 110.00 407,000.00 60.00 222,000.00 60 222,000 60.00 222000
A.3 First Floor - - - 0
1.0.0 Flooring Works: - - - 0
Supply and apply of 1½" PCC to the existing floor.
1.0.1 2540 sf² 128.00 325,120.00 130.00 330,200.00 169.00 429,260.00 130 330,200 128.00 325120
Area: Auditorium.
2.0.0 Wall Works: - - - 0
Supply and constructing of full height 8" thk Masonry Wall as per
2.0.1 approved shop drawings drawings. 725 sf² 340.00 246,500.00 350.00 253,750.00 395.00 286,375.00 350 253,750 340.00 246500
Area: Class Room 03, Class Room 04
2.0.2 Disable Toilet, Ladies Toilets, Gents Toilet, Class room 05 2525 sf² 340.00 858,500.00 350.00 883,750.00 395.00 997,375.00 350 883,750 340.00 858500
Supply and constructing of full height 4" thk Masonry Wall as per
2.0.3 approved shop drawings drawings. 650 sf² 281.00 182,650.00 285.00 185,250.00 280.00 182,000.00 280 182,000 280.00 182000
Area: Disable Toilet, Ladies Toilets, Gents Toilet, Class room 05
Supply and apply of 1/2" thick Plaster including 1:4 Ratio Cement Sand
2.0.4 mortar. 1475 sf² 100.00 147,500.00 110.00 162,250.00 60.00 88,500.00 60 88,500 60.00 88500
Area: Class Room 03, Class Room 04
2.0.5 Disable Toilet, Ladies Toilets, Gents Toilet, Class room 05 6150 sf² 100.00 615,000.00 110.00 676,500.00 60.00 369,000.00 60 369,000 60.00 369000
B Hard Interior Works - - - 0
B.1 Basement Floor - - - 0
1.0.0 Ceiling Works: - - - 0
1.0.2 Ladies Prayer Area 250 sf² 181.00 45,250.00 185.00 46,250.00 240.00 60,000.00 185 46,250 181.00 45250
1.0.4 Ladies Ablution 135 sf² 181.00 24,435.00 185.00 24,975.00 240.00 32,400.00 185 24,975 181.00 24435
1.0.5 Café 700 sf² 181.00 126,700.00 185.00 129,500.00 240.00 168,000.00 185 129,500 181.00 126700
1.0.6 kitchen 275 sf² 181.00 49,775.00 185.00 50,875.00 240.00 66,000.00 185 50,875 181.00 49775
1.0.7 Gents Toilet 250 sf² 181.00 45,250.00 185.00 46,250.00 240.00 60,000.00 185 46,250 181.00 45250
7
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.9 Ladies Prayer Area 250 sf² 90.00 22,500.00 105.00 26,250.00 78.00 19,500.00 78 19,500 78.00 19500
1.0.10 Gents Ablution 175 sf² 90.00 15,750.00 105.00 18,375.00 78.00 13,650.00 78 13,650 78.00 13650
1.0.11 Ladies Ablution 135 sf² 90.00 12,150.00 105.00 14,175.00 78.00 10,530.00 78 10,530 78.00 10530
1.0.12 Café 700 sf² 90.00 63,000.00 105.00 73,500.00 78.00 54,600.00 78 54,600 78.00 54600
1.0.13 kitchen 275 sf² 90.00 24,750.00 105.00 28,875.00 78.00 21,450.00 78 21,450 78.00 21450
1.0.14 Gents Toilet 250 sf² 90.00 22,500.00 105.00 26,250.00 78.00 19,500.00 78 19,500 78.00 19500
2.0.0 Flooring Works: - - - 0
2.0.2 Ladies Prayer Area 250 sf² 570.00 142,500.00 575.00 143,750.00 595.00 148,750.00 575 143,750 570.00 142500
2.0.4 Ladies Ablution 135 sf² 550.00 74,250.00 575.00 77,625.00 640.00 86,400.00 575 77,625 550.00 74250
2.0.5 Café 700 sf² 550.00 385,000.00 575.00 402,500.00 640.00 448,000.00 575 402,500 550.00 385000
2.0.6 Class 07, Finance Store, Admin Store, Equipment 1450 sf² 550.00 797,500.00 575.00 833,750.00 640.00 928,000.00 575 833,750 550.00 797500
2.0.9 Gents Toilet 250 sf² 580.00 145,000.00 575.00 143,750.00 580.00 145,000.00 575 143,750 575.00 143750
3.0.0 Wall Works: - - - 0
Supply and apply of Jotun Fenomastic Paint to the wall with the
treatments of 1 stucco coat, 1 primer coat and 2 paint coats. (As per
3.0.1 550 sf² 100.00 55,000.00 105.00 57,750.00 78.00 42,900.00 78 42,900 78.00 42900
approved shop drawings and details).
Area: Gents Prayer Area
3.0.2 Ladies Prayer Area 650 sf² 100.00 65,000.00 105.00 68,250.00 78.00 50,700.00 78 50,700 78.00 50700
3.0.3 Gents Ablution 185 sf² 100.00 18,500.00 105.00 19,425.00 78.00 14,430.00 78 14,430 78.00 14430
3.0.4 Ladies Ablution 205 sf² 100.00 20,500.00 105.00 21,525.00 78.00 15,990.00 78 15,990 78.00 15990
8
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
3.0.5 Café 1050 sf² 100.00 105,000.00 105.00 110,250.00 78.00 81,900.00 78 81,900 78.00 81900
3.0.6 kitchen 750 sf² 100.00 75,000.00 105.00 78,750.00 78.00 58,500.00 78 58,500 78.00 58500
3.0.7 Gents Toilet 660 sf² 100.00 66,000.00 105.00 69,300.00 78.00 51,480.00 78 51,480 78.00 51480
4.0.0 Miscellanous Works: - - - 0
1.0.2 Class Room 01, Class Room 02 1275 sf² 190.00 242,250.00 195.00 248,625.00 240.00 306,000.00 195 248,625 190.00 242250
1.0.3 CEO's Office, Staff, Support Staff 850 sf² 190.00 161,500.00 195.00 165,750.00 240.00 204,000.00 195 165,750 190.00 161500
1.0.4 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room 1250 sf² 190.00 237,500.00 195.00 243,750.00 240.00 300,000.00 195 243,750 190.00 237500
1.0.5 Existing Store 55 sf² 190.00 10,450.00 195.00 10,725.00 240.00 13,200.00 195 10,725 190.00 10450
1.0.6 Corridor 650 sf² 190.00 123,500.00 195.00 126,750.00 240.00 156,000.00 195 126,750 190.00 123500
1.0.7 Skill Training Centre / Training Kitchen 1650 sf² 190.00 313,500.00 195.00 321,750.00 240.00 396,000.00 195 321,750 190.00 313500
1.0.8 Proposed Store 165 sf² 190.00 31,350.00 195.00 32,175.00 240.00 39,600.00 195 32,175 190.00 31350
1.0.9 Powder 55 sf² 190.00 10,450.00 195.00 10,725.00 240.00 13,200.00 195 10,725 190.00 10450
1.0.10 Exhibition Suite 1725 sf² 190.00 327,750.00 195.00 336,375.00 240.00 414,000.00 195 336,375 190.00 327750
1.0.12 Washing Area 165 sf² 190.00 31,350.00 195.00 32,175.00 240.00 39,600.00 195 32,175 190.00 31350
1.0.13 Disable Bath, Ladies Toilet, Gents Toilet 500 sf² 190.00 95,000.00 195.00 97,500.00 240.00 120,000.00 195 97,500 190.00 95000
9
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.15 Class Room 01, Class Room 02 1275 sf² 95.00 121,125.00 105.00 133,875.00 78.00 99,450.00 78 99,450 78.00 99450
1.0.16 CEO's Office, Staff, Support Staff 850 sf² 95.00 80,750.00 105.00 89,250.00 78.00 66,300.00 78 66,300 78.00 66300
1.0.17 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room 1250 sf² 95.00 118,750.00 105.00 131,250.00 78.00 97,500.00 78 97,500 78.00 97500
1.0.18 Existing Store 55 sf² 95.00 5,225.00 105.00 5,775.00 78.00 4,290.00 78 4,290 78.00 4290
1.0.19 Corridor 650 sf² 95.00 61,750.00 105.00 68,250.00 78.00 50,700.00 78 50,700 78.00 50700
1.0.20 Skill Training Centre / Training Kitchen 1650 sf² 95.00 156,750.00 105.00 173,250.00 78.00 128,700.00 78 128,700 78.00 128700
1.0.21 Proposed Store 165 sf² 95.00 15,675.00 105.00 17,325.00 78.00 12,870.00 78 12,870 78.00 12870
1.0.22 Exhibition Suite 1725 sf² 95.00 163,875.00 105.00 181,125.00 78.00 134,550.00 78 134,550 78.00 134550
1.0.23 Bath 55 sf² 95.00 5,225.00 105.00 5,775.00 78.00 4,290.00 78 4,290 78.00 4290
1.0.24 Washing Area 165 sf² 95.00 15,675.00 105.00 17,325.00 78.00 12,870.00 78 12,870 78.00 12870
1.0.25 Disable Bath, Ladies Toilet, Gents Toilet 500 sf² 95.00 47,500.00 105.00 52,500.00 78.00 39,000.00 78 39,000 78.00 39000
2.0.0 Flooring Works: - - - 0
2.0.2 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room 1250 sf² 610.00 762,500.00 625.00 781,250.00 640.00 800,000.00 625 781,250 610.00 762500
2.0.3 Class Room 01, Class Room 02 1275 sf² 610.00 777,750.00 625.00 796,875.00 640.00 816,000.00 625 796,875 610.00 777750
2.0.4 CEO's Office, Staff, Support Staff 850 sf² 610.00 518,500.00 625.00 531,250.00 640.00 544,000.00 625 531,250 610.00 518500
2.0.5 Proposed Store 165 sf² 610.00 100,650.00 625.00 103,125.00 640.00 105,600.00 625 103,125 610.00 100650
2.0.6 Skill Training Centre / Training Kitchen 1650 sf² 610.00 1,006,500.00 625.00 1,031,250.00 640.00 1,056,000.00 625 1,031,250 610.00 1006500
2.0.7 Proposed Store 165 sf² 610.00 100,650.00 625.00 103,125.00 640.00 105,600.00 625 103,125 610.00 100650
2.0.8 Exhibition Suite 1725 sf² 610.00 1,052,250.00 625.00 1,078,125.00 640.00 1,104,000.00 625 1,078,125 610.00 1052250
2.0.10 Existing Store and Bath 330 sf² 610.00 201,300.00 625.00 206,250.00 580.00 191,400.00 580 191,400 580.00 191400
2.0.11 Powder 55 sf² 610.00 33,550.00 625.00 34,375.00 580.00 31,900.00 580 31,900 580.00 31900
Supply and apply of Jotun Fenomastic Paint to the wall with the
treatments of 1 stucco coat, 1 primer coat and 2 paint coats. (As per
3.0.1 525 sf² 82.00 43,050.00 90.00 47,250.00 78.00 40,950.00 78 40,950 78.00 40950
approved shop drawings and details).
Area: Silent Area
10
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
3.0.2 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room. 1920 sf² 82.00 157,440.00 90.00 172,800.00 78.00 149,760.00 78 149,760 78.00 149760
3.0.3 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room. 825 sf² 82.00 67,650.00 90.00 74,250.00 78.00 64,350.00 78 64,350 78.00 64350
3.0.4 Class Room 01, Class Room 02 1025 sf² 82.00 84,050.00 90.00 92,250.00 78.00 79,950.00 78 79,950 78.00 79950
3.0.5 CEO's Office 200 sf² 82.00 16,400.00 90.00 18,000.00 78.00 15,600.00 78 15,600 78.00 15600
3.0.6 Class Room 01, Class Room 02 550 sf² 82.00 45,100.00 90.00 49,500.00 78.00 42,900.00 78 42,900 78.00 42900
3.0.7 Entire Toilet Area 3700 sf² 82.00 303,400.00 90.00 333,000.00 78.00 288,600.00 78 288,600 78.00 288600
3.0.8 Skill Training Centre / Training Kitchen 4220 sf² 82.00 346,040.00 90.00 379,800.00 78.00 329,160.00 78 329,160 78.00 329160
3.0.9 Exhibition Suite 3000 sf² 82.00 246,000.00 90.00 270,000.00 78.00 234,000.00 78 234,000 78.00 234000
Supply and Installation of thk Curtain Wall to the wall as per approved
3.0.10 drawings. (As per approved shop drawings and details). 205 sf² 1,030.00 211,150.00 1,075.00 220,375.00 580.00 118,900.00 580 118,900 580.00 118900
Area: Meeting Room, Office 02
3.0.11 CEO's Office 315 sf² 1,015.00 319,725.00 1,075.00 338,625.00 580.00 182,700.00 580 182,700 580.00 182700
3.0.12 Staff 90 sf² 1,015.00 91,350.00 1,075.00 96,750.00 580.00 52,200.00 580 52,200 580.00 52200
3.0.13 Support Staff 205 sf² 1,015.00 208,075.00 1,075.00 220,375.00 580.00 118,900.00 580 118,900 580.00 118900
Supply and Installation of thk 12mm Glass Partition to the wall as per
3.0.14 approved drawings. (As per approved shop drawings and details). 60 sf² 1,590.00 95,400.00 1,500.00 90,000.00 580.00 34,800.00 580 34,800 580.00 34800
Area: Silent Area
3.0.15 Staff, Support Staff 135 sf² 1,590.00 214,650.00 1,500.00 202,500.00 580.00 78,300.00 580 78,300 580.00 78300
3.0.16 Office 01, Office 02, Admin Staff, Teaching Staff, Meeting Room. 525 sf² 1,590.00 834,750.00 1,500.00 787,500.00 580.00 304,500.00 580 304,500 580.00 304500
1.0.2 Self Study, Students Recreation Hub, Class Room 06 2000 sf² 172.00 344,000.00 180.00 360,000.00 240.00 480,000.00 180 360,000 172.00 344000
1.0.3 Corridor and Lobby 650 sf² 172.00 111,800.00 180.00 117,000.00 240.00 156,000.00 180 117,000 172.00 111800
1.0.4 Class Room 03, Class Room 04 1300 sf² 172.00 223,600.00 180.00 234,000.00 240.00 312,000.00 180 234,000 172.00 223600
1.0.5 Class Room 05 1030 sf² 172.00 177,160.00 180.00 185,400.00 240.00 247,200.00 180 185,400 172.00 177160
11
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Supply and apply of Jotun Fenomastic Paint to the gypsum ceiling with
the treatments of 1 stucco coat, 1 primer coat and 2 paint coats. (As per
1.0.7 1525 sf² 172.00 262,300.00 180.00 274,500.00 78.00 118,950.00 78 118,950 78.00 118950
approved shop drawings and details).
Area: Auditorium.
1.0.8 Self Study, Students Recreation Hub, Class Room 06 2000 sf² 155.00 310,000.00 180.00 360,000.00 78.00 156,000.00 78 156,000 78.00 156000
1.0.9 Corridor and Lobby 650 sf² 155.00 100,750.00 180.00 117,000.00 78.00 50,700.00 78 50,700 78.00 50700
1.0.10 Class Room 03, Class Room 04 1300 sf² 155.00 201,500.00 180.00 234,000.00 78.00 101,400.00 78 101,400 78.00 101400
1.0.11 Disable Bath, Ladies Toilet, Gents Toilet 475 sf² 155.00 73,625.00 180.00 85,500.00 78.00 37,050.00 78 37,050 78.00 37050
1.0.12 Class Room 05 1030 sf² 155.00 159,650.00 180.00 185,400.00 78.00 80,340.00 78 80,340 78.00 80340
2.0.0 Flooring Works: - - - 0
Supply and apply of Carpet Tile Flooring with adhesive (glue) to the
existing floor as per approved color and sample. (As per approved shop
2.0.2 1525 sf² 534.00 814,350.00 550.00 838,750.00 595.00 907,375.00 550 838,750 534.00 814350
drawings and details).
Area: Auditorium.
2.0.4 Class Room 03, Class Room 04 1300 sf² 550.00 715,000.00 600.00 780,000.00 640.00 832,000.00 600 780,000 550.00 715000
2.0.5 Class Room 05 1030 sf² 550.00 566,500.00 600.00 618,000.00 640.00 659,200.00 600 618,000 550.00 566500
Supply and apply of Jotun Fenomastic Paint to the wall with the
treatments of 1 stucco coat, 1 primer coat and 2 paint coats. (As per
3.0.1 1550 sf² 85.00 131,750.00 100.00 155,000.00 78.00 120,900.00 78 120,900 78.00 120900
approved shop drawings and details).
Area: Class Room 06
3.0.2 Class Room 03, Class Room 04 725 sf² 90.00 65,250.00 100.00 72,500.00 78.00 56,550.00 78 56,550 78.00 56550
12
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
3.0.3 Disable Toilet, Ladies Toilets, Gents Toilet, Class room 05 6150 sf² 90.00 553,500.00 100.00 615,000.00 78.00 479,700.00 78 479,700 78.00 479700
Supply and Installation of thk Curtain Wall to the wall as per approved
3.0.4 drawings. (As per approved shop drawings and details). 400 sf² 700.00 280,000.00 750.00 300,000.00 580.00 232,000.00 580 232,000 580.00 232000
Area: Class Room 06
3.0.5 Lobby 250 sf² 700.00 175,000.00 750.00 187,500.00 580.00 145,000.00 580 145,000 580.00 145000
3.0.6 Class Room 05 595 sf² 700.00 416,500.00 750.00 446,250.00 580.00 345,100.00 580 345,100 580.00 345100
C Joinery & Doors - - - 0
C.1 Basement Floor - - - 0
1.0.0 Doors - - - 0
Single Shutter: - - - 0
1.0.1 Gents Ablution. (Type - WD1) Overall size: W3'6"xH8'. 1 No 87,000.00 87,000.00 85,000.00 85,000.00 125,000.00 125,000.00 85,000 85,000 85,000.00 85000
1.0.2 Ladies Ablution. (Type - WD1) Overall size: W3'6"xH8'. 1 No 87,000.00 87,000.00 85,000.00 85,000.00 125,000.00 125,000.00 85,000 85,000 85,000.00 85000
1.0.3 Gents Toilet. (Type - WD1) Overall size: W3'6"xH8'. 1 No 87,000.00 87,000.00 85,000.00 85,000.00 125,000.00 125,000.00 85,000 85,000 85,000.00 85000
1.0.4 Kitchen. (Type - WD1) Overall size: W3'6"xH8'. 1 No 87,000.00 87,000.00 85,000.00 85,000.00 125,000.00 125,000.00 85,000 85,000 85,000.00 85000
2.0.0 Miscellanous - - - 0
13
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Single Shutter: - - - 0
1.0.1 Disable Toilet. (Type - WD1) Overall size: W3'6"xH8'. 1 No 83,500.00 83,500.00 82,000.00 82,000.00 125,000.00 125,000.00 82,000 82,000 82,000.00 82000
1.0.2 Ladies Toilet. (Type - WD2) Overall size: W3'xH8'. 1 No 83,500.00 83,500.00 80,000.00 80,000.00 125,000.00 125,000.00 80,000 80,000 80,000.00 80000
1.0.3 Gents Toilet. (Type - WD2) Overall size: W3'xH8'. 1 No 83,500.00 83,500.00 80,000.00 80,000.00 125,000.00 125,000.00 80,000 80,000 80,000.00 80000
1.0.4 Ladies & Gents Toilet. (Type - WD4) Overall size: W2'6"xH7'. 8 Nos 60,000.00 480,000.00 75,000.00 600,000.00 115,000.00 920,000.00 75,000 600,000 60,000.00 480000
Single Shutter: - - - 0
1.0.5 Store. (Type - WD3) Overall size: W2'9"xH8'. 1 No 84,000.00 84,000.00 80,000.00 80,000.00 140,000.00 140,000.00 80,000 80,000 80,000.00 80000
1.0.6 Class Room 01. (Type - WD1) Overall size: W3'6"xH8'. 1 No 84,000.00 84,000.00 82,000.00 82,000.00 140,000.00 140,000.00 82,000 82,000 82,000.00 82000
1.0.7 Class Room 02. (Type - WD1) Overall size: W3'6"xH8'. 1 No 84,000.00 84,000.00 82,000.00 82,000.00 140,000.00 140,000.00 82,000 82,000 82,000.00 82000
1.0.8 Powder. (Type - WD3) Overall size: W2'9"xH8'. 1 No 84,000.00 84,000.00 82,000.00 82,000.00 125,000.00 125,000.00 82,000 82,000 82,000.00 82000
1.0.9 Store. (Type - WD1) Overall size: W3'6"xH8'. 1 No 84,000.00 84,000.00 82,000.00 82,000.00 140,000.00 140,000.00 82,000 82,000 82,000.00 82000
Double Shutter: - - - 0
1.0.10 Exhibition Suite. (Type - WD5) Overall size: W5'xH8'. 1 No 130,000.00 130,000.00 120,000.00 120,000.00 140,000.00 140,000.00 120,000 120,000 120,000.00 120000
Single Shutter: - - - 0
1.0.11 Staff. (Type -GD1) Overall size: W3'6"xH8'. 2 Nos 52,000.00 104,000.00 55,000.00 110,000.00 65,000.00 130,000.00 55,000 110,000 52,000.00 104000
1.0.12 Support Staff. (Type -GD1) Overall size: W3'6"xH8'. 1 No 52,000.00 52,000.00 55,000.00 55,000.00 65,000.00 65,000.00 55,000 55,000 52,000.00 52000
1.0.13 Admin Staff. (Type -GD1) Overall size: W3'6"xH8'. 1 No 52,000.00 52,000.00 55,000.00 55,000.00 65,000.00 65,000.00 55,000 55,000 52,000.00 52000
1.0.14 Office 01. (Type -GD1) Overall size: W3'6"xH8'. 1 No 52,000.00 52,000.00 55,000.00 55,000.00 65,000.00 65,000.00 55,000 55,000 52,000.00 52000
14
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.15 Office 02. (Type -GD1) Overall size: W3'6"xH8'. 1 No 52,000.00 52,000.00 55,000.00 55,000.00 65,000.00 65,000.00 55,000 55,000 52,000.00 52000
1.0.16 Meeting Room. (Type -GD1) Overall size: W3'6"xH8'. 1 No 52,000.00 52,000.00 55,000.00 55,000.00 65,000.00 65,000.00 55,000 55,000 52,000.00 52000
Double Shutter: - - - 0
1.0.17 Exhibition Suite. (Type -GD4) Overall size: W6'xH9'. 2 Nos 102,500.00 205,000.00 100,000.00 200,000.00 88,000.00 176,000.00 88,000 176,000 88,000.00 176000
1.0.18 Skill Training Center. (Type -GD3) Overall size: W5'6"xH8'. 1 No 78,000.00 78,000.00 85,000.00 85,000.00 88,000.00 88,000.00 85,000 85,000 78,000.00 78000
1.0.19 Corridor. (Type -GD3) Overall size: W5'6"xH8'. 1 No 78,000.00 78,000.00 85,000.00 85,000.00 88,000.00 88,000.00 85,000 85,000 78,000.00 78000
1.0.20 Group Study. (Type -GD3) Overall size: W5'6"xH8'. 1 No 78,000.00 78,000.00 85,000.00 85,000.00 88,000.00 88,000.00 85,000 85,000 78,000.00 78000
1.0.21 Library. (Type -GD3) Overall size: W5'6"xH8'. 1 No 78,000.00 78,000.00 85,000.00 85,000.00 88,000.00 88,000.00 85,000 85,000 78,000.00 78000
1.0.22 Silent Area. (Type -GD3) Overall size: W5'6"xH8'. 1 No 78,000.00 78,000.00 85,000.00 85,000.00 88,000.00 88,000.00 85,000 85,000 78,000.00 78000
1.0.23 Admin Staff. (Type -GD2) Overall size: W5'xH8'. 1 No 78,000.00 78,000.00 86,500.00 86,500.00 88,000.00 88,000.00 86,500 86,500 78,000.00 78000
2.0.0 Miscellanous - - - 0
15
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Single Shutter: - - - 0
1.0.1 Disable Toilet. (Type - WD1) Overall size: W3'6"xH8'. 1 No 81,500.00 81,500.00 83,000.00 83,000.00 140,000.00 140,000.00 83,000 83,000 81,500.00 81500
1.0.2 Ladies Toilet. (Type - WD2) Overall size: W3'xH8'. 1 No 81,500.00 81,500.00 81,000.00 81,000.00 140,000.00 140,000.00 81,000 81,000 81,000.00 81000
1.0.3 Gents Toilet. (Type - WD2) Overall size: W3'xH8'. 1 No 81,500.00 81,500.00 81,000.00 81,000.00 140,000.00 140,000.00 81,000 81,000 81,000.00 81000
1.0.4 Ladies & Gents Toilet. (Type - WD4) Overall size: W2'6"xH7'. 8 Nos 74,000.00 592,000.00 75,000.00 600,000.00 125,000.00 1,000,000.00 75,000 600,000 74,000.00 592000
Single Shutter: - - - 0
1.0.5 Class Room 0. (Type - WD1) Overall size: W3'6"xH8'. 1 No 75,000.00 75,000.00 83,000.00 83,000.00 140,000.00 140,000.00 83,000 83,000 75,000.00 75000
1.0.6 Class Room 04. (Type - WD1) Overall size: W3'6"xH8'. 1 No 75,000.00 75,000.00 83,000.00 83,000.00 140,000.00 140,000.00 83,000 83,000 75,000.00 75000
1.0.7 Class Room 05. (Type - WD1) Overall size: W3'6"xH8'. 1 No 75,000.00 75,000.00 83,000.00 83,000.00 140,000.00 140,000.00 83,000 83,000 75,000.00 75000
Double Shutter: - - - - - - 0
1.0.8 Exhibition Suite. (Type - WD5) Overall size: W5'xH8'. 1 No 117,000.00 117,000.00 120,000.00 120,000.00 190,000.00 190,000.00 120,000 120,000 117,000.00 117000
16
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Single Shutter: - - - 0
1.0.9 Class Room 06. (Type -GD1) Overall size: W3'6"xH8'. 1 No 80,000.00 80,000.00 83,000.00 83,000.00 65,000.00 65,000.00 65,000 65,000 65,000.00 65000
Double Shutter: - - - 0
1.0.10 Corridor. (Type -GD3) Overall size: W5'6"xH8'. 2 Nos 95,000.00 190,000.00 126,500.00 253,000.00 88,000.00 176,000.00 88,000 176,000 88,000.00 176000
1.0.11 Auditorium. (Type -GD3) Overall size: W5'6"xH8'. 1 No 95,000.00 95,000.00 126,500.00 126,500.00 88,000.00 88,000.00 88,000 88,000 88,000.00 88000
D Stainless Steel Works (Kitchen) - - - 0
D.1 Basement Floor - - - 0
1.0.0 SS Works: - - - 0
E Accessories - - - 0
E.1 Basement Floor - - - 0
1.0.0 Bathroom Accessories: - - - 0
Gents Toilet - - - 0
1.0.1 Installation of Ceramic W.C as per approved sample and brand. 4 Nos 41,000.00 164,000.00 43,000.00 172,000.00 39,000.00 156,000.00 39,000 156,000 39,000.00 156000
1.0.4 Installation of W.C Faucet Set as per approved sample and brand. 4 Nos 31,900.00 127,600.00 36,800.00 147,200.00 15,000.00 60,000.00 15,000 60,000 15,000.00 60000
1.0.6 Installation of single Sink as per approved sample and brand. 2 Nos 18,000.00 36,000.00 17,250.00 34,500.00 18,000.00 36,000.00 17,250 34,500 17,250.00 34500
17
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.8 Ladies Ablution 4 Nos 11,000.00 44,000.00 9,775.00 39,100.00 13,500.00 54,000.00 9,775 39,100 9,775.00 39100
E.2 Ground Floor - - - 0
1.0.0 Bathroom Accessories: - - - 0
Disable Bath, Ladies Toilet, Gents Toilet - - - 0
1.0.1 Installation of Ceramic W.C as per approved sample and brand. 3 Nos 40,500.00 121,500.00 43,000.00 129,000.00 39,000.00 117,000.00 39,000 117,000 39,000.00 117000
1.0.3 Installation of W.C Faucet Set as per approved sample and brand. 3 Nos 34,000.00 102,000.00 37,000.00 111,000.00 15,000.00 45,000.00 15,000 45,000 15,000.00 45000
1.0.5 Installation of single Sink as per approved sample and brand. 5 Nos 16,000.00 80,000.00 17,250.00 86,250.00 18,000.00 90,000.00 17,250 86,250 16,000.00 80000
Powder - - - 0
1.0.6 Installation of Ceramic W.C as per approved sample and brand. 1 No 44,500.00 44,500.00 43,000.00 43,000.00 39,000.00 39,000.00 39,000 39,000 39,000.00 39000
1.0.8 Installation of W.C Faucet Set as per approved sample and brand. 1 No 33,000.00 33,000.00 36,500.00 36,500.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
1.0.10 Installation of single Sink as per approved sample and brand. 1 No 17,900.00 17,900.00 17,250.00 17,250.00 18,000.00 18,000.00 17,250 17,250 17,250.00 17250
1.0.1 Installation of Ceramic W.C as per approved sample and brand. 3 Nos 36,000.00 108,000.00 43,500.00 130,500.00 39,000.00 43,500 130,500 36,000.00 108000
1.0.3 Installation of W.C Faucet Set as per approved sample and brand. 3 Nos 32,000.00 96,000.00 36,800.00 110,400.00 15,000.00 36,800 110,400 32,000.00 96000
18
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.5 Installation of single Sink as per approved sample and brand. 5 Nos 14,100.00 70,500.00 17,250.00 86,250.00 18,000.00 17,250 86,250 14,100.00 70500
F Skirting Works - - - 0
Supply and installation of 3" hight Skirting out of oak wood as per
1.0.6 1 Item 219,000.00 219,000.00 226,500.00 226,500.00 - 226,500 226,500 219,000.00 219000
approved design and color by Architect. (Quantities TBC).
G External Paint - - - 0
Supply and applying of Benjamin Moore Paint, Ultra Spec Exterior to
1.0.8 12150 sf² 120.00 1,458,000.00 110.00 1,336,500.00 110.00 1,336,500.00 110 1,336,500 110.00 1336500
external façade.
External Tile: 24"X48" Porcelain Tile with metal stud channel system
1.0.9 2860 sf² 1,350.00 3,861,000.00 1,295.00 3,703,700.00 685.00 1,959,100.00 685 1,959,100 685.00 1959100
in approved color, Brand: Kalebodur
Supply and Installation of Rooftop Tiles with insulation as per approved
1.0.10 12500 sf² 190.00 2,375,000.00 - 220.00 2,750,000.00 220 2,750,000 190.00 2375000
drawings.
H Outdoor Stone Flooring (Walkways) - - - 0
H.1 Ground Floor - - - 0
1.0.0 Stone Walkways - - - 0
Supply and Installation of Stone Tile Flooring to build car parking,
1.0.1 1 Item 641,000.00 641,000.00 660,000.00 660,000.00 85,000.00 85,000.00 85,000 85,000 85,000.00 85000
clouded as per drawing # 09.
I MEP Works - - - 0
I.1 Basement, Ground & First Floor - - - 0
Provide and install piping and routing connecting to the existing pipe
lines, using of PPR pipes for water supply and uPVC pipes for
1.0.0 sewerages lines including all necessary fittings complete in all respects 1 Item 337,000.00 337,000.00 350,000.00 350,000.00 3,450,000.00 3,450,000.00 350,000 350,000 337,000.00 337000
in standard brand. Vender need to make a site visit to calculate.
Area: Toilet Areas
J Lift Base - - - 0
J.1 Ground Floor - - - 0
K Reparing Works - - - 0
K.1 Basement, Ground & First Floor - - - 0
Reparing of existing curtain walls, broken glasses etc. (If any). Vender
1.0.0 1 Item 155,250.00 155,250.00 150,000.00 150,000.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
need to make a site visit to check.
L Metal Stairs & Bridge - - - 0
19
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
Removing of existing Metal Stairs and making new one with bridge
1.0.0 1 Item 323,000.00 323,000.00 330,000.00 330,000.00 199,000.00 199,000.00 199,000 199,000 199,000.00 199000
extension clouded as per drawing # 10.
M RCC Staris - - - 0
M.1 Basement Floor - - - 0
Constructing of RCC Stairs towards ablution areas in basement, clouded
1.0.0 1 Item 151,350.00 151,350.00 150,000.00 150,000.00 80,000.00 80,000.00 80,000 80,000 80,000.00 80000
as per drawings # 10.
N Miscellanous Works: - - - 0
N.1 Ground Floor - - - 0
Modification to existing Entarnace stairs' steps and making a ramp,
1.0.0 1 Item 61,000.00 61,000.00 63,250.00 63,250.00 55,000.00 55,000.00 55,000 55,000 55,000.00 55000
clouded as per drawings # 11.
1.0.1 Marble Flooring to Entrance Area. 250 sf² 1,415.00 353,750.00 1,400.00 350,000.00 1,450.00 362,500.00 1,400 350,000 1,400.00 350000
1.0.2 Closring of exidting open Slab. 250 sf² 700.00 175,000.00 825.00 206,250.00 450.00 112,500.00 450 112,500 450.00 112500
Sub Total: 47,733,925 47,229,275.00 52,229,360.00 - - - 0
Electrical & AC Works - - - 0
A AC Units - - - 0
A.1 Basement Floor - - - 0
1.0.0 Proposed AC Units - - - 0
Supply and Installation of Cassete AC Unit as per approved model by
1.0.1 Architect. (Only Installation). 2 No 31,000.00 62,000.00 34,500.00 69,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
Area: Café
1.0.2 Gaming Area 1 No 31,000.00 31,000.00 34,500.00 34,500.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
2.0.0 Shiftable AC Units - - - 0
Removing of existing Split AC Unit and re-Installation.
2.0.1 1 No 11,400.00 11,400.00 11,000.00 11,000.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
Area: Finance Store (Only Installation).
2.0.2 Gents Prayer Area 1 No 11,400.00 11,400.00 11,000.00 11,000.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.3 Gents Ablution Area 1 No 11,400.00 11,400.00 11,000.00 11,000.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.4 Ladies Prayer Area 1 No 11,400.00 11,400.00 11,000.00 11,000.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.5 Ladies Ablution Area 1 No 11,400.00 11,400.00 11,000.00 11,000.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
A.2 Ground Floor - - - 0
1.0.0 Proposed AC Units - - - 0
Supply and Installation of Cassete AC Unit as per approved model by
1.0.1 Architect. (Only Installation). 2 Nos 34,000.00 68,000.00 37,500.00 75,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
Area: Group Study Area.
1.0.2 Library 6 Nos 34,000.00 204,000.00 37,500.00 225,000.00 15,000.00 90,000.00 15,000 90,000 15,000.00 90000
1.0.3 Silent Area 2 Nos 34,000.00 68,000.00 37,500.00 75,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
1.0.4 Student Support Registration 1 No 34,000.00 34,000.00 37,500.00 37,500.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
1.0.5 CEO's Office 1 No 34,000.00 34,000.00 37,500.00 37,500.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
20
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.6 Corridor 2 Nos 34,000.00 68,000.00 37,500.00 75,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
1.0.7 Skill Training Centre / Training Kitchen 4 Nos 34,000.00 136,000.00 37,500.00 150,000.00 15,000.00 60,000.00 15,000 60,000 15,000.00 60000
1.0.8 Eshibition Suite 6 Nos 34,000.00 204,000.00 37,500.00 225,000.00 15,000.00 90,000.00 15,000 90,000 15,000.00 90000
Supply and Installation of Split AC Unit as per approved model by
2.0.0 Architect. (Only Installation). 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
Area: Teaching Staff
2.0.1 Admin Staff 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.2 Meeting Room 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.3 Office 01 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.4 Office 02 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.5 Staff 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.6 Support Staff 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.7 Store 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
2.0.8 Washing Area 1 No 34,000.00 34,000.00 37,500.00 37,500.00 8,500.00 8,500.00 8,500 8,500 8,500.00 8500
3.0.0 Shiftable AC Units - - - 0
3.0.2 Class Room 02 1 No 13,000.00 13,000.00 11,000.00 11,000.00 15,000.00 15,000.00 11,000 11,000 11,000.00 11000
3.0.3 Corridor 1 No 13,000.00 13,000.00 11,000.00 11,000.00 15,000.00 15,000.00 11,000 11,000 11,000.00 11000
A.3 First Floor - - - 0
1.0.0 Proposed AC Units - - - 0
Supply and Installation of Cassete AC Unit as per approved model by
1.0.1 Architect. (Only Installation). 4 Nos 38,500.00 154,000.00 40,000.00 160,000.00 15,000.00 60,000.00 15,000 60,000 15,000.00 60000
Area: Auditorium
1.0.2 Self Study 1 No 38,500.00 38,500.00 40,000.00 40,000.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
1.0.3 Students Recreation Hub 1 No 38,500.00 38,500.00 40,000.00 40,000.00 15,000.00 15,000.00 15,000 15,000 15,000.00 15000
1.0.4 Class Room 03 2 Nos 38,500.00 77,000.00 40,000.00 80,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
1.0.5 Class Room 05 2 Nos 38,500.00 77,000.00 40,000.00 80,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
1.0.6 Class Room 06 2 Nos 38,500.00 77,000.00 40,000.00 80,000.00 15,000.00 30,000.00 15,000 30,000 15,000.00 30000
1.0.7 Corridor 4 Nos 38,500.00 154,000.00 40,000.00 160,000.00 15,000.00 60,000.00 15,000 60,000 15,000.00 60000
21
Project: Renovation and Expansion of Existing Office Building, Islamabad To be added in Sum
Client: HASHOO SCHOOL OF HOSPITALITY MANAGEMENT To be Quoted
Design Consultant: Impact Design International
COMPARATIVE BID ANALYSIS
Sr. No. DISCRIPTION QTY UNIT RATE AMUONT RATE AMUONT RATE AMUONT
REMARKS
BOQ for Demolition Works, Civil & Hard Interior Works & Electrical & AC Works Consultants Estimate Pelican Engineers D.I.I
1.0.1 Supply and Installation or Lights as approved sample by Architect. 763 Nos 3,400.00 2,594,200.00 4,000.00 3,052,000.00 5,850.00 4,463,550.00 4,000 3,052,000 3,400.00 2594200
2.0.1 Supply and Installation of Fire Alarm as per approved drawings. 100 Nos 30,500.00 3,050,000.00 32,000.00 3,200,000.00 12,000.00 1,200,000.00 12,000 1,200,000 12,000.00 1200000
3.0.0 Cameras - - - 0
3.0.1 Supply and Installation of Camera as approved drawings. 50 Nos 16,000.00 800,000.00 17,500.00 875,000.00 11,000.00 550,000.00 11,000 550,000 11,000.00 550000
4.0.0 Speakers - - - 0
4.0.1 Supply and Installation of Speakers as approved drawings. 15 Nos 19,900.00 298,500.00 18,500.00 277,500.00 15,000.00 225,000.00 15,000 225,000 15,000.00 225000
C LV Panel
C.1 Ground Floor
1.0.0 Shifting of existng LV Panel, vender need to make a site visit. 1 Item - - -
22