You are on page 1of 3

NAVA ENERGY ZAMBIA LIMITED

IZUMA HOUSE, MAAMBA, P.O BOX 99,


MAAMBA, ZAMBIA, E-mail: info@navaenergy.in

Suggestion No:
Submitted to MCL for:
(To be given at respective department)
Approval Information / Record

Suggestion:
Date : 29.05.2020
Originator : CHONA M Department : C&I
Area : DM PLANT Equipment : Roots Blowers
Requirement : Priority : HIGH
Improves reliability Most essential

Safety needed Essential

Operational flexibility Preferable

Cost saving

Environment need

Brief description:

In DM plant we have a roots blower room housing roots blowers. Recently there was an incident that
involved roots blower B. the equipment was running normally until when discharge air pressure and
temperature raised rapidly.
Unnecessarily there was equipment damage which propositionally causes cost to the company. To curb
such I have come up with a suggestion as detailed below.

Details of suggestion:

Roots blower A and B have a common discharge header and it is installed with a pressure transmitter.
During the incident we observed that the common header pressure increased from normal (60Kpa) to above
90Kpa. I therefore, suggest that we use the pressure transmitter value in PLC logic to generate an alarm
when header pressure builds to 80Kpa. This will enable the operator to take probable action to protect
equipment and probably personnel.

List of Attachments, if any : None

Suggestion evaluation / Approval Signature of Originator

Page 1 of 3
NAVA ENERGY ZAMBIA LIMITED
IZUMA HOUSE, MAAMBA, P.O BOX 99,
MAAMBA, ZAMBIA, E-mail: info@navaenergy.in

1. Any safety / environmental violation expected: Yes / No (If yes, please state it)

2. Cost/Benefit Analysis:

3. Method of evaluating improvement:

Signature of Head of the Department Signature of Head - Maintenance

Page 2 of 3
NAVA ENERGY ZAMBIA LIMITED
IZUMA HOUSE, MAAMBA, P.O BOX 99,
MAAMBA, ZAMBIA, E-mail: info@navaenergy.in

Project team – India comments:

Head – O&M comments:

Plant Head comments/ Approval:

MCL Remarks & Signature:

(For initiating Management of Change order by Department: _________________________)