01.

Corcovado, Work Done Report


Work Order: 2019-10224
12M Routine, Performance Test, Fire Pumps
Technical Account details

Tech Acc : 813.100 TA Description : PUMPS AND TANKS FIRE FIGHTING SYSTEM

Reference : | OI-SCS-0034-FG6 Location : Criticality : Safety Critical

Maker : SHI Makers No. : Serial No. : C813.100

Work Order details

Id : 2019-10224 Job class : Planned Maintenance Interval : 12 Month

Org Schedule : 813.C125 Job type : General Maintenance Duration : 1,0

Priority : Medium ( Can be delayed if APPROVED ) Department : Hull & Machinery Float : 0

Due date : 1/1/2020 Last done date : Scheduling : Dynamic

Status : Closed Created by : ADA Created date : 12/30/2019

Approved by : CPM Approved date : 1/19/2020 Printed date : 9/8/2020

Work Order description

Page 1 of 4
01. Corcovado, Work Done Report
Work Order: 2019-10224
12M Routine, Performance Test, Fire Pumps
Note: Below to be performed by competent person (3rd party).

Note: - Fire Pumps must be tested annually for performance by developing their characteristic curves (head
versus flow rate) using instruments to measure flow, pressure and rotation.
- These instruments must be certified and calibrated as per INMETRO.
- The efficiency of the pump must correspond to manufacturer specifications as well as NORMAN-01 / DPC
section 4, to ensure proper functionality in case of fire.

NOTE: This PM MUST be performed along with 3M routine.

1. Remove coupling guard and visually examine coupling assembly for conditions listed below:
- damage
- looseness
- missing hardware

2. If applicable, remove coupling cover and visually examine couplings for conditions listed below:
- wear
- looseness
- misalignment

NOTE: There are many types of coupling connectors e.g. flex grids, rubber elements and drive spiders.

3. Visually examine coupling connector for conditions listed below:


- damage
- wear
- looseness

4. Check shaft alignment, and realign if required.

NOTE: Isolation valves MUST be examined with flow to make sure that they are operating correctly.

5. Visually examine connections for leaks.

6. Visually examine isolation valves for leaks.

7. If fitted, perform pump low pressure auto-start test.

NOTE: To pass minimum capacity test, pump must supply 50 psi (3.45 bar) at the highest hydrant in the system
with 2 hydrants open.

8. Perform pump minimum capacity test.

9. Measure fire pump discharge pressure during pump minimum capacity test and record in RMS.

NOTE: Below Task MUST be performed by an electrical technician.

10. Measure motor amps during pump minimum capacity test and record in RMS.

NOTE: Pump MUST be evaluated under normal operating conditions.

11. Listen to Pump for excessive noise and vibration.

12. Make sure that the fire pump relief valves are set correctly.

Page 2 of 4
01. Corcovado, Work Done Report
Work Order: 2019-10224
12M Routine, Performance Test, Fire Pumps

Work done Report

1. Remove coupling guard and visually examine coupling assembly for conditions listed below:
- damage
- looseness
- missing hardware
- Coupling inspected ok
2. If applicable, remove coupling cover and visually examine couplings for conditions listed below:
- wear
- looseness
- misalignment
- Coupling inspected ok
3. Visually examine coupling connector for conditions listed below:
- damage
- wear
- looseness
- Coupling connectors inspected ok
4. Check shaft alignment, and realign if required.
- Shaft Alignment inspected ok
5. Visually examine connections for leaks.
- Inspected connections for leaks - ok
6. Visually examine isolation valves for leaks.
- Inspected valves for leaks - ok
7. If fitted, perform pump low pressure auto-start test.
- Fireline low pressure auto start tested - ok
8. Perform pump minimum capacity test.
- Performed minimum capacity test - ok
9. Measure fire pump discharge pressure during pump minimum capacity test and record in RMS.
- Discharge Pressure 15.2 bar
10. Measure motor amps during pump minimum capacity test and record in RMS.
- Motor Amps - Port: 19.0 Amps Stbd: 19.5 Amps FWD: 480 Amps
11. Listen to Pump for excessive noise and vibration.
- Inspected excessive noise & vibration - normal
12. Make sure that the fire pump relief valves are set correctly.
- Relief valves set correctly

Done with Foam monitor testing

Marcello MM
C Murphy 1st Eng
Roundabout Tech Accounts

813.100 PUMPS AND TANKS FIRE FIGHTING SYSTEM Comments: Status: <Not Set>

813.111 Port Fire Pump, Engine Room Port Comments: Status: OK

813.115 Stbd Fire Pump, Engine Room Starboard Comments: Status: OK

813.121 Fwd Fire Pump, Aux Machinery Room Fwd Comments: Status: OK

Connected Resources

ID Description Quantity Act.Hours Hours rate Cost


ENOP 2nd Assistant Engineer 1,0 1,00 67.00 67.00
MOMA Motorman 1,0 2,00 50.00 100.00
STSL Chief Mate 1,0 2,00 88.00 176.00
TEAS 1st Assistant Engineer 1,0 2,00 75.00 150.00

Connected Documents

No Documents have been connected

Page 3 of 4
01. Corcovado, Work Done Report
Work Order: 2019-10224
12M Routine, Performance Test, Fire Pumps

Connected Spare Parts

No Spare Parts have been connected

Page 4 of 4