You are on page 1of 2

04.

Mykonos, Work Done Report


Work Order: 2019-01883
3M Routine Fire Pumps

Technical Account details

Tech Acc : 813.100 TA Description : PUMPS AND TANKS FIRE FIGHTING SYSTEM

Reference : | OI-SCS-0034-FG6 Location : Criticality : Safety Critical

Maker : SHI Makers No. : Serial No. : M813.100

Work Order details

Id : 2019-01883 Job class : Planned Maintenance Interval : 3 Month

Org Schedule : 813.C031 Job type : General Maintenance Duration : 1,0

Priority : High ( MUST not be delayed ) Department : Hull & Machinery Float : 0

Due date : 4/24/2019 Last done date : 1/24/2019 Scheduling : Dynamic

Status : Closed Created by : MPC Created date : 3/30/2019

Approved by : AAM Approved date : 4/30/2019 Printed date : 7/8/2020

Work Order description

1- Coordinate with STSL to complete together with 3M helideck foam routine (816.C080).
2- Flow test each fire pump through helideck monitors as follows:
- Use CCR control station for this test.
- Switch jockey pumps to manual.
- Switch redundant fire pumps to manual.
- Close foam valve.
- Open helideck monitors, the fire pump should start when the pressure drops at 6-7 bar.
- Check for leakages, excessive bearing temperature, noise and vibration.
- Record suction/discharge pressures and motor current in the attached log sheet.
- Continue test with other pumps.
- Upon completion ensure jockey pumps and all fire pumps are set to auto mode.

Remark: As per IMO Reg MSC.1/Circ/ 1432 para 7.1.2 "Flow test all fire pumps for proper pressure and
capacity."

Work done Report

Page 1 of 2
04. Mykonos, Work Done Report
Work Order: 2019-01883
3M Routine Fire Pumps
Done in conjuction with Weekly Test of Fire pumps.

Fwd Fire Pump:


· Suction: 0.4 Bar
· Discharge: 15 Bar
· Electric Motor current.: 455 Amps
Visual inspections - no leaks found, no vibrations, no noises.

PS Fire pump:
· Suction: 0.6 Bar
· Discharge: 14.5 Bar
· Electric Motor current.: 19.6 Amps
Visual inspections - no leaks found, no vibrations, no noises.

STBD Fire pump:


· Suction: 0.6 Bar
· Discharge: 14.5 Bar
· El motor current: 19.5 Amps
Visual inspections - no leaks found, no vibrations, no noises.

Fire hydrants were opened on several points around the deck for testing purpose.
Jockey pumps were kept in Auto all the time until Main pumps kicked in.
No leaks observed on the Fire Main after test run.
System is fully operation.

1AE- Doru. G, 2AE- Allan M, DPO- T. Emidio, John D. -CO

Roundabout Tech Accounts

813.100 PUMPS AND TANKS FIRE FIGHTING SYSTEM Comments: Status: <Not Set>

813.111 Port Fire Pump, Engine Room Port Comments: Status: OK

813.115 Stbd Fire Pump, Engine Room Starboard Comments: Status: OK

813.121 Fwd Fire Pump, Aux Machinery Room Fwd Comments: Status: OK

Connected Resources

ID Description Quantity Act.Hours Hours rate Cost


DPOP DPO 1,0 1,00 67.00 67.00
STSL Chief Mate 1,0 1,00 88.00 88.00
TEAS 1st Assistant Engineer 1,0 1,00 75.00 75.00

Connected Documents

ID Description Print on WO
813.FORM.002 3M PM Fire Pump Flow Testing Log Sheet No

Connected Spare Parts

No Spare Parts have been connected

Page 2 of 2