You are on page 1of 8

Enginering Calculation

DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

PT. SORIK MARAPI GEOTHERMAL POWER

ENGINEERING CALCULATION

Construction Unit III Foundation Power Plant Pad AA


36 MW & 6 MW (4th Package )

CONTRACT NO. SMGP -AGR - 1098 -21-06

Submitted By, Review By, Acknowledge By, Distribution

PT. SMGP : Original


PT. BCJ : Copy

Jhonny Heri Purwanto Arief Rachman


Project Control / Engineering Project Manager Engineering

Rev no Issue Date Brief of Revision

1/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

Calculation of Interaction Diagram ( Pedestal )

2/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

Calculation Grafik Interaction


K actual = 271 kg/cm2 As D19 @150 mm
fc = 22.5 mpa
fy = 360 mpa 4m Ast = 27 pcs x 0.25 x phi x 19 x 19 x 2
d' = 50 mm = 15,302.79 mm2
b = 4000 mm
h = 4000 mm As' As =As' = Ast/2
Ag( bxh ) = 1.6E+07 mm2 4m As =As' = 7,651.40 mm2
d (h-d') = 3,950 mm
ey = Fy/ES
ey = 0.0018 ἐs = 0.003 0.85 fc'
d' Cs
Cb a Cc
h d

Ts

ἐy = Fy/ES
0.003 0.002

A. Condtition 1 ( Axial Force ==> Momen = 0 )

Pn = 0.85 x fc' x ( Ag - Ast ) + Ast x Fy


= 0.85 x 22.5 x ( 1.6E+07 - 15,302.79 ) + ( 15,302.79 x 360 )
= 305,707,334.14 + 5,509,004.40
= 311,216,338.54 N
= 311,216.34 KN
Point 1 ( 0, 311,216.34 )

B. Condtition 2 ( Balance Fs =Fy )

Cb = 600 x 3,950
600 + 360

Cb = 2,468.75 mm

fs = 600 ( 3,950 - 2,468.75 )


2,468.75

fs = 600 ( 0.6 )
fs = 360 note : a= b x Cb b = 0.85
a= 2,098 mm
Cc = 0.85 x fc x a x b
Cc = 0.85 x 22.5 x 0.85 x 2,468.75 x 4000
Cc = 160,530,468.75 N
Cc = 160,530.47 Kn

Cs' = As' x ( fs'-0.85fc')


Cs' = 7,651.40 x ( ## - 19.125 )
Cs' = 2,608,169 N
Cs' = 2,608.17 KN
3/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

Ts = As x Fs
Ts = 7,651.40 x ##
Ts = 2,754,502.20 N
Ts = 2,754.50 KN

Pn = Cc + Cs - Ts
Pn = 160,530.47 + 2,608.17 - 2,754.50
Pn = 160,384.14 kn
Pn = 160,384.14 KN

Mn = Cc x ( h/2- a/2 ) + Cs x (h/2 - d') + TS ( d-h/2)


Mn = 160,530.47 x ( 2000 - 1,049.2 ) + 2,608.17 x ( 2000 - 50 ) + 2,754.5 ( 3,950 - 2000
Mn = 152,629,359.74 + 5,085,930.08 + 5371279.29
Mn = 163,086,569.11 Kn. mm
Mn = 163,086.57 KN. M

eb = Mn/Pn
eb = 1.02 M

Point 2 ( 163,086.57 , 160,384.14 )

C. Condtition 3 ( Compressive Control )


c> cb ==> c > 2,468.75 mm
take c = 3,000.00 mm

es' = 0.003 x c-d'


c
= 0.003 x( 3,000.00 - 50 )
3,000.00
= 0.002950 es'>ey 0.002950 > 0.0018
==>fs' = fy = 360 MPA

es = 0.003 x d-c
c
es = 0.003 x( 3,950.00 - 3,000.00 )
3,000.00
es = 0.000950 es'<ey 0.000950 < 0.0018
fs = es x ES
= 0.000950 x 200000
= 190.00

a = b x c ==> 0.85 x 3,000.00


a = 2,550.00 mm

Cc = 0.85 x fc' x b x a
= 0.85 x 22.50 x 4000 x 2,550
= 195,075,000.00 N
= 195,075.00 KN

Ts = As x Fs
= 7,651.40 x 190.00
= 1,453,765.05 N
= 1,453.77 KN

4/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

Cs = As' x Fs
= 7,651.40 x 360
= 2,754,502.20 N
= 2,754.50 KN

Pn = Cc + Cs - Ts
= 195,075.00 + 2,754.50 - 1,453.77
= 196,375.74 KN

Mn = Cc x ( h/2- a/2 ) + Cs x (h/2 - d') + TS ( d-h/2)


= 196,375.74 x ( 2000 - 1275 ) + 2,754.50 x ( 2000 - 50 ) + 1,453.77 x ( 3950 - 2000 )
= 142,372,409.43 KNmm + 5,371,279.29 Kn.mm + 2,834,841.85 Kn.mm
= 150,578,530.57 Kn.mm
= 150,578.53 Kn.M

e = Mn/Pn
e = 0.77 M

Point3 ( 150,578.53 , 196,375.74 )

D. Condtition 4 ( Tension Control )

c<cb ==> c < 2,468.75 mm


take c = 1,500.00 mm

es' = 0.003 x c-d'


c
= 0.003 x( 1,500.00 - 50 )
1,500.00
= 0.002900 es'>ey 0.002900 > 0.0018
==>fs' = fy = 360 MPA

es = 0.003 x d-c
c
es = 0.003 x( 3,950.00 - 1,500.00 )
1,500.00
es = 0.004900 es'>ey 0.004900 > 0.0018

==>fs' = fy = 360 MPA

a = b x c ==> 0.85 x 1,500.00


a = 1,275.00 mm

Cc = 0.85 x fc' x b x a
= 0.85 x 22.50 x 4,000 x 1,275
= 97,537,500.00 N
= 97,537.50 KN

Ts = As x Fs
= 7,651.40 x 360.00
= 2,754,502.20 N
= 2,754.50 KN

Cs = As' x Fs
= 7,651.40 x 360.00
= 2,754,502.20 N
5/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

= 2,754.50 KN

Pn = Cc + Cs - Ts
= 97,537.50 + 2,754.50 - 2,754.50
= 97,537.50 KN

Mn = Cc x ( h/2- a/2 ) + Cs x (h/2 - d') + TS ( d-h/2)


= 97,537.50 x ( 2000 - 637.5 ) + 2,754.50 x ( 2000 - 50 ) + 2,754.50 x ( 3950 - 2000 )
= 132,894,843.75 KNmm + 5,371,279.29 Kn.mm + 5,371,279.29 Kn.mm
= 143,637,402.33 Kn.mm
= 143,637.40 Kn.M

e = Mn/Pn
e = 1.47 M

Point4 ( 143,637.40 , 97,537.50 )

E. Condtition 5 ( Flexibel Pu = 0)

a = As x Fy
0.85 x Fc' x b

a = 7,651.40 x 360
0.85 x 22.5 x 4000

a = 2,754,502.20
76,500.00

a = 36.00656471 mm

Mn = As x Fy x ( d - a/2 )

Mn = 7,651.40 x 360 x ( 3,950 - 18.0033 )

Mn = 10,830,693,609.15 N.mm

Mn = 10,830.69 KN.M

Point5 ( 10,830.69 , 0 )

F. Table Interaction Mn & Pn ( Bending strength and Axial Compressive strength )

No Mn Pn
1 - 311,216.34 # ##
2 163,086.57 160,384.14 ## ##
3 150,578.53 196,375.74 ## ##
4 143,637.40 97,537.50 ## ##
5 10,830.69 - ## #

6/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

G. Diagram Interaction Curve

DIAGRAM INTERACTION
350,000

Point 1
300,000

point 3
Compression Nominal (Pn)

250,000

200,000
KN

150,000 Point 2

point 4 ,
100,000

50,000

Point 5
0
- 45,000 90,000 135,000 180,000

Momen Nominal (Mn)


KN.M

H. Calculation Of Load
Dimention of Concrete pedestal
B = 4m rbeton = 2.4 ton/m3
w = 4m
H = 2.5 m

1 Dead Load
DL = B x W x H x rbeton
DL = 4x 4x 2.5 x 2.4 t/m3
DL = 96 Ton
Dlu = 1.2 x 96
Dlu = 115.2 ton
Dlu = 1152 KN

2 Vessel Load
DLu vessel = 348 KN

3 Wind Load
Wlu = 65.8 KN.M

4 EQW Load
EQW = 585 KN.M

7/8
Enginering Calculation
DOC NO. SMGP-BCJ-WA0-ENG-CIVIL-VIII-22

Total Ultimate Load

Pu = Dead load + Vessel Load


= 1152 + 348
= 1,500.00 KN

Mu = Wlu + EQW
= 65.8 + 585
= 650.80 KN.M

DIAGRAM INTERACTION

350,000
Compression Nominal (Pn)

300,000

250,000
KN

200,000

150,000

100,000

50,000

0
- 45,000 90,000 135,000 180,000

Momen Nominal (Mn)


KN.M

Conclucion

PU & MU < Pn & Mn OK

Compresive strenght K - 300 ==> 24.9 mpa

Pipe Support
* Actual Average of compresive test = 299.10 kg/cm2 ==> 24.83 mpa ==> 99.7% > 75% Ok
Actual compresive test = 297.20 kg/cm2 ==> 24.67 mpa ==> 99.1% > 85% Ok
Footing pump barrel
* Actual Average of compresive test = 296.40 kg/cm2 ==> 24.60 mpa ==> 98.8% > 75% Ok
Actual compresive test 275.8 kg/cm2 ==> 22.89 mpa ==> 91.9% > 85% Ok