The Housing & Urban Development Department (H&UDD), Government of Odisha has ambitious
plans to scale up e-governance across 113 Urban Local Bodies (ULBs) in the State of Odisha. It aims to
enhance the citizen experience of public services by providing integrated, end-to-end services using a
comprehensive State-wide Service Delivery Infrastructure. Online Building Permission System (OBPS)
is one of the focus areas for the H&UDD to help all stakeholders and citizen get building plan
approvals through end to end automation of the processes involved.
Online Building Permission System (OBPS) envisages complete automation of all processes related to
building approval at Odisha. The building approval process involves private architects submitting
building plans as per the approved byelaws of the state of Odisha. The building plan submission
follows series of departmental approvals and NOCs from pre-defined departments in line with the
byelaws of Odisha. All the processes and steps including calculation of fee, payment of fee, receipt of
approval for the permission and certificates etc would be delivered online through an integrated one
stop solution. Citizen would not be required to visit any of the external departments such as AAI,
NMA, Fire etc for NOCs as the solution has the potential to bring integrated experience.
DIGIT - Online Building Permission System (OBPS) shall enable local government to bring in
transparency, accountability and time-bound service for the public. With DIGIT - OBPS, professionals
like architects, engineers, supervisors can seek permission for construction of a building for any Urban
Local Body / District Town and Country Planning / Centre for Municipal Administration with a
speedy, hassle-free and user-friendly procedure, online.
• It is instructed to the architects to keep all the layers and details in the drawing as per ODA
Bye Laws standards. Over and above this, prepare drawing for features scrutiny in dxf format
as per this drawing manual. The layers drawn for Auto Scrutiny should be drawn
overlaid/Superimposed on top of the base drawing. It is recommended to freeze the layers
that may not be relevant while preparation of drawing.
Deviation from above mentioned settings will get the drawing rejected by the scrutiny system.
Guard Room
Draw polygon around 1
Guard Room
Electric Cabin
Draw polygon around 2
Electric Cabin
Sub-Station
Draw polygon around 3
Sub-Station Optional as
ACCBLK_n_UNIT_n
Area for Generator per design
Draw polygon around 4
Area for Generator Set
ATM
Draw polygon around 5
ATM
Other Amenity
Draw polygon around 6
Other Amenity
Vehicular Draw as polygon on
BLK_n_FIRE_TENDER_MOVEM Mandatory
20 access access road within site 7
ENT as per rule
within Site for each building block
CDP proposed drain
affected area
Draw polygon and Optional as
2
Width dimension on per design
site plan outlining the
affected area
Proposed road
affected area
Draw polygon and Optional as
3
Width dimension on per design
site plan outlining the
affected area
CDP proposed road
Road/Drain affected area
21 AFFECTED_LAND_AREA Draw polygon and Optional as
widening 4
Width dimension on per design
site plan outlining the
affected area
Road widening
affected area
Draw polygon and Optional as
5
Width dimension on per design
site plan outlining the
affected area
Area left for
restricted area
Optional as
Draw polygon on site 6
per design
plan outlining the
affected area
Layers to be drawn on the Floor Plans
As per
Draw as polygon on
Sub - Mandatory
BLK_n_FLR_n_BLT_UP_AREA each floor outlining
FAR Occupa as per rule
build up area
(Proposed ncy type
1 Draw as polygon on As per Mandatory
Constructio
n) BLK_n_FLR_n_BLT_UP_AREA_ each floor outlining Sub - as per rule
DEDUCT build up area for FAR Occupa
deduction ncy type
As per
FAR Draw as polygon on
BLK_n_FLR_n_BLT_UP_AREA_ Sub - Mandatory
(Existing each floor outlining
EXISTING Occupa as per rule
Constructio existing build up area
ncy type
n)
2 Draw as polygon on As per Mandatory
: For
each floor outlining Sub - as per rule
Addition & BLK_n_FLR_n_BLT_UP_AREA_
existing build up area Occupa
Alteration EXISTING_DEDUCT
for FAR deduction ncy type
service only
Approved
Existing
Constructio Draw as polygon on
BLK_n_FLR_n_APPROVED_CON Mandatory
3 n : For each floor outlining 7
STRUCTION as per rule
Addition & approved existing area
Alteration
service only
Demolition
Area : For Draw as polygon on
BLK_n_FLR_n_DEMOLITION_A Optional as
4 Addition & each floor outlining 7
REA per design
Alteration demolition area
service only
As per
Draw carpet area of
Sub - Mandatory
BLK_n_FLR_n_CARPET_AREA each floor using
Occupa as per rule
polygon
ncy type
5 Carpet Area
As per
Draw carpet area of
BLK_n_FLR_n_CRPT_AREA_DE Sub - Mandatory
each floor using
DUCT Occupa as per rule
polygon
ncy type
Draw as polygon Mandatory
6 Roof Area BLK_n_FLR_n_ROOF_AREA 7
outlining Roof area as per rule
HMV - 2 way
-Draw polygon around
Vehicular Ramp Optional as
6
-Add Slope in same per design
layer with Mtext -
SLOPE=1IN8
Fire tender
-Draw polygon around
Vehicular Ramp Optional as
8
-Add Slope in same per design
layer with Mtext -
SLOPE=1IN10
Draw polygon around
Interior BLK_n_FLR_n_COURTYARD_IN Mandatory
14 interior open space on 7
open space NER as per rule
each floor
Mandatory
where
Draw polygon with RGB habitable
Light and BLK_n_FLR_n_ROOM_n_LIGHT
15 dimension of window 19,155,7 room
Ventilation _VENTILATION_n
on the floor plan 2 (Naturally
Ventilated)
is provided
Draw polygon outlining
Solar photo Solar Panels to mention
Mandatory
16 voltaic SOLAR_PANEL location and provide 3
as per rule
Panels Generation capacity in
Plan Info
Draw polygon outlining
Solar water Solar Water Heater to
Mandatory
17 heating SOLAR_WATER_HEATER mention location and 7
as per rule
system provide capacity in LPD
in Plan Info
General Lift
Mandatory
Draw polygon to mark 1
as per rule
lift location
Lift for Physically
Disabled Mandatory
18 Lifts BLK_n_FLR_n_LIFT_n 2
Draw polygon to mark as per rule
lift location
Car Lift
Optional as
Draw polygon to mark 3
per design
lift location
Owner's
Draw as polygon for Mandatory
19 Society BLK_1_FLR_0_UNITFA 8
Owner's Society Office as per rule
Office
Draw as polygon on
floor outlining build up Optional as
20 Outhouse BLK_n_FLR_n_BLT_UP_AREA 100
area of the outhouse per design
block
Draw as polygon on
Public floor outlining build up
Mandatory
21 Washroom BLK_n_FLR_n_BLT_UP_AREA area of the Public 101
as per rule
Complex Washroom Complex
block
Chajja/Proje Draw as polygon on
Optional as
22 ctions over BLK_n_FLR_n_CHAJJA each floor outlining 7
per design
setback Chajja/Projections
Draw as polygon for Mandatory
3
Common Water closet as per rule
23 Water Closet BLK_n_FLR_n_WATER_CLOSET
Draw as polygon for Mandatory
2
Female Water closet as per rule
Laundry Room
Stilt Floor
Draw polygon for Stilt
Floor on floor plan
BLK_n_FLR_n_REGULAR_ROO Optional as
3 Stilt Floor Draw dimension of 38
M_n per design
room height for
respective room in
sectional elevation
Service Floor
Draw polygon for
Service Floor on floor
Service BLK_n_FLR_n_REGULAR_ROO plan Optional as
4 39
Floor M_n Draw dimension of per design
room height for
respective room in
sectional elevation
Draw polygon for
Mezzanine Floor on
floor plan (Room
number should be same
As per
as the respective
Mezzanine BLK_n_FLR_n_ROOM_n_MEZ_ Sub - Optional as
5 regular room under
Floor AREA_n Occupa per design
which the mezzanine
ncy type
floor is present)
ICT
Draw as polygon on
landing Mandatory
6 floor outlining Fire 1
Point as per rule
Doors in the ICT room
Provision
ICT_LANDING_POINT_n_DOOR
_n
Staircase Mandatory
Headroom/ Draw dimension of where
4 BLK_n_STAIR_HEADROOM 7
Flight Staircase Headroom staircase is
Headroom proposed
Public/Institutional
Public-Semi
78 Theatre 143
Public/Institutional
Public-Semi
79 Administrative Buildings 144
Public/Institutional
Public-Semi
80 Government offices 145
Public/Institutional
Public-Semi
81 Local and semi Government offices 146
Public/Institutional
Public-Semi
82 Police/Army/Barrack 147
Public/Institutional
Public-Semi
83 Religious Building 148
Public/Institutional
Public-Semi
84 Social and welfare centers 149
Public/Institutional
Public-Semi
85 Clinic 150
Public/Institutional
Public-Semi
86 Dispensary 151
Public/Institutional
Public-Semi
87 Yoga Center 152
Public/Institutional
Public-Semi
88 Diagnostic Centre 153
Public/Institutional
Public-Semi
89 Govt-Semi Govt. Hospital 154
Public/Institutional
Public-Semi
90 Registered Trust 155
Public/Institutional
Public-Semi
91 Health center 156
Public/Institutional
Public-Semi
92 Hospital 157
Public/Institutional
Public-Semi
93 Lab 158
Public/Institutional
Public-Semi
94 Maternity Home 159
Public/Institutional
Public-Semi
95 Medical Building 160
Public/Institutional
Public-Semi
96 Nursing Home 161
Public/Institutional
Public-Semi
97 Polyclinic 162
Public/Institutional
Public-Semi
98 Rehabilitation Center 163
Public/Institutional
Public-Semi
99 Veterinary Hospital for pet animals and birds 164
Public/Institutional
Public-Semi
100 Research and Training Institute 165
Public/Institutional
Public-Semi
101 Police Station 166
Public/Institutional
Public-Semi
102 Fire Station 167
Public/Institutional
Public-Semi
103 Jail/Prison 168
Public/Institutional
Public-Semi
104 Post Office 169
Public/Institutional
105 Public Utility Bill Collection Center 210
106 Public Utility Broadcasting-Transmission Centre 211
107 Public Utility Burial and cremation grounds 212
108 Public Utility Public Distribution System Shop 213
109 Public Utility Public Toilets in Public Area 214
Submitted by PwC Page 18
Drawing Manual - OBPS
NUMBER_OF_OCCUPANTS_OR_US
describes the occupant
ERS_OR_BED_BLK_1
load in a building/number
of occupants using the
NUMBER_OF_OCCUPANTS_OR_US Numeric value. Eg.
11 building or the Number of
ERS_OR_BED_BLK_2 4,5,10 etc.
Beds in a Hospital/
Number of Students in
NUMBER_OF_OCCUPANTS_OR_US
educational Building
ERS_OR_BED_BLK_n
IS_THE_PLOT_PART_OF_THE_LAY
OUT_APPROVED_BY_THE_AUTHO
RITY_OR_DEVELOPED_AND_ALLO
For identification whether
TTED_BY_THE_GOVERNMENT_OR
12 project is Low Risk or YES/NO
_STATUTORY_BODIES_OR_IS_A_F
Other Than Low Risk
INAL_PLOT_IN_TOWN_PLANNING
_SCHEMES_OR_DEVELOPMENT_S
CHEMES
RESIDENTIAL USE
ZONE
RETAIL
COMMERCIAL &
BUSINESS USE
ZONE
WHOLESALE
COMMERCIAL USE
INDUSTRIAL USE
ZONE
PUBLIC & SEMI-
PUBLIC USE
ZONES
UTILITY &
Land Use of the proposed SERVICE USE
14 LAND_USE_ZONE
project ZONE
OPEN SPACE USE
ZONE
TRANSPORTATION
USE
AGRICULTURE &
FOREST USE ZONE
WATER BODIES
USE ZONE
SPECIAL
HERITAGE ZONE
ENVIRONMENTAL
LY SENSITIVE
ZONE
NA
For identification whether
building or part of a
building which is used for
the storage, handling,
IS_BUILDING_UNDER_HAZARDOU
15 manufacture or processing YES/NO
S_OCCUPANCY_CATEGORY
of highly combustible or
explosive materials or
products which are liable
to burn with extreme
Submitted by PwC Page 22
Drawing Manual - OBPS
rapidity or producing
poisonous fumes, or the
storage, handling,
manufacturing or
processing of which
involves highly corrosive,
toxic, obnoxious alkalis,
acids or other liquids,
gases or chemicals,
producing flame, fumes
and explosion, poisonous
irritant or corrosive gasses
and for the storage,
handling or processing of
any material producing
explosive mixture of dust
or which result in the
division of matter into fine
particles subject to
spontaneous ignition and
includes petrol filling
stations
Is building having
IS_BUILDING_CENTRALLY_AIR_C
16 Centrally Air Conditioned YES/NO
ONDITIONED
system
Benchmark Value of Land
PER_ACRE_BENCHMARK_VALUE_
(Per Acre) needed if
OF_LAND_NEEDED_IF_PROJECT_ Numeric value with
17 project is having
IS_HAVING_PURCHASABLE_FAR_ decimal/NA
Purchasable FAR
COMPONENT
component
Distance of DA parking
space from Building DISTANCE_OF_DA_PARKING_SPA Numeric value with
18
entrance (If DA Parking is CE_FROM_BUILDING_ENTRANCE decimal/NA
Mandatory)
Total Parking area if TOTAL_PARKING_AREA_IF_PROJE
project has off site parking CT_HAS_OFF_SITE_PARKING_PRO Numeric value with
19
provision within 300 VISION_WITHIN_300_METERS_FR decimal/NA
meters from project Site OM_PROJECT_SITE
Applicable if Project is STAR_RATING_FOR_HOTEL_PROJ
20 1/2/3/4/5/NA
Hotel ECT
MINIMUM_DISTANCE_OF_PROPE
Applicable for Both Petrol Numeric value with
25 RTY_LINE_FROM_THE_CENTRE_L
Pump Sub occupancy only decimal/NA
INE_OF_THE_ROAD
Does building have more DOES_PROJECT_HAVE_MORE_TH
26 than 10000 litres of Waste AN_10000_LITRES_OF_WASTE_W YES/NO
Water discharge per day ATER_DISCHARGE_PER_DAY
Mandatory For All TOTAL_CONNECTED_LOAD_OF_T Numeric value with
27
Occupancy HE_PROPOSED_PROJECT_IN_W decimal
Capacity in W if Solar MINIMUM_GENERATION_CAPACIT
Numeric value with
28 Photo voltaic system is Y_OF_THE_ROOFTOP_SOLAR_PV_
decimal / NA
mandatory for project SYSTEM_IN_W
Capacity in LPD if Solar
CAPACITY_OF_SOLAR_WATER_HE Numeric value with
29 water heating system is
ATING_SYSTEM_IN_LPD decimal / NA
mandatory for project
Does project have low DOES_PROJECT_HAVE_LOW_WAT
30 water consumption and ER_CONSUMPTION_AND_PLUMBI YES/NO/NA
plumbing fixtures? NG_FIXTURES
Does project have
DOES_PROJECT_HAVE_REDUCED
31 reduction in Hardscape YES/NO/NA
_HARDSCAPE
provision
Does project have low DOES_PROJECT_HAVE_LOW_ENE
32 energy consumption RGY_CONSUMPTION_LIGHTING_F YES/NO/NA
lighting fixtures? IXTURES
Does project have energy DOES_PROJECT_HAVE_ENERGY_E
33 YES/NO/NA
efficient hvac system? FFICIENT_HVAC_SYSTEM
Does project have lighting DOES_PROJECT_HAVE_LIGHTING
34 of common areas by solar _OF_COMMON_AREAS_BY_SOLAR YES/NO/NA
energy or led devices? _ENERGY_OR_LED_DEVICES
Does project have
DOES_PROJECT_HAVE_SEGREGAT
35 segregation of waste YES/NO/NA
ION_OF_WASTE_PROVISION
provision?
Does project have organic DOES_PROJECT_HAVE_ORGANIC_
36 waste management WASTE_MANAGEMENT_PROVISIO YES/NO/NA
provision? N
Does the Project requires DOES_THE_PROJECT_REQUIRE_N
37 NOC from AAI as per the OC_FROM_AAI_AS_PER_THE_COL YES/NO
Colour Coded Zone Maps OUR_CODED_ZONE_MAPS
Is project located within IS_THE_PROJECT_LOCATED_WIT
300 meters distance of HIN_300_METERS_DISTANCE_OF
38 YES/NO
Centrally Protected _THE_CENTRALLY_PROTECTED_
Monument MONUMENT
IS_THE_PROJECT_LOCATED_WIT
Is project located within
HIN_300_METERS_DISTANCE_OF
39 300 meters distance of YES/NO
_THE_STATE_PROTECTED_MONU
State Protected Monument
MENT
Is project located within IS_THE_PROJECT_LOCATED_WIT
40 200 mts from strategic HIN_200_METERS_FROM_STRATE YES/NO
buildings GIC_BUILDINGS
Is proposed construction IS_PROPOSED_CONSTRUCTION_N
next to flood embankment EXT_TO_FLOOD_EMBANKMENT_A
41 YES/NO
and applicant wants to ND_DOES_APPLICANT_WANT_TO_
have direct access from the HAVE_DIRECT_ACCESS_FROM_TH
Submitted by PwC Page 24
Drawing Manual - OBPS
IS_SECURITY_DEPOSIT_REQUIRE
52 Is security deposit required YES/NO
D
Applicable if project has
IS_BLOCK_1_HAVING_ENTIRE_FA
53 Building Block with entire YES/NO
CADE_IN_GLASS
façade made of Glass
PROJECT_VALUE_IN_INR_IF_EID
Applicable if EIDP fee is Numeric value with
54 P_FEE_IS_APPLICABLE_FOR_PROJ
applicable for project decimal / NA
ECT
Applicable if the project is IS_THE_PROJECT_BY_STATE_GOV
55 by State Govt or Central T_OR_CENTRAL_GOVT_OR_GOVT YES/NO
Govt or Govt Undertaking _UNDERTAKING
Number of temporary NUMBER_OF_TEMPORARY_STRUC
Whole numeric
56 structures if any present at TURES_IF_PRESENT_AT_THE_SIT
value /NA
site E=Whole numeric value /NA
HAS_PROJECT_PROVIDED_MIN_1
Applicable if project is
0_PER_BUA_FOR_EWS_WITHIN_5
57 required to provide EWS YES/NO
_KM_FROM_PROJECT_SITE=YES/
provision
NO
ADDITIONAL_TDR_IF_APPLICABL
Applicable if project has Numeric value with
58 E_M2=Numeric value with
TDR provision decimal/NA
decimal/NA
Is the project by State IS_THE_PROJECT_BY_STATE_GOV
59 Government or Central T_OR_CENTRAL_GOVT_OR_GOVT YES/NO
Government undertaking _UNDERTAKING=YES/NO
A1. Provide the information required in PLAN_INFO Layer with following considerations:
• Write all the text in PLAN_INFO layer after ‘=’ and ‘space’. For eg. PLOT_AREA_M2= 500
instead of PLOT_AREA_M2=500
• Write all the text without any applicable units. For eg. PLOT_AREA_M2= 500 instead of
PLOT_AREA_M2= 500sqm etc.
• Write all the text in Capitals. For eg. ROAD_WIDTH
• Write sector number in format SECTOR_NUMBER= 23D instead of
SECTOR_NUMBER=23-D or SECTOR_NUMBER= 23 D or SECTOR_NUMBER= 23d
• Write the projected total number of building users in the format
NUMBER_OF_OCCUPANTS_OR_USERS_OR_BED_BLK_1= 5
• Put the responses in the PLAN_INFO layer with response YES or NO or NA instead of Yes or
No or na.
Purchasable FAR Fee – will be calculated based on the Per acre Benchmark Value of land to be
provided in plan info and using Built Up Area layer with color as per Sub Occupancy
A4. Complete the drawing as per standards and guidelines required by ODA Bye Laws. The drawing
should be completed as submission drawing formats. Use drawing scale 1:1 only. During or before
preparation of drawing, make the UNITS settings - Meter and length type Decimal in the software
(e.g. AutoCAD). Length type in primary units of dimension style shall be updated to Decimal.
Copy and Paste the Plan Info and required layers from the Drawing Template (provided
in the resource section) and follow guidelines in the Drawing manual to start drawing
preparation for Auto-scrutiny.
A6. One can open the .dxf file, that was uploaded for scrutiny, in the drafting software that was used
for drawing preparation (eg. Autocad) make the modifications in the drawing as per the scrutiny
report. After update of drawing, one can resubmit the drawing for scrutiny.
A7. After creation of the required setback layers with correct colour codes, draw closed polygons along
the entire length of the front, rear, left and right sides of each building blocks.
The setback layer polygon drawn should have edges falling/coinciding with both the Plot area Polygon
and the respective Building Footprint Polygon.
Q7. How To correctly name Polygons for Lifts, Ramps etc that have
numbers at the end of the layer name?
A7.If multiple polygons needs to be created for features such as Lifts and Ramps that have different
colour codes assigned to them based on different use types, Follow the bellow guidelines-
• Name all the required layers with consecutive numbers at the end keeping with common color
code to denote the same use type.
• If multiple use types are required to be drawn, then each group of layers with common colour
code will have the numbers starting from 1 to the required number.