ELEVATIONS C

Residential Building Specifications Date :24-03-2022


Client – Bhuvaneshwari
Plot area –30x40
Location- Naragunda, Hubli.

Package @ 2000Rs/Sqft
➢ FOUNDATION
▪ Foundation Work Will Be Done as Per Structural Design
▪ Foundation will be provided with size stone masonry
▪ Fe 500 steel using for all Columns, beams, slab...etc.
▪ M20 grade concrete for footings, plinth beams, coloumns, & slab
▪ PCC (plain cement concrete)4’’ thickness
▪ Footing , columns & slab concrete done by design mix(hand mix) or readymade concrete
▪ All excavation works including quote. footing, foundation excavation and refilling and soil
compaction.
❖ Cement-Rs 500/-
Birla,Ultratech,Barathi,Ramco,birlasakthi,nagarjuna,zuari,karthik,priya,ACC.
❖ Steel- Rs 95000/-
Prime Gold,A-one gold, kamadheneu, gopala, meenakshi
➢ STRUCTURE
▪ Coloumn,beams,slab,and walls as per structural
▪ Columns and beams sizes ,9”x18”
▪ Main walls 6” Brick wall
▪ All partition walls 4” Brick wall
▪ Reinforcement as per structural design.3.0kg per sft
▪ Jack/bamboo - sheet shuttering
▪ Roof height 10ft including roof thickness
▪ Using fine quality m-sand for wall built and concreting in all portions
▪ Using fine quality water wash p-sand for all plastering works.
▪ M20 grade concrete for footings, plinth beams,colouns,& slab
▪ Lintel & chazza will be provided wherever required
▪ Parapet wall 3ft with solid concrete block wall
▪ Dr.fixit Waterproof cement finishing on roof top.
❖ Cement-Rs 500/-
Birla,Ultratech,Barathi,Ramco,birlasakthi,nagarjuna,zuari,karthik,priya,ACC.
❖ Steel- Rs 95/-
A-one gold, kanadheneu, gopala, meenakshi

Page 1 of 5
29 First floor, Giri Chaya building, opposite : Mahaveer king’s place, Jr College Rd, Kadugodi, Bengaluru, 560067
ELEVATIONS C

➢ PARKING
▪ 8000 litre underground sump, with Brick/block wall.(included)
▪ Compound wall 5ft from floor finishing level.
▪ Good design Ms main gate
▪ Parking tiles in parking areas. Tile basic price 50/-
❖ Make – Somany/orient-bell/cera
➢ TILE WORK
▪ Wash rooms wall tiles upto 7ft.
▪ Wash room’s floor antiskid tiles.
▪ Waterproofing for all bathroom sunken & utility areas.
▪ Sunken portions filling with lightweight cinder along with 4” concrete.
▪ Granite for living, dining, bedroom and kitchen. Basic price.120/-
▪ For balcony antiskid tiles.50/-
▪ Above kitchen slab wall tile upto 4ft.
▪ Staircase steel grey/sadhalli granite .basic price 80/-
▪ Kitchen slab 40/20mm granite. Basic price 120/-sft
▪ Stainless steel sink basicprice.rs 4000/-
▪ cera sink faucet basic price Rs 2000/-
▪ Other faucet & accessories will be ISI marked.
❖ Make – so many/orient-bell/cera
❖ Granite 120/- and wall tile basic price 65/-
➢ PLUMBING WORK
▪ In each bathroom having
▪ Wall mixer (2 in 1) --1nos
▪ Head shower-- 1nos
▪ Washbasin --1nos
▪ Floor mounted comould-1nos
▪ Health faucet--1nos
▪ Solar & geyser points
▪ Towel rod & corner shelves
▪ Waterline piping – CPVC
▪ Sanitary wastewater piping – PVC
▪ Overhead tank --2000ltr
▪ All continental model CP fixtures.
▪ Sanitary ware CP fittings will be rs.18,000/-each. Any additional will be prorate basic.
❖ CP make—jaguar/ess ess, parry ware, and cera, equalent.
❖ Cpvc&pvc – supreme,ashirwad,any other equalent quality
❖ Tank – ganga,cauvery,supreme
❖ Sump motor – suguna/texmo/cri

Page 2 of 5
29 First floor, Giri Chaya building, opposite : Mahaveer king’s place, Jr College Rd, Kadugodi, Bengaluru, 560067
ELEVATIONS C

➢ ELECTRICAL WORK
▪ Providing sufficient light ,fan and power points in all rooms living, dining,
bedrooms, kitchen,restrooms,balcony,parking,store room etc….
▪ Using good quality ISI marked conduits
▪ Providing meter board & main cable
▪ Switch and sockets all modular type
▪ Back box- metal box
❖ Conduits—VIP,equalent
❖ Switchnchor, finolex, polycab, equalent.
❖ Switch sockets—Anchor Roma,GM,HI-FI
❖ Distrubion boards – Indoasian/legrand/Schneider
➢ WINDOWS & DOORS
▪ Upvc windows 2.5track with mesh .basic price 400/- per sft.
▪ Main door frame 3.5” x 7.0” teak frame thickness 125mm x 100mm
Main door teak door 35mm thickness with Europa lock and SS hinges,SS
handle. Worth of rs.20000/- including fittings.
▪ Bedroom door salwood frame 3.0” x 7.0” thickness 100mm x 75mm. Bedroom doors
flush door, primer door, membrane doors thickness 30mm with mortise lock or
cylindrical lock with hardware SS hinges,ss handle. Worth of rs.8000/- including fittings.

➢ PAINTING
▪ Interalpainting-Premium emulsion
1coat primer
2coat Birla/jk wall putty
2coat emulsion
▪ External painting-Apex
1coat primar
2coat emulsion
▪ Enemal paints
1coat oil base primar
2coat enamel paints
❖ Make –Asian paints
➢ FABRICATION
▪ Ms railings for stairs and balcony
▪ Ms Gate

Page 3 of 5
29 First floor, Giri Chaya building, opposite : Mahaveer king’s place, Jr College Rd, Kadugodi, Bengaluru, 560067
ELEVATIONS C

➢ ARCHITECTURAL
▪ Floor plan 2d
▪ Sketch up elevation
▪ Structural dwg
▪ Electrical and plumbing dwgs
❖ Free of cost

➢ EXCLUSIONS
▪ Eb temporary & permanent power supply & bills
▪ Bwssb temporary and permanent connections bills
▪ Bore well& pump sets & lift & generator & ups & light fixtures
▪ Other than boundary line works
▪ Water for construction
▪ Any architectural high cost elements/cladding
▪ Niches sloped roofs
▪ Compound wall & Main gate
▪ Hardrock and blastings While excavations

Page 4 of 5
29 First floor, Giri Chaya building, opposite : Mahaveer king’s place, Jr College Rd, Kadugodi, Bengaluru, 560067
ELEVATIONS C

TERMES AND CONDITIONS

*Rate Rs.2100/-per sq ft. measured of the actual roof casted area including staircase. Any projections will be charged extra as per scope of work in sq.
ft. Basic
*Extra charges for helical/circular staircase to be charged extra 1000Rs/sft
*Excavation considered would be for footing requirements, if in case of any additional debris additional cost to be paid by owner/client

*Structural will be designed for floors to be built,if in case structural has to be done for additional floor, structural design cost and footing cost would
be additional
*Architect drawings to be provided in stages to the contracting company during construction, which will be a base line for design, material and
finishing specifications. Any other exclusively mentioned here means it is good to be covered in the Architect specifications provided by Architect
during construction stages.
*Interior design plan and implementation/execution will be done by the contractor
*Tapered roof area will be charged extra at Rs.700/sft
*wall niches shall be provided as per the Architects plan and design

*The extra works charges shall be billed & paid as and when the extra work is completed at each stage as per agreed rates
*Total Built up area would be measured once milestone is completed and billed accordingly. In case of extra built up area, client to pay per actual
measurement
*Govt. Taxes inclusive. Service Tax @18% of the total project cost

*During the timeframe of construction, any variability in material costs in scope will not affect the total agreed upon proposal costing
*Labour sheds will be constructed on the premises for the duration of construction
*DELAYS/STRIKES : In any financial year there one might come across Sand/Lorry/ Bandh/Festivals/Transport/other Strikes due to which might affect
the scarcity of construction labours or building materials. In these scenarios major construction material like sand, Cement, Jelly,steel etc might be
sold at very premium rates which might lead to slight delay. These Scenarios might be present from 3 to 15 days. The client needs to bear premium
different amount other than the mentioned basic costs

*During the construction work no third party workers other than the appointed building contractors will work in the site. In case the client appoints
any outside contract works other than the duly signed works in the contract or agreement duly signed between the Client/Owner and the Company. In
such scenarios any damages or loss of material will liable directly to the client/owner.

*PAYMENT: In the field of construction nearly 60% of the cost will be towards the purchase of building material,30% for the payment of labour and
10% for miscellaneous works. The responsibility of a client is to pay on time at every stage of construction as agreed and accepted based on the slabs
in advance on time. Failing to do will lead into stoppage of work on site. As the contractor needs to clear the credit bill of the employed Labours and
construction materials purchased within a week.

*Any other specification not exclusively mentioned here means it is good to be covered in the Architect specification provided by Architect during
construction stages.
*Payment has to be made in pre paid basis as agreed and signed in contract agreement

*At any point during construction phase if in case owner needs clarity on the work or any mistakes found are to be communicated to office or bring it
to site engineers notice in a polite manner. Our team address such issues in a right way
*This contract is a turnkey proposal hence all products & Materials as specified in the contract will be procured by the contracting company only

*paint colour selection and other selections which is under the scope of architecture work will be decide by architecture only.

*Landscaping, Chimney, Hob will be charged Extra.

Page 5 of 5