Ipd Bacan Pit Yakut: Daily Plan Form
Ipd Bacan Pit Yakut: Daily Plan Form
AKG-MIN-MO-203
Tgl Penerbitan: 21-January-2016
1 CAT 6015B CAT 6015B-110 HD 7 NO YES YES 650 B-07 DISPOSAL KARET 300 0 0 8840
2 HITACHI 1200 Hitachi 1200-47 HD 5 NO YES YES 500 B-12 OPD B 1.500 0 0 6400
3 SANY 750 SANY 750-88 ADT 3 NO YES YES 350 B-02 OPD B 450 0 0 4480
4 CAT 374F CAT 374F-107 ADT 4 NO YES YES 350 B-08 DISPOSAL KARET 300 0 0 4760
5 SANY 750 SANY 750-84 ADT 3 NO NO YES 350 BACAN OPD B 300 0 0 4480
6
8
9
10
DAILY COAL PRODUCTION PLAN 28960 BCM
EXCA No
IPD BACAN 117 LOADER UNIT ID TYPE HAULER PIT BLOCK CLEANING GRADING PDTY DISTANCE SEAM INSPECTION PROD.
116 MTD PLAN MTD ACT MTD ACH DAILY ACH PROD PLAN PROD ACT MTD PLAN MTD ACT MTD ACH DAILY ACH PROD. PLAN PROD. ACT MTD PLAN MTD ACT. DEVIATION
No 346.968 366.443 106% 115% 20.736 23.928 73.142 59.412 81% 157% 2.254 3.549 4,74 6 130%
EXCA EXCA 47
117 IMPROVEMENT
OPD A EXCA 107 1 PUMPING BLOK 12
2 PEMBUATAN SETTLING POND PIT YAKUT
3 SPREADING SOIL IPD SAFIR (LAHAN BUSTAMIN DAN LARANG)
EXCA
110 4 PEMBUATAN PARKIRAN DI AREA WC PORTABEL
5 CONTINUE SPREADING SOIL IPD KARET KE ARAH BENCH PERTAMINA
OPD B 6 PEMASANGAN PITA UNTUK PEMBUATAN SETTLING POND DI PIT YAKUT
EXCA 88
7 PEMINDAHAN MCC KE PIT YAKUT
8 PERCEPAT PERBAIKAN WT 01 PRODUKSI
EXCA
EX-R 02 9 PERCEPATAN FINALISASI PIT BACAN ARAH SELATAN
10 DRUM-DRUM BEKAS OLI DI WORKSHOP LAMA
EXCA 84 DISPOSAL KARET
11 PELEBARAN JALAN HOULING SIMPANG 4 BOSANG MMC PROSES PEMBEBASAN DAN DI BUAT KAN PONDOK
12
13
NO UNIT DIGGER OB REMOVAL 14
1 EX88 CONTINUE STRIPPING KE ARAH BARAT BLOK 4 15
4 EX84 LOADING OB SEAM 8 PIT BACAN 18 Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by: Agreed by:
5 EX47 CONTINUE STRIPPING KE ARAH CROPLINE SEAM 3 BLOCK 3 & 4 19
NO UNIT GENERAL 20
1 EX-R 02 CLEANING SEAM 3 BLOK 12
3 EX-R 01 CLEARING BLOCK 8
4 EX-R 03 CLEANING SEAM 7 DAN 8 PIT BACAN PIT ENGINEERING ENGINEERING PRODUKSI HAULING SHE PLANT HRD & GA LOGISTIC
INVENTORI COAL