- Boiler: 13 Person
Engineer Spesialist - Air Heater : 07 Persons
- Memelihara Fan: 02 Persons
- Memelihara heat exchanger: 02 Persons
- Memelihara HRSG : 05 Persons
- Memelihara Kompresor : 10 Persons
- Memelihara Valve : 17 Persons
- Memelihara pompa : 37 Persons
- Memelihara sistem Hidraulik dan Penumatik : 12 Persons
- Memelihara Turbin Gas : 29 Persons
- Memelihara Turbin Uap : 20 Persons
- Memelihara Generator : 16 Persons
- Memelihara Instalasi Switchgear : 19 Persons
- Memelihara Proteksi/relay : 08 Persons
- Memlihara listrik tenaga : 16 Persons
- Memelihara Motor : 21 Persons
- Memelihara Transformator : 14 Persons
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Man-Power & Certifications
Specialist Certifications/Capabilities
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Steam Turbine Overhaul Gas Turbine Overhaul
<<1000 MW <<400 MW
E.g.: E.g.:
1. Harbin 660 MW 1. Mitsubishi MF701F5 336 MW
2. Mitsubishi 701F 257MW
2. Toshiba 400 MW
3. Alstom GT 13E2 145 MW
3. Harbin 330 MW 4. Siemens V942 143 MW
4. Dongfang 315 MW 5. Siemens V94.2 120 MW
5. Mitsubishi 200 MW 6. General Electric GE MS9001E 107
6. Toshiba 200 MW MW
7. Toshiba 100 MW 7. Mitsubishi MW 710D 100 MW
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Generator
HRSG E.g.:
E.g.: 1. ABB Generator Stator Air Cooled
1. MITSHUBISHI HEAVY INDUSTIES 370 MW 2. ABB Generator Stator Hydrogen Cooled
2. CMI BELGIUM 100MW 3. Alstom Generator Stator Air Cooled
3. ABB 180 MW 4. Beijing Beizong H2 cooling Generator
4. MHI 70 & 125 MW 5. Brush Generator Stator Air Cooled
5. GE 100 MW 6. Dongfang Generator Stator Hydrogen Cooled
7. Harbin Generator Stator Hydrogen Cooled
8. Mitsubishi Electric Generator Stator
Hydrogen Cooled
9. Siemens Generator Stator Air Cooled
10. Toshiba Generator Stator Hydrogen Cooled
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
TIM SPESIALIS
TIM TIM DISASSEMBLY ASSEMBLY DRY ICE BLASTING
BOLT CASING (INDUCTION BOLT HEATER
LOW SPEED BALANCING
)
Mengeliminasi permasalahan fitur time and temperature serta Menghilangkan residu hidrogen
unbalance pada rotor turbin- power input setting, dan desain alat sulfida, karbon, korosi, cat, karat,
generator yang compact residu minyak dan biji besi
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
TIM LOW SPEED BALANCING
Banyaknya permasalahan vibrasi tinggi yang
disebabkan oleh unbalance pada rotor turbin-generator,
serta adanya pekerjaan perbaikan pada rotor, seperti
pekerjaan reblading rotor turbin dan penggantian heat
insulation rotor generator yang berpotensi menyebabkan
unbalance pada pembangkit listrik baik existing PJB
maupun non-existing PJB, menjadikan pekerjaan
balancing sebagai salah satu correction action dalam
rangka menurunkan nilai unbalance. Dalam hal ini
pekerjaan balancing yang dimaksud dibagi menjadi dua
yaitu insitu balancing dan low-speed balancing.
Pada pekerjaan insitu balancing, pengambilan data
unbalance dilakukan pada putaran operasi unit, sehingga
dibutuhkan bahan bakar yang sangat besar dalam
aplikasinya, sedangkan pada low-speed balancing
pengambilan data dilakukan diluar casing dan dapat
dilakukan secara parallel bersamaan dengan overhaul
turbin-generator, serta tidak dibutuhkan bahan bakar
dalam pengaplikasiannya, sehingga low-speed balancing
menjadi salah satu solusi tepat dalam rangka
mengeliminasi permasalahan unbalance pada rotor
turbin-generator.
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 19
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
TIM LOW SPEED BALANCING
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 20
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
LOW-SPEED BALANCING
PLTU PACITAN
LSB LP Turbine Rotor
PLTU #1.0-2.0 (315 MW)
PJB UBJOM Pacitan
PLTA BRANTAS
LSB Turbine Runner
PLTA Tulungagung (18
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
MW) PJB UP Brantas
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
PROJECT HISTORY TIM BALANCING
No Project Lokasi Waktu
PLTGU GT #1.2 (130 MW)
1 LSB Turbine Rotor 19-21 Mei 2015
PLN UPK Belawan
PLTGU GT #1.3 (100 MW)
2 LSB Turbine Rotor 12-15 Oktober 2017
PJB UP Gresik
PLTU #20 (315 MW)
3 LSB LP Turbine Rotor 03-05 Desember 2017
PJB UBJOM Rembang
PLTU #9 (660 MW)
4 LSB LP-A Turbine Rotor 29-31 Januari 2018
PJB UBJOM Paiton
PLTU #1.0-2.0 (315 MW)
5 LSB LP Turbine Rotor 04-12 Maret 2018
PJB UBJOM Pacitan
PLTU #1.0 (315 MW)
6 LSB HIP Turbine Rotor 27-30 Mei 2018
PJB UBJOM Pacitan
LSB HIP Turbine & PLTU #1.0 (315 MW) 23-25 Mei 2019
7
Generator Rotor PJB UBJOM Pacitan 03-06Juni2019
PLTU B (25 MW)
8 LSB Generator Rotor 13-17 Juli 2019
PT. Semen Tonasa
PLTU #2.0 (330 MW)
9 LSB LP Turbine Rotor 11-13 Januari 2020
PJB UBJOM Tj. Awar-Awar
PLTU #10 (315 MW)
10 LSB Generator Rotor 19-24 Maret 2020
PJB UBJOM Rembang
PLTU # 2.0 (110 MW) Banjarsari PT. Bukit Pembangkit
11 LSB HIP Turbine Rotor 25-29 Agustus 2020
Inovatif
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 23
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
TIM DISASSEMBLY – ASSEMBLY BOLT CASING
(INDUCTION BOLT HEATER
Bolt dan Nut adalah satu dari banyaknya komponen penting pada aset
pembangkit khususnya milik PT. PLN. Sebagai anak perusahaan yang bergerak
di bidang jasa Maintenance, Repair, dan Overhaul, Unit Maintenance Repair and
Overhaul (MRO) menemukan ketidak- efektifan pada proses assembly/
disassembly dimana proses tersebut dilakukan secara manual dan tidak
dilakukan sesuai dengan criteria of acceptance pada part tersebut. Hal ini
berdampak pada banyaknya anomali yang terjadi akibat proses secara manual
tersebut seperti overtorque, crack pada baut, hingga munculnya vibrasi akibat
mechanical looseness yang diakibatkan oleh proses yang kurang tepat tersebut.
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 24
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
HISTORY PROJECT IBH
HASIL
WAKTU LOKASI HASIL
PEKERJAAN WAKTU LOKASI
PEKERJAAN
ALL BAUT CASING
PROJECT 1 JANUARI 2019 MUARA TAWAR TURBIN & ALL BAUT CASING
COMPRESSOR PROJECT 7 AGUSTUS 2020 PLTU PAITON #1
TURBIN
Dry ice blasting atau Teknik Pembersihan menggunakan dry ice merupakan
inovasi teknologi terbaru yang tengah diminati oleh industri-industri dimana cara
kerjanya sama seperti sand blasting.
Media yang digunakan sebagai pengganti pasir (sand) yakni dry ice pellet
dengan titik beku pada - 79°C. Dry ice ditembakkan melalui aliran udara
bertekanan tinggi dari satu selang.
Teknik ini merupakan cara membersihkan permukaan yang aman dan efektif.
Dengan tenik ini pembersihan akan mendapatkan hasil yang bersih , waktu yang
singkat, tidak meninggalkan limbah sekunder dan tidak mengurangi tebal
material dasar.
Anda bisa menggunakan teknik ini untuk menghilangkan residu hidrogen
sulfida, karbon, korosi, cat, karat, residu minyak dan biji besi.
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 26
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
OIL PURIFIER KELMER
Tim Spesialis "OIL PURIFIER" merupakan salah satu tim suatu peralatan yang
dimiliki PT. PJB, dimana kegiatannya sejauh ini adalah mendukung pemeliharaan unit-
unit pembangkit (UP) yang dimiliki PT. PJB, khususnya dalam hal system pelumasan.
Saat ini UMRO JP-2 tidak hanya melayani overhaul pada Unit Eksisting (UP Gresik dan
UP Paiton), tapi juga bertambah melayani Overhaul untuk unit-unit Pembangkit FTP-1
diantaranya UBJOM Pacitan, UBJOM Rembang, UBJOM Paiton 9, dan UBJOM Tanjung
Awar-awar.
Permasalahan sejauh ini dalam setiap sistem pembangkit untuk peralatan yang
menggunakan oil sebagai system pelumasan harus dipastikan kontaminan/kualitas oil
dan juga waktu lamanya proses purifier oil untuk mencapai hasil sesuai standarnya.
Untuk standar ukuran kontaminan oil oleh partikel menggunakan NAS 1638 yang banyak
diaplikasikan di beberapa industry.
Untuk mencapai waktu dan kualitas oil sesuai standar tersebutlah yang menjadi
acuan kami dari tim specialis oil purifier menyelesaikaikan permasalahan tersebut guna
mendukung project overhaul di unit-unit pembangkitan. Maka dari tim oil purifier sudah
menyiapkan peralatan khusus yang kami namakan PURIFIER KELMER dengan
spesifikasi yang sudah kami perhitungkan guna mencapai target waktu dan kualitas oil
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 27
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
TIM VALVE
Valve atau katup adalah sebuah perangkat yang terpasang pada sistem perpipaan,
yang berfungsi untuk mengatur, mengontrol dan mengarahkan laju aliran fluida dengan
cara membuka, menutup atau menutup sebagian aliran fluida. Katup/valve memiliki
peran penting dalam suatu industri seperti industri pembangkitan dan migas.
Terdapat berbagai macam jenis valve, berikut beberapa contoh valve pada indrustri
pembangkitan, yaitu gate valve, ball valve, globe valve, needle valve, butterfly valve,
check valve, dan pressure relief valve.
Kerusakan yang sering terjadi pada valve yaitu bocor pada contact seat dan disc
sehingga dapat terjadi kebocoran saat unit beroperasi dan dapat menyebabkan kerugian
yg besar.
Mengingat pentingnya fungsi valve tsb shg harus dijaga kehandalannya dg dilakukan
pemeliharaan secara berkala.
Dengan adanya tim spesialis valve UPHT yg dilengkapi dg tool yang memadai dapat
membantu menyelesaikan permasalahan pada valve yg dialami unit unit pembangkitan
yang dikelola PJB, PLN maupun Non PLN.
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 28
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Tim Spesialis
ASSESSMENT DAN KALIBRASI TSI
(TURBINE SUPERVISORY INSTRUMENT)
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 29
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
KAPABILITAS TEAM TSI
(TURBINE SUPERVISORY INSTRUMENT)
No Jenis Pengujian Equipment / Brand yang bisa dikerjakan
Bently Nevada:
PENGALAMAN PROJECT
- 3300 / 3300 XL 5 mm proximity transducer system
- 3300 / 3300 XL 8 mm proximity transducer system
- 3300 / 3300 XL 11mm proximity transducer system
- 3300 / 3300 XL 16 mm proximity transducer system GAS TURBINE PLTGU
- 3300 / 3300 XL 25 mm proximity transducer system GRESIK
- 3300 / 3300 XL 50 mm proximity transducer system STEAM TURBINE
- 9200 Seismoprobe Velocity Transducer ****) PLTGU GRESIK
Pengujian Statis / Dinamis Sensor Vibrasi EMERSON/EPRO: PLTU GRESIK UNIT #4
1 tipe Eddy Current, Velocity, dan - PR6423 – 8 mm Eddy Current Sensor
Accelerometer *)
PLTU REMBANG
- PR6424 – 16 mm Eddy Current Sensor
- PR6426 – 32 mm Eddy Current Sensor PLTU TJ. AWAR-AWAR
- PR9268 - Electrodynamic Velocity Sensor ****)
Meggit / Vibro-Meter: PLTU PACITAN
- TQ402 with IQS450 8 mm Proximity Measuring System
- TQ403 with IQS450 18 mm Proximity Measuring System PLTU KETAPANG
- CE620 – Piezzoelectric Accelerometer ****)
PLTU PAITON 9
JiangLing:
- JiangLing ZHJ-2 Vibration Rate Sensor****) PLTU PAITON UNIT #1
Bently Nevada 3300 Series Monitoring System
Bently Nevada 3500 Machinery Protection System PLTU PAITON UNIT #2
2 Pengujian Vibrasi Monitor **) EPRO MMS 6000 Machine Monitoring System
Emerson AMS 6500 Machinery Health Monitor
Vibro-Meter VM600 Machinery Protection System ****)
Pengujian Modul Electrical Overspeed 30
3
The information contained in this document is strictly confidential. ItUniversal
Turbin
or distribute (EOST) ***)
this document
is strictly forbidden
without permission of PEMBANGKITAN JAWA-BALI, PT
semuatopower
use, disclose,
plant copy, modify, dapat dikerjakan
/ turbine
Tim Spesialis
PURIFIER OIL TRANSFORMER
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 31
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
PURIFIER OIL TRANSFORMERS
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 32
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Highlighted Project & Impact
• Increase Plant Capacity:
- HGPI+ GT 1.2 Muara Karang (Increase 18.97% from before)
- SI PLTU #2 Tenayan (Increase 15.07% from before)
- SE- ST 2.0 UP Gresik (Increase 8.76% from before)
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities
Equipment Certifications/Capabilities
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities
Equipment Certifications/Capabilities
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities
Equipment Certifications/Capabilities
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Steam Turbine Inspection
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 37
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Generator Inspection
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 38
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Replace Lacing Wire LP Steam Turbine
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 39
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
MRO Capabilities & Experience
Pump & Fan Inspection
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 40
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
INSPECTION & RLA
MECHANICAL & NON MECHANICAL NDE
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 41
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
Microstructure Coating Chemical
Defect / Flaw Hardness
Thickness Composition
Analysis Measurement Measurement
Measurement analysis
Corrosion
Borescope
Mapping
UT
Inspection
Gas Turbine:
Penetrant 1. Gresik Power Station
Test 2. Muara Karang Power
Station
3. S2P, dst
Eddy
Current Test
Magnetic
Particle Test
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
Generator (Retaining Ring & Bearing) UT- flaw test, Penetrant Test
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 43
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
Scope
Rotor shaft
Turbine blades
Main turbine Turbine
diaphragma/nozzle
Turbine casing
Turbine bolts
Assessment
Turbine bearings
Mechanical
Turbine
Turbine drain manifold
Feed water pipe
Piping system turbine Extraction steam pipe
area
HP bypass pipe
LP bypass pipe
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 44
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
Area Application
Boiler:
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 45
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
Area Application
Scope
Waterwall Furnace
Waterwall Reheater
Division panel
Pressure part internal Superheater
boiler Primary Superheater
Medium Reheater
Final Superheater
Low Temp. Superheater
Final Reheater
Assessment
Economizer
Mechanical Boiler
Headers
Steam drum
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
All Drain pipe 46
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
RLA Capabilities & Experience
UT Flaw pada journal bearing UT Thickness pada Tube Boiler UT Flaw pada journal shaft
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
SCOPE ASSESSMENT GENERATOR
STATOR ROTOR
INSULATION RESISTANCE
INSULATION RESISTANCE
POLARIZATION INDEX
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
SCOPE ASSESSMENT MOTOR SCOPE ASSESSMENT TRAFO
STATOR TRAFO
INSULATION RESISTANCE INSULATION RESISTANCE
POLARIZATION INDEX
POLARIZATION INDEX
DC RESISTANCE (RDC)
DC RESISTANCE (RDC)
DISSIPATION FACTOR (TANDELTA)
DISSIPATION FACTOR (TANDELTA)
PARTIAL DISCHARGE (PD)
DIRANA (Dielectric Response Analysis)
WEDGE TIGHTNESS (WTD)
ELCID (Electromagnetic Core Imperfection Detector) SFRA (Sweep Frequency Response Analysis)
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
SCOPE ASSESSMENT ELECTRICAL
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 53
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Mechanical Workshop Workshop Repair & Service
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Balancing & Vibration Analysis
• Certified equipment & expert
• Inspection report (before & after services)
• Vibration analysis
• Insitu/field balancing
CSI 2600
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Welding repair & fabrication
• Repair Job : Welding by MIG, TIG
or SMAW, Machining
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Bearing Re-babbitt & Repair
• Bearing re-babbitt, journal bearing and thrust
bearing
• Welding, Machining, NDT (Penetrant test
&Ultrasound test) – certified
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
WORKSHOP REPAIR
PRODUCT
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
WORKSHOP REPAIR
PRODUCT
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
ROTOR STRAIGHTENING
1250 µM
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
SUPPORTING WORKSHOP
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 63
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Sertifikat Akreditasi
Laboratorium Jakarta Laboratorium Gresik
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 64
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Layanan U-LAB
Kelistrikan Tekanan Suhu Repair
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 65
https://www.youtube.com/channel/UCiyISnBDQYwWFhdt8fN1Gwg/videos
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
Fasilitas Standard dan Lingkungan
Kelistrika
Tekanan Suhu
n
Spesifikasi :
Spesifikasi : Spesifikasi : Multifunction Precision Thermometer
Digital Meter Std Up to 8 ½ Digit Deidweigt tester 0.006%FS Infrared Calibrator
Multiproduct Calibrator Up to 7 ½ Digit Pressure controller 0.01% FS Oil Bath Calibrator -20°C - 200°C (Next)
Thermocouple Typse-S Sensor 0°C - 1200°C
Standart Platinum Resistance Thermometer -35°C –
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, 500°C 66
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT
TOTAL SUPPLY CHAIN SOLUTION
Total :
70 Unit Power Plant
We already
collaborated
with more than
250 Partners
both domestically Pembangkit FTP-1 (25 Lokasi )
Pembangkit NON- FTP-1 (6 Lokasi)
and abroad
Non Pembangkit (1 Lokasi)
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PEMBANGKITAN JAWA-BALI, PT