You are on page 1of 1

H

N
structural considerations noted in blue below

SHELL A SHELL A

Height to be con
V
ELV
PHASE 1 PHASES 1 & 2

LV
ELV
ELV

ELV
LV
LV
SSL +0.000

ELV

ELV
400 THICK RC SLAB

LV
A
LV

ELV

ELV
SSL +0.000

LV

GEN 1-A-01

GEN 1-A-02

GEN 1-A-03

GEN 1-A-04
LV

SSSB 1-B1-1
ELV
400 THICK RC SLAB

ELV
LV
LV

ELV

GPS 1

ELV
LV
LV

ELV
250 THICK RC SLAB

LV
ELV
LV
SSL +0.000

ELV
A
LV

LV

ELV
TCOM
FUEL OIL OFF LOADING LAYBY

TCOM

ELV

LV
LV

ELV
ELV
LV

LV

ELV
TCOM
SSL +0.000

ELV
TCOM

Height to be confirmed by Architect

LV
LV

ELV
ELV
LV

LV
400 THICK RC SLAB

ELV
TOC +0.000

FUEL FILL STATION

TCOM

ELV

LV
LV
TCOM

ELV
LV
400 THICK RC SLAB

ELV
LV

ELV

LV
ELV
TCOM

LV
LV

ELV
TCOM

ELV
250 THICK RC SLAB

LV

Height to be confirmed by Architect


ELV
SSL +0.000

LV
ELV
TCOM
TOC +0.000

LV

ELV
LV
TCOM

ELV

LV
400 THICK RC SLAB
LV LV LV LV LV LV LV LV LV LV LV LV

Height to be confirmed
ELV

ELV
LV
TCOM
LV LV LV LV LV LV LV LV LV LV LV LV

ELV
ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV

LV
TCOM

LV
ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV

ELV
LV

ELV

ELV
TCOM

LV

by Architect
TCOM
LAYBY LOAD BANK TRAILER

ELV
LV

ELV

ELV
LV
LV
TCOM
TCOM
250 THICK RC SLAB

LV

ELV
ELV

ELV
SSL +0.000

ELV
LV
LV

BDM USS 1-1-a


TCOM
SSL +0.000

TCOM

LV
WEST ROAD

ELV
MAIN ROAD

ELV
1100 THICK RC SLAB

LV

ELV
400 THICK RC SLAB

LV
GEN 1-A1-1-j

GEN 1-B1-1-j

A
TCOM
SSL +0.000

LV
TCOM
LB USS 1

ELV

ELV

LV
SSL +0.000

LV

ELV

USS 1-1-b
GEN 1-A-01

GEN 1-A-02

GEN 1-A-03

GEN 1-A-04

USS 1-1-c
SSSA 1-A1-1

SSSB 1-B1-1
TCOM
SLAB 400 THICK RC SLAB

LV
400 THICK RC SLAB

TCOM

ELV

LV
SSL +0.000

ELV
LV

ELV
cables

LV
TCOM
ducts terminate

ELV

GPS 1

LV
TCOM

ELV
LV

ELV
here, cables

LV
TCOM

LV
250 THICK RC SLAB

ELV
0.650
continue up

LV
ELV
SSL +0.000

TCOM
SSL +0.000

ELV
0.150
FFL

150
750 THICK RC SLAB

LV
LAYBY LOAD BANK TRAILER
H

LV
LV
ELV
TCOM

ELV
TCOM ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV

LV
LV LV LV LV LV LV LV LV LV LV

SSL +0.000

LV
ELV

ELV
TCOM

SSL +0.000 400 THICK RC SLAB


TCOM

SSL +0.000 400 THICK RC SLAB

LV

ELV
LV
ELV

ELV
TCOM

250 THICK RC SLAB


LV
TCOM

ELV
LV
ELV

ELV
250 THICK RC SLAB
TCOM

LV

Height to be confirmed by Architect


TOC +0.000
SSL +0.000
TCOM

ELV
LV
TOC -0.500
ELV

ELV
LV
TCOM

RADIUS 1.2m

ELV
LV LV LV LV LV LV LV LV LV LV LV LV
TCOM

Height to be confirmed
PMDC 1-A1-1-j

PMDC 1-B1-1-j
ELV

ELV
ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV
LV

LV
H
TCOM

ELV
TEMPORARY
TCOM

ELV

ELV
LV

PLATFORM

LV
FHM

by Architect
SSL +0.000
TCOM

SCALFFOLDING MIN 150mm THICK RC


TCOM

ELV

ELV
LV

LV
400 THICK RC SLAB

TEMPORARY
250 THICK RC SLAB
32/40 SURROUND
SSL +0.000
ELV
LV

ELV
LV
PLATFORM

BDM USS 1-1-a


TOC -0.150
SCALFFOLDING
LV

ELV

LV

ELV
TOC -0.650

LB USS 1
TCOM

sleeves cast into concrete to


LV

1425
ELV

LV
SSL +0.000

ELV

USS 1-1-b

USS 1-1-c
TCOM

250 THICK RC SLAB 400 THICK RC SLAB


create 125mm internal dia
LV

LV
SSL +0.000
TCOM

ELV

of hole for 110mm dia ducts to

ELV
TCOM

ducts terminate cables be pulled through. hole is


LV

LV
ELV

FSA DCH
TCOM

ELV
here, cables slightly oversized to provide
TCOM

110 tolerance for 110mm ducts

LV
TOC -0.850 TOC -0.650
continue up

ELV
1000 THICK RC SLAB
TCOM

TOC -0.125 TOC -0.150


FFL 100 150

150
LAYBY LOAD BANK TRAILER SHELL A
H

100 - 150MM CONCRETE

LV
ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV ELV
TOC -0.750
TCOM

TYPICAL DUCT DOUBLE


TCOM

LV LV LV LV LV LV LV LV LV LV LV
TOC
LV
-0.050 LV LV LV LV LV LV LV LV LV LV LV LV LV
PLINTH AROUND DUCTS
BEDDING ROCKER JOINT
TCOM

ELV
TCOM

FIRE ACCESS ROAD


TCOM

5 X 3 CONFIGURATION WITH 150mm

ELV
TCOM

TOC -1.200

TOC +0.000
TOC +0.000

MV E-Houses Entry Deta


110mm DUCTS AND 100MM
TCOM

ELV
TCOM

TOC -0.500

875
SEPARATION ALLOWED FOR ABOVE
RADIUS 1.2m

ELV
shorter
TCOM

ARRANGEMENT TO BE CONFIRMED
TCOM

dim BY ELECTRICAL ENGINEER


ELV
TCOM
TCOM

TCOM

TCOM MIN 150mm THICK RC


32/40 SURROUND
TCOM

TCOM
SMOOTH WALLED LONG
RADIUS BEND
Duct Configuration Detail
TCOM

TCOM

NTS
TCOM

TCOM
TCOM

TCOM

FSA DCH MIN 150mm indicative outline of


TCOM

TCOM

CONCRETE 100mm wide x


SHELL A TYPICAL DUCT DOUBLE
SURROUND TO
DUCT BEND
100mm concrete high
upstand.
note: may combine individual holes cast in to slab with
BEDDING ROCKER JOINT cast in sleeves to allow mv ducts to
into single upstand for
2no. 5x3 be pulled through. sleeves to allow
configuration, rather 100mm (clear) spacing between

MV E-Houses Entry Detail than 1no. upstand for


each 5x4
configuration
each opening

NTS
Plan View
SCALE 1:250

2022/08/02 RED-Structures comments


1,525.3 mm

662.5 mm 662.5 mm 712.5 mm 712.5 mm


762.5 mm 762.5 mm 812.5 mm 812.5 mm
100.0 mm

100.0 mm
642.8 mm 642.8 mm
100.0 mm
1,694.3 mm

M M
1,025.0 mm

1,075.0 mm
875.0 mm
750.2 mm
825.0 mm

750.2 mm

375.0 mm

437.5 mm

537.5 mm
29.0 mm

80.9 mm
Overlap of upstands Overlap of upstands
67.0 mm

M
S14 Trestle Column

M
1,025.0 mm

1,075.0 mm
875.0 mm
750.2 mm

750.2 mm
825.0 mm

375.0 mm

537.5 mm
WIP SS DETAIL
100.0 mm

SWECO
DESIGN MS
DATE 28.07.2022
SHEET SI E A1