Report Date: 01-04-2022 07:47 AM Plant: ACM

IWR No. Request Date Work Start Date Classification Equipment Name / No. Requester Technician Problem Statement Cause Classification Remarks
P-2003-2 09 Mar 20 01 Mar 22 CM Crusher Sathish Muniswaren Crusher other items Others On the 25/2 (M) During PA-522 Lot
S0214 polymers transferring ending time
(washing tank 2 just finish) found dryer
inlet no polymer.Technician checked at
dewaterer outlet and found that
polymers already accumulated at
dewaterer chute. Immediately stopped
the dewaterer.After futher investigation,
found the root cause was crusher trip
without any alarm at level 2. Munis
follow up, SDM 2020.
P-2107-1 01 Jul 21 01 Mar 22 CM Neutralizer Tank Sathish Htein Lin,Liu Tank other items Others On the 01/07 (M) During neutralizer
Biao,Muniswaren preparation encounter the WI charging
PV capture wrong, Not tally with the SV,
Example in neutralizer page WI charging
SV = 2475 lts, Capture PV = 2205 lts,
physical check the WI qty is normal,
Then refer to WI charging page to
confirm the SV= 2473,

Pls check and rectify the issue,


P-2202-12 24 Feb 22 08 Mar 22 CM Premix Tank Rajagopal Tu Htang,ye kyaw Tank other items Material Failure 24/2 (M) 1000 hrs, Production last batch
htet during premix washing end encounter
Premix A2 PLC level showing positive
(4.5%) value even tank empty. unable to
end sequence. manually stopped.
Maintenance already zeroing done. now
under monitoring

From Liu Biao:


Please close this WO. Thanks.
P-2202-15 25 Feb 22 09 Mar 22 G Cooling Tower Others Rajagopal Heng Kam Other items related to cooling Others PA production cooling tower's AGS id
Fatt,Nikesh,Tu Htang tower name change to NEA id, Need to label
as mentioned in NEA registration (Pls
refer ESH email for details)
P-2203-3 08 Mar 22 11 Mar 22 IM Packing Others Rajagopal Nikesh,Tu Htang Packing other items/issues/works Others Packing room near molder hydraulic unit
side existing wall mounted electric
switch box need to re-locate to other
place without hurdle person who walk
narrow passage (Details refer approved
SNM case)
P-2203-4 08 Mar 22 11 Mar 22 CM T2-31 Rajagopal Nikesh,Tu Htang Tank other items Others Washing tank # 1 agitator shaft cooling
circulation side attached white teflon
inner part only rotating, outer part
suspect detatched no roatating. Maint
came and checked continue to run,
upcoming GC plan to glue back
U-2203-1 11 Mar 22 20 Mar 22 G WWT Others Sivalingam Nikesh,Tu Htang Other Items Others WWT area & Fire water Tank on Top
Windsock please need to replace new
one.

1 of 1