IWR No. Request Date Work Start Date Classification Equipment Name / No. Requester Technician Problem Statement Cause Classification Remarks
P-2003-2 09 Mar 20 01 Mar 22 CM Crusher Sathish Muniswaren Crusher other items Others On the 25/2 (M) During PA-522 Lot
S0214 polymers transferring ending time
(washing tank 2 just finish) found dryer
inlet no polymer.Technician checked at
dewaterer outlet and found that
polymers already accumulated at
dewaterer chute. Immediately stopped
the dewaterer.After futher investigation,
found the root cause was crusher trip
without any alarm at level 2. Munis
follow up, SDM 2020.
P-2107-1 01 Jul 21 01 Mar 22 CM Neutralizer Tank Sathish Htein Lin,Liu Tank other items Others On the 01/07 (M) During neutralizer
Biao,Muniswaren preparation encounter the WI charging
PV capture wrong, Not tally with the SV,
Example in neutralizer page WI charging
SV = 2475 lts, Capture PV = 2205 lts,
physical check the WI qty is normal,
Then refer to WI charging page to
confirm the SV= 2473,
1 of 1