Non-compliance task
Id# 30 & 200, It has
been found that the
Battery Terminal
SA-98
connections are loose,
1 Service
Weekly Inspection of Emergency Generator (Himoinsa 1250 and need to be PM not
Building WO21200757
KVA 220/380V) cleaned. The fuel Completed
Pump Panel and
Indication Lamp for
Power ON were found
Busted
Non-compliance task
Id# 30,230 & 260, It
has been found that
the Battery Terminal
connections are loose,
SA-23 No Record sheet
2 Service Weekly Inspection of Emergency Generator (Doosan 500 found & not Updated.
WO21200785 PM not
Building KVA 220/380V) Cleaning required for
Completed
Cleaning and Remove
unnecessary material
(Nuts & Bolts)
General Observations
Updated
S.N0 Location Observations Photo Action required Status Remarks
Status
Need to Replace
Busted Lamp &
First Floor, Room 117l118, Teris, Light found Busted and
1 Connection Box face
connection Box face plate not fixed properly.
SA-06 Civil plate need to be
Defense fixed properly
Electrical
Need to Replace
SA-06 Civil Electrical Box is broken for 2 gang sockets, Size 7X14 Cm
3 Broken PVC Box
Defense
Need to Replace
SA-06 Civil Inside the Washroom, the Exhaust Fan's Switch was found
6 Electrical broken switch for
Defense Broken, Safety issue
Exhaust fan
Cable connections
Ground Floor, In the Mosque, found hanging electrical and Arrange
SA-06 Civil
9 Electrical cable, On Carpet also Arranged Cable connections in a electrical cable in a
Defense
proper way proper way with
PVC trunk
Arrange lighting
SA-06 Civil Ground Floor, In Storeroom, Fluorescent lighting cable not
10 Electrical cable in a Proper
Defense fixed properly
way