You are on page 1of 3

KFCA Project – Inspection Report

Location: Bahrain Side Service Type: Electrical Date: Sep 13th 2023

Re-Active/Corrective Maintenance Inspection


Sr
Bldg. No:
.
W.O Number Description Observations Photo Required Action Status Remarks
N
Location:
o

Custom cabin RM not


1 departure #3 WO21978076 Rectify the damaged panel lock NOT DONE
Completed

BA02 Due to water leak, cable of light having short RM


2 WO21978075 Done
circuit Completed

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 1 of 3
KFCA Project – Inspection Report

BCCD RM
3 WO21978103 Rectify damaged barrier Done
Completed

BA7C RM
4 WO21978088 Replaced busted lights Done
Completed

Preventive Maintenance Inspection

Sr. Bldg. No: Required


W.O Number Description Observations Photo Status Remarks
No Location: Action

Weekly Inspection of Emergency


ZN2-Bldg.# BA21-
1 WO21359528 Generator(DOOSAN-500KVA@ PM completed
Service Bldg
220/380V)

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 2 of 3
KFCA Project – Inspection Report

Weekly Inspection of Emergency


ZN2-Bldg.# BA21-
2 WO21359556 Generator(HIMOINSA- PM Task has Done PM completed
Service Bldg
1000KVA@ 220/380V)

ZN2-Bldg.# BA24-
Weekly Inspection of Emergency
Maintenance
3 WO21359584 Generator(DOOSAN-500KVA@ PM Task has Done PM completed
Workshop &
220/380V)
Desalination Plant

ZN2-Bldg.# BA24-
Weekly Inspection of Emergency
Maintenance
4 WO21359612 Generator(HIMOINSA- PM Task has Done PM completed
Workshop &
1000KVA@ 220/380V)
Desalination Plant

Inspected By

Olive Arabia O&M Contractor

Motaeb Alshibanei Safari Co.

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-GEN-FR-1-00 Revision: 00 Page 3 of 3