You are on page 1of 2

KFCA Project - Joint Quality Inspection Report

Location: Saudi Side Service Type: Electrical Date:27/Feb/2023

Preventive Maintenance Inspection

Bldg. No:
Required
Sr. No W.O Number Description Observations Photo Status Remarks
Action
Location:

SA-23 Service Preventive Maintenance of Battery PM


01 WO17959493 PM Task has been done
building Charger Sealed Lead Acid Completed

SA-14 Causeway Preventive Maintenance of Road PM


02 WO17959522 PM Task has been done
Bridge Center Barrier Completed

Preventive Maintenance of Road PM


03 SA-4A WO17959501 PM Task has been done
Barrier Completed

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-QI-FR-1-00 Revision: 00 Page 1 of 2
KFCA Project - Joint Quality Inspection Report

SA-98 Service Preventive Maintenance of PM


04 WO17652663 PM Tasks have been done
Building Emergency Generator Completed

SA-02 Immigration Preventive Maintenance of Internal PM


05 WO17607790 PM Tasks have been done
Clinic Lighting Completed

Inspected By

Olive Arabia O&M Contractor (Safari)

Name Yasir Liaquat Name Syed Furan Ali

Signature Signature

Approved: QHSE Manager Date: May 2022


Doc. Owner: TM Doc. ID: QMS-FM-HS-IN-QI-FR-1-00 Revision: 00 Page 2 of 2

You might also like