IMAN 2022

Report of All Pending Work Order


Report Date: 07-01-2022 07:49 AM Plant: ACM

IWR No. Request Date Work Start Date Classification Equipment Name / No. Requester Technician Problem Statement Cause Classification Remarks
P-2112-28 31 Dec 21 04 Jan 22 CM R1-31B Rajagopal Heng Kam Reactor other items Material Failure Reactor - B bottom always encounter
Fatt,Nikesh,Subburaj brine leak issue, Need to trace back the
leak location and rectification the issue
asap (Refer photo)

From LiuBiao:
Htein Lin, please kindly order packing
for brine inlet at Reactor side.
P-2201-1 06 Jan 22 07 Jan 22 BM Coag Others Rajagopal Heng Kam Fatt,Tu Coagulation department other Others 3/01(M) at 1745 hrs, Salt de-compactor
Htang,Zuo Ming items left side hydraulic pusher arm bracket
Yang broken found, unable to operate. 4/1(M)
Maintenance already repaired

From Liu Biao:


Htein Lin, plese close this WO.
P-2201-2 06 Jan 22 07 Jan 22 CM SS Pit Others Tan Juan ping Heng Kam Fatt,Tu SS unit other item Others 6/1 (M) The flexible hose of SSpit outer
Htang,Zuo Ming pump discharge line found leaking,
Yang need to replace.
P-2201-3 06 Jan 22 07 Jan 22 BM Dryer Others Tan Juan ping Heng Kam Fatt,Tu Dryer unit other items Others 6/1 (M) Dryer chamber 4 steam
Htang,Zuo Ming motorized valve found stem broken.
Yang Maint already replaced the stem on the
same day.

From Liu Biao:


Please close this WO.
U-2112-3 29 Dec 21 29 Dec 21 G RB-102A Krishnamurthy Heng Kam Fatt,Tu WWT other blower items Others Oil leaking. Need to check already few
Htang,Zuo Ming times oil came out is it gasket worn out?
Yang

1 of 1