PROJECT : TELANGANA SUPER THERMAL POWER PROJECT PHASE 1 : (2x800 MW)
CUSTOMER : NTPC LIMITED
CONTRCTOR: TATA PROJECTS LIMITED DOCUMENT : FRONT AVAILABILITY Cumm. Balance Status of Work front Released SL.NO. Areas Description Unit Scope of QTY Work Status Achieved Cumm Front available Front not available Fire Tanks-2 nos TON 160 Erection TON 160 160 0 Work Completed and 1 Tank Area Front Available commissioned Water filling test TON 160 160 0 Sort Blasting & Painting m2 4200 1100 3100 Fire Pumps (Erection) Nos 9 9 0 Piping Mtr 462 422 40 Valves (GV,) Nos 43 35 8 Work Completed and 2 Fire Water Pump House NRV Nos 12 12 0 Front Available commissioned Busket Starainer Nos 3 0 3 PRV Nos 2 0 2 Motorised Valves Nos 2 0 2 Spray system M 265 265 U/G 55 55 1) 95% completed erectiion A/G 210 0 210 Front available balance and hydro test completedand 3 Switch yard Area-8 Hydrant system M 948 948 work under progress commissined. U/G 213 213 2) Balance 5% under progress A/G 735 84 651 Total M 2021 2021 4 Area -7 (Ash Handling Area) U/G 1290 150 1140 Front not available A/G 731 150 581 Total M 4882 4882 5 Area-6 (WTP,DM Plant area) U/G 383 30 353 Front not available A/G 4499 2940 1559 Total M 15588 15588 6 Area-5 (CHP Area) U/G 648 648 Front not available A/G 14940 14940 Total M 2738 2738 Front available Half Front available but need 7 Area-4 (Fuel Oil Area /GYP Area)) U/G 1030 200 830 Balance excavation wrapping coating agency A/G 1708 1708 RCC Pedestal Not available Total M 2131 2131 8 Area-3 ( ESP &Chimney Area) U/G & Pipe RCC Trench 1557 600 957 Front not available A/G 574 574 Total M 5175 5175 9 TG & BOILER AREA ( AREA-2) U/G & Pipe RCC Trench 2457 650 1807 Front not available A/G (Trestle) 2718 2718 Total M 2748 2748 10 Transformer Yard (Area-1) A/G 658 50 608 Front not available U/G 2090 500 1590 Internal Hydrant for 3 stairs TG Riser line ( 4 nos) Mtr 227 160 67 Front available completed, one balance Work Completed and Main Oil Tank (HVWS) Mtr 406 406 0 Front available commissioned Work Completed and 11 PHB(U#1) COT & DOT(HVWS) Mtr Front available commissioned Work Completed and OIL Canel(HVWS) Mtr 362 362 0 Front available commissioned Administration Building Riser Mtr 30 30 Front not available Service buld. Riser ( 1no) M 32 32 Front not available Boiler Riser ( 12 nos) for U #1 &2 M 900 900 Front Available for U # 1(450M) Booster pumps Nos 4 4 Front not available 12 Boiler (PHB & Boiler) (U#1) MS piping for Booster pumps Mtr 114 114 Front not available BBF (U#1&2) --- HVWS Mtr 0 Front not available MS Pipe/Ms Galv Mtr 1600 1600 Front not available
Mtr 375.5 375.5 0 Work Completed and
EL+0.0 commissioned
Mtr 400 150 250 Work in progress( Front
EL+5 available ) Work in progress( Front Mtr 400 400 13 Cable Gallery (GI ) MVW system(U#1) EL+9.0 available ) EL+14.0 Mtr 400 400 Front available EL +25.0 Mtr 300 300 Front available ESP Mtr 300 300 Front not available 13 Cable Gallery (GI ) MVW system(U#1)
Work Completed and
Mtr 218 218 0 Switch Yard commissioned Work Completed and Mtr 850 800 50 CER (U#1,2),CCR, UPS& Battery room,Programmer MS Seamless pipe work commissioned 14 room(Argonite System) Nos 80 80 work balance( Front available) Cylinder room (80 nos Cydinder) GT-3nos Mtr 1204 1204 Front not available
Mtr 1144 286 858 balance 1 no work in progress
UAT-2 Nos 15 Transformer Yard (HVWS)(U#1) UT-2 N0 Mtr 1144 Front not available
Mtr 300 300 0 Work Completed and
ST-01 No commissioned GT-3nos Mtr 1204 Front not available UAT-2 Nos Mtr 1005 Front not available 16 Transformer Yard (HVWS)(U#2) UT-2 N0 Mtr 1144 Front not available ST-02 No Mtr 581 Front not available 17 Switch Yard Bus Reactor Mtr 385 350 35 Front available work in progress MVW spray system piping Balance piping excavation ,RCC 18 LDO tanks ( 2 nos) -- MVWS Mtr 1385 1140 245 network both the tanks Pedestal Not available completed LDO Tanks Foam Bladder Tank Nos 2 2 Piping(MS Galv.) Mtr 19 LDO tanks ( 2 nos) -- Foam System Front not available Foam Pourier , Foam Seal and other accessries
Layout of internal Hydrant TP -33 Mtr 478 Front not available
Layout of internal Hydrant TP -34 Mtr 567 Front not available Layout of internal Hydrant TP -35 Mtr 474 Front not available Layout of internal Hydrant TP -37 Mtr 758 Front available Layout of internal Hydrant TP -42 Mtr 1106 Front available Layout of internal Hydrant TP -43 Mtr 673 Front available 20 Layout of internal Hydrant TP -44 Mtr 259 Front available Layout of internal Hydrant TP -45 Mtr 556 Front not available Layout of internal Hydrant TP -46 Mtr 571 Front not available Layout of internal Hydrant TP -47 Mtr 365 Front not available Layout of internal Hydrant TP -48 Mtr 630 Front not available Layout of internal Hydrant TP -49 Mtr 411 Front not available MVW conveyor 1st Bunker Mtr 615 Front not available MVW conveyor 2nd Bunker Mtr 619 Front not available MVW conveyor 3rd Bunker Mtr 617 Front not available MVW conveyor 4rd Bunker Mtr 411 Front not available 21 MVW conveyor 5st Bunker Mtr 795 Front not available MVW conveyor 6nd Bunker Mtr 805 Front not available MVW conveyor 7rd Bunker Mtr 799 Front not available MVW conveyor 8rd Bunker Mtr 805 Front not available Conv 35A/B(MVWS) Mtr 1319 Front not available Conv 36A/B(MVWS) Mtr 3805 Front not available Conv 37A/B(MVWS) Mtr 6180 Front not available Conv 38A/B(MVWS) Mtr 3543 Front not available Conv 39 A/B(MVWS) Mtr 4910 Front not available Conv 40A/B(MVWS) Mtr 1481 Front not available Conv 41A/B(MVWS) Mtr 1725 Front not available Conv 44A/B(MVWS) Mtr 5364 Front not available Conv 45A/B(MVWS) Mtr 12672 Front not available 22 Conv 46A/B(MVWS) Mtr 779 Front not available Conv 46A/B(MVWS) Mtr 1,582 Front not available Conv 47 A/B(MVWS) Mtr 6811 Front not available Conv 49A/B(MVWS) Mtr 717 Front not available Conv 50A/B(MVWS) Mtr 653 Front not available Conv 51A/B(MVWS) Mtr 11868 Front available Conv 52A/B(MVWS) Mtr 5615 Front not available Fuel Oil unloading Pump House-MVWS Mtr 248 Front not available Fuel Oil Presure rising Pump House-MVWS Mtr 353 Front not available 23 Day oil Tank-MVWS Mtr 283 Front not available Crasher House Mtr 2991 Front not available CT Service Transformer -2.5MVA (HVWS) ADDITIONAL ORDER Mtr 958 Front not available WT Service Transformer -2.5 MVA ADDITIONAL ORDER Mtr 232 Front available FWPH Service Transformer -2.5 MVA ADDITIONAL ORDER Mtr 232 Front available 24 Zypsum Service Transformer - 2.5 MVA ADDITIONAL ORDER Mtr 240 Front not available CHP Service Transformer - 7.5 MVA Mtr 230 Front not available TAC/HCHD Service Transformer -2.5 MVA ADDITIONAL ORDER Mtr 2 Front not available
Total piping scope 139 KM
completed as on date 15 KM front available after Lock Down 20 KM(chp area 13KM period and other area 7KM