Mobilization Update on SGW

15.06.2020

Qatar South
Catchment Zone Framework
METITO (Overseas) Qatar
Table of content

SUMMARY OF CURRENT EAMS USAGE


BY TAKAMUL PARTNER

SUMMARY OF EAMS REGISTER


THAT WAS HANDED OVER BY ASHGHAL INCLUDED LEGACY AND OUTSTANDING MAINTENANCE ISSUES NETWORK.

ORGANIZATION STRUCTURE
TAKAMUL PARTNER FOR MAINTAINING AND OPERATING THE NETWORK

OVERVIEW OF CLEANING OF NETWORK


READINESS FOR NEXT RAINY SEASON BY TAKAMUL PARTNER
SUMMARY OF CURRENT EAMS USAGE

SGW System Assets List


Description Unit  Quantity / Asset Inspection Cleaning
Rising Mains (Including Valve Chambers / Discharge LM 18,806 1 cycle/3 Y 1 cycle/3 Y
Chambers)
Sewer Pipe (Including Micro Tunnels) LM 1,026,864 Cycle/3 Y Cycle/3 Y
Gully Nos 81,556 P3-P2-P1 P3-P2-P1
Gully Connections LM 838,295 P3-P2-P1 P3-P2-P1
Injection well Nos 18 Monthly 3 Month
Manhole(Including Micro Tunnel MH) Nos 20,886 Cycle/3Y Cycle/3Y
Outfall Nos 20 Cycle/Y Cycle/2 Y
Culverts (Points) Nos 0 0 0
Culverts (Lines) Nos 1 Y Cycle/3 Y
Soakaways Nos 16,310 Cycle/Y Cycle/3 Y
EFAs Nos 24 2 Cycle/ Y Cycle/ Y
Tanks Nos 33 2 Cycle/Y Cycle/2Y
Lagoons Nos 8 2 Cycle/ Y Cycle/ Y
Interceptors Nos 0 0 0
Swales LM 0  0 0
SGW Pumping Stations Nos  34
SUMMARY OF CURRENT EAMS USAGE

2020 KPI Target

S.
Description Unit Inspection Target Cleaning Target
N
1 R M (Including Valve Chambers / Discharge Chambers) LM 1,409 0

2 Sewer Pipe / Micro Tunnels LM 84,788 84,788

3 G-P1 Nos/Cycle 4754 4754

4 G-P2 Nos/Cycle 8346 8346

5 G-P3 Nos/Cycle 68,300 68,300

6 Outfall Nos 20 6

7 Injection well Nos 18 18

8 EFAs Nos 24 0

9 Tanks Nos 33 0
SUMMARY OF CURRENT EAMS USAGE

Gully Cleaning Activity


16000
Gully Cleaning- P3
14000

12000

10000
Total Gully

8000

6000

4000
Zone Number
2000

0
1 3 4 5 6 7 13 14 15 16 18 24 25 46 54 55

Total Cleaned W/O Basket Cover Damage Concrete Dewatering


SUMMARY OF CURRENT EAMS USAGE

Gully Cleaning Activity

Before Cleaning
SUMMARY OF CURRENT EAMS USAGE

Gully Cleaning Activity


SUMMARY OF CURRENT EAMS USAGE

Gully Cleaning Activity

Gully With Concrete Illegal Dewatering


SUMMARY OF CURRENT EAMS USAGE

Gully Cleaning Activity

Gully After Cleaning


SUMMARY OF CURRENT EAMS USAGE

Pipeline Cleaning Activity

Pipeline Cleaning- Negative System


Monthly Target
Achieved ; 3060;
29% Achieved

Monthly Target ;
7643; 71%
SUMMARY OF CURRENT EAMS USAGE

Pipeline Cleaning Activity

CCTV Inspection
SUMMARY OF CURRENT EAMS USAGE

Pipeline Cleaning Activity

Pipeline End Cap


SUMMARY OF CURRENT EAMS USAGE

Soak-away Cleaning & Inspection Activity

Soak-away Cleaning & Inspection

Achieved ; 80; 29%

Monthly Target
Achieved

Monthly Target ; 200;


71%
SUMMARY OF CURRENT EAMS USAGE

Soak-away Cleaning & Inspection Activity

Before After
SUMMARY OF CURRENT EAMS USAGE

May/June PM Plan

Total Assets in Total assets Cleaned Total Assets Uploaded in


PM Plan Work Type Backlogs In EAMS Remarks.
the plan at site EAMS

May-20 Gully 571 507 571 0 64 (Under construction)

Gully 5000 175 75 100 ongoing

Jun-20

Pipeline 160 0 0 0 Waiting for Approval


SUMMARY OF CURRENT EAMS USAGE

Customer Service Complaint & Dewatering Activity


Month Work type completed at site Uploaded in EAMS
4 4
Complain
May
6 6
Dewatering
0 0
Complain
June
4 4
Dewatering

Work Order Work Description Date Area


12009252 SGW-METITO-Z55-Mearad-Soakaway Inspection and Dewatering 15-May-20 Mearad
12009254 SGW-METITO-Z55-Muaither-Soakaway Inspection and Dewatering 15-May-20 Muaither
12002123 Water ponding complaint site investigation for customer complaint received 5-May-20 Mebaireek
12002119 Odor complaint site investigation for customer complaint received 10-May-20 Bu Hamour
12009257 CTS 2020/0025701/1- Muaither South Site Investigation for water ponding complaint 17-May-20 Muaither
12009264 CTS 2020/0025701/1- Muaither Site Investigation for water ponding complaint 17-May-20 Muaither
12026093 SGW-METITO-Z55-Mearad-Soakaway Inspection and Dewatering 22-May-20 Mearad
12026278 SGW-METITO-Z55-Muaither-Soakaway Inspection and Dewatering 22-May-20 Muaither
12026270 SGW-METITO-Z55-Mearad-Soakaway Inspection and Dewatering 29-May-20 Mearad
12026283 SGW-METITO-Z55-Muaither-Soakaway Inspection and Dewatering 29-May-20 Mearad
12044807 SGW-METITO-Z55-Mearad-Soakaway Inspection and Dewatering 6-Jun-20 Mearad
12044822 SGW-METITO-Z55-Muaither-Soakaway Inspection and Dewatering 6-Jun-20 Muaither
12058373 SGW-METITO-Z55-Mearad-Soakaway Inspection and Dewatering 13-Jun-20 Mearad
12058370 SGW-METITO-Z55-Muaither-Soakaway Inspection and Dewatering 13-Jun-20 Muaither
SUMMARY OF EAMS REGISTER HANDED OVER

New Projects Taking Over Inspections

No. Of Inspection No Of Report


Month Project Name

1 1
P008-C2-J3-UP1

6 1
P012 Al Muntazah Street Extension (6 Ps)

May 1 1
DW079 SGW Network

1 1
P012 Shaft-2 Ps

1 1
P012 Shallow System & Tanks

1 1
June
DS016-P01- SW11 Network

1 1
UM-Doom Network
List of Damaging Assets- QS

PREVENTIVE MAINTENANCE FOR SURFACE & GROUND WATER ASSETS IN QATAR SOUTH & DOHA SOUTH / INSPECTION DEFECT DETAILS
SIC_005 PREVENTIVE MAINTENANCE FOR SURFACE & GROUND WATER ASSETS IN QATAR SOUTH & DOHA SOUTH / INSPECTION DEFECT DETAILS
METITO OVERSEAS QATAR / ASHGHAL
WORKODER ASSET_LEN INSPECTED ASHGHAL
INSPECT_ID INSP_NO INSP_DATE ASSET_NO SECTION_FROM SECTION_TO DIRECTION PIPE DIA RHP OCL CLASS T CLASS S CLASS R VIDEO_FILE REMARKS CONDITION
_NO GTH _LENGTH _GRADE
VELOSI/ASHGHAL SW7 2 15 5 - SW7 2 15 4
SW7 2 15 4 1 - SW7 2 15 4
3
4
30-10-17
30-10-17
137180
149544
10489026
10489141
SW7 2 15 5
SW7 2 15 4 1
SW7 2 15 4
SW7 2 15 4
Down Stream
Down Stream
55.73
59.83
54.5
59.3
300
300
9876
9855
0
0
5
5
0
0
0
0
0
0
METITO SW_AV001
METITO SW_AV001
CRACK
CRACK
MINOR
MINOR

INSPECT_ID FROM_MH TO_MH RHP OCL ASHGHAL_GRADE CLASS T CLASS S CLASS R VIDEO_FILE SW7 2 15 4 2 - SW7 2 15 4 1
SW7 2 15 3 - SW7 2 15 2
5
6
30-10-17
30-10-17
149090
126791
10489125
10488909
SW7 2 15 4 2
SW7 2 15 3
SW7 2 15 4 1
SW7 2 15 2
Up Stream
Down Stream
56.47
44.12
55.9
44
300
300
9996
9956
0
0
5
5
0
0
0
0
0
0
METITO SW_AV001
METITO SW_AV001
CRACK
CRACK
MEDIUM
MINOR

SW9A 18 1 1 - SW9A 18 1 SW9A 18 1 1 SW9A 18 1 9656 0 5 0 0 0 ACIDR-019 - 2018-03-20 SW7 2 15 2 - SW7 2 15 1 8 31-10-17 126794 10488911 SW7 2 15 2 SW7 2 15 1 Down Stream 42.91 42.7 300 9996 0 5 0 0 0 METITO SW_AV001 CRACK MEDIUM
SW7 2 12 2 1 - SW7 2 12 2 15 31-10-17 151201 10489174 SW7 2 12 2 1 SW7 2 12 2 Down Stream 54.74 52.9 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW9A 14 A2 - SW9A 14 A1 SW9A 14 A2 SW9A 14 A1 9604 0 5 0 0 0 ACIDR-021 - 2018-03-22 SW7 2 12 1 - SW7 2 12 18 31-10-17 139611 10489056 SW7 2 12 1 SW7 2 12 Down Stream 44.02 42.1 300 9604 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW7 2 20 - SW7 2 19 19 01-11-17 149194 10489132 SW7 2 20 SW7 2 19 Up Stream 59.84 59.3 300 9955 0 5 0 0 0 METITO SW_AV002 DISPLACED JOINT MINOR
SW9 2 5 2 1 1 - SW9 2 5 2 1 SW9 2 5 2 1 1 SW9 2 5 2 1 9996 0 5 0 0 0 ACIDR-022 - 2018-03-24 SW7 2 19 - SW7 2 18 20 01-11-17 128298 10488927 SW7 2 19 SW7 2 18 Down Stream 60 60.3 300 9995 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW7 2 18 - SW7 2 17 21 01-11-17 126793 10488910 SW7 2 18 SW7 2 17 Up Stream 60.11 59.6 300 9995 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW9 2 6 4 - SW9 2 6 3 SW9 2 6 4 SW9 2 6 3 10992 0 5 0 0 0 ACIDR-022 - 2018-03-24 SW7 2 17 - SW7 2 16 22 01-11-17 149112 10489127 SW7 2 17 SW7 2 16 Down Stream 43.96 44 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW7 2 15 1 - SW7 2 15 24 01-11-17 136465 10489000 SW7 2 15 1 SW7 2 15 Up Stream 42.92 43.1 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW9 2 10 1 2 1 - SW9 2 10 1 2 SW9 2 10 1 2 1 SW9 2 10 1 2 9987 0 5 0 0 0 ACIDR-023 - 2018-03-25 SW7 1 8 - SW7 1 7 29 04-11-17 148191 10489089 SW7 1 8 SW7 1 7 Down Stream 44.29 43.9 300 9604 0 5 0 0 0 METITO SW_AV003 CRACK MINOR
SW7 2 15 - SW7 2 14 32 05-11-17 150223 10489155 SW7 2 15 SW7 2 14 Up Stream 56.06 55.7 300 9603 0 5 0 0 0 METITO SW_AV003 CRACK MINOR
SW9 2 10 1 2 2 - SW9 2 10 1 2 1 SW9 2 10 1 2 2 SW9 2 10 1 2 1 8656 1 4 1 1 1 ACIDR-023 - 2018-03-25 SW7 2 14 - SW7 2 13 33 05-11-17 151200 10489173 SW7 2 14 SW7 2 13 Down Stream 60.08 60.5 300 9804 0 5 0 0 0 METITO SW_AV003 CRACK MEDIUM

SW9 2 13 1 2 - SW9 2 13 1 1 SW9 2 13 1 2 SW9 2 13 1 1 9866 0 5 0 0 0 ACIDR-024 - 2018-03-26 SW7 2 13 - SW7 2 12


SW7 1 1 5 2 - SW7 1 1 5 1
34
36
05-11-17
05-11-17
139191
151599
10489047
10489180
SW7 2 13
SW7 1 1 5 2
SW7 2 12
SW7 1 1 5 1
Up Stream
Down Stream
59.79
60.1
59.8
59.9
300
300
9655
9996
0
0
5
5
0
0
0
0
0
0
METITO SW_AV003
METITO SW_AV004
CRACK
CRACK
MINOR
MINOR

SW9 2 13 2 - SW9 2 13 1 SW9 2 13 2 SW9 2 13 1 9803 0 5 0 0 0 ACIDR-024 - 2018-03-26 SW7 1 1 5 1 - SW7 1 1 5 37 05-11-17 136061 10488987 SW7 1 1 5 1 SW7 1 1 5 Down Stream 59.98 58.7 300 9996 0 5 0 0 0 METITO SW_AV004 BREAK MAJOR
SW7 1 1 6 - SW7 1 1 5 39 05-11-17 135217 10488959 SW7 1 1 6 SW7 1 1 5 Up Stream 60.06 59.7 300 9955 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW9 2 13 3 1 - SW9 2 13 3 SW9 2 13 3 1 SW9 2 13 3 9996 0 5 0 0 0 ACIDR-025 - 2018-03-27 SW7 1 1 4 - SW7 1 1 3 40 06-11-17 134688 10488944 SW7 1 1 4 SW7 1 1 3 Down Stream 39.93 39.5 300 9856 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW7 1 1 7 - SW7 1 1 6 41 06-11-17 141253 10489067 SW7 1 1 7 SW7 1 1 6 Down Stream 60 59.7 300 9766 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW9 2 5 2 1 - SW9 2 5 2 SW9 2 5 2 1 SW9 2 5 2 9997 0 5 0 0 0 ACIDR-026 - 2018-03-28 SW7 1 1 9 - SW7 1 1 8 43 06-11-17 150071 10489151 SW7 1 1 9 SW7 1 1 8 Down Stream 60.23 59.4 300 9866 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
AW SW7 5 7 8 - AW SW7 5 7 7 48 06-11-17 149753 10489145 AW SW7 5 7 8 AW SW7 5 7 7 Up Stream 17.03 6.9 300 9002 0 5 0 0 0 METITO SW_AV005 SETTLED DEPOSIT MAJOR
SW9 12 1 1 - SW9 12 1 SW9 12 1 1 SW9 12 1 9996 0 5 0 0 0 ACIDR-028 - 2018-03-31 SW7 1 1 2 - SW7 1 1 1 55 07-11-17 140280 10489065 SW7 1 1 2 SW7 1 1 1 Up Stream 54.88 54.9 300 9866 0 5 0 0 0 METITO SW_AV005 CRACK MEDIUM
SW7 1 1 3 - SW7 1 1 2 56 07-11-17 151598 10489179 SW7 1 1 3 SW7 1 1 2 Up Stream 49.85 50.3 300 9956 0 5 0 0 0 METITO SW_AV005 DISPLACED JOINT MINOR
SW9 2 5 4 - SW9 2 5 3 SW9 2 5 4 SW9 2 5 3 9804 0 5 0 0 0 ACIDR-028 - 2018-03-31 SW7 5 7 1 - SW7 5 7 63 08-11-17 137171 10489024 SW7 5 7 1 SW7 5 7 Up Stream 59.94 59.6 300 9656 0 5 0 0 0 METITO SW_AV006 CRACK MINOR
SW7 5 5 - SW7 5 4 66 08-11-17 150450 10489161 SW7 5 5 SW7 5 4 Down Stream 60 60.1 300 9704 0 5 0 0 0 METITO SW_AV006 CRACK MINOR
SW 9 4 1 - SW 9 4 SW 9 4 1 SW 9 4 9865 0 5 0 0 0 ACIDR-029 - 2018-04-01 SW7 5 4 - SW7 5 3 67 08-11-17 134379 10488941 SW7 5 4 SW7 5 3 Up Stream 49.87 49.6 300 9604 0 5 0 0 0 METITO SW_AV006 CRACK MINOR

SW9 8 1 2 - SW9 8 1 1 SW9 8 1 2 SW9 8 1 1 9996 0 5 0 0 0 ACIDR-031 - 2018-04-03 SW7 5 3 - SW7 5 2


SW7 5 2 2 - SW7 5 2 1
68
69
08-11-17
09-11-17
127859
148786
10488917
10489106
SW7 5 3
SW7 5 2 2
SW7 5 2
SW7 5 2 1
Down Stream
Up Stream
50.02
59.98
49.8
59.8
300
300
9804
9665
0
0
5
5
0
0
0
0
0
0
METITO SW_AV006
METITO SW_AV006
CRACK
CRACK
MEDIUM
MINOR
SW9 8 2 - SW9 8 1 SW9 8 2 SW9 8 1 9865 0 5 0 0 0 ACIDR-031 - 2018-04-03 SW7 5 2 1 - SW7 5 2 70 09-11-17 150724 10489164 SW7 5 2 1 SW7 5 2 Down Stream 60.37 59.3 300 9995 0 5 0 0 0 METITO SW_AV007 CRACK MEDIUM
SW7 2 4 2 2 - SW7 2 4 2 1 75 15-11-17 148780 10489104 SW7 2 4 2 2 SW7 2 4 2 1 Up Stream 43.36 43.2 300 9656 0 5 0 0 0 METITO SW_AV007 CRACK MINOR
SW9 32 7 - SW9 32 6 SW9 32 7 SW9 32 6 9703 0 5 0 0 0 ACIDR-034 - 2018-04-07 SW7 2 4 8 5 - SW7 2 4 8 4 76 15-11-17 137809 10489030 SW7 2 4 8 5 SW7 2 4 8 4 Up Stream 60 60.1 300 9555 0 5 0 0 0 METITO SW_AV007 DISPLACED JOINT MINOR
SW7 2 4 4 - SW7 2 4 3 79 15-11-17 128433 10488931 SW7 2 4 4 SW7 2 4 3 Up Stream 59.99 60.1 300 9656 0 5 0 0 0 METITO SW_AV008 CRACK MINOR
SW9 32 6 - SW9 32 5 SW9 32 6 SW9 32 5 9604 0 5 0 0 0 ACIDR-034 - 2018-04-07 SW7 2 4 2 - SW7 2 4 1 81 15-11-17 135389 10488969 SW7 2 4 2 SW7 2 4 1 Up Stream 55.85 55.1 300 9666 0 5 0 0 0 METITO SW_AV008 CRACK MINOR
SW7 5 4 1 -  SW7 5 4 84 15-11-17 150449 10489160 SW7 5 4 1 SW7 5 4 Down Stream 35.22 34.6 300 9804 0 5 0 0 0 METITO SW_AV009 CRACK MEDIUM
SW9 32 3 - SW9 32 2 SW9 32 3 SW9 32 2 9765 0 5 0 0 0 ACIDR-035 - 2018-04-08 SW7 2 4 7 - SW7 2 4 6 86 15-11-17 126696 10488901 SW7 2 4 7 SW7 2 4 6 Down Stream 39.95 40.1 300 9655 0 5 0 0 0 METITO SW_AV009 DISPLACED JOINT MEDIUM
SW7 2 4 6 - SW7 2 4 5 87 15-11-17 126664 10488896 SW7 2 4 6 SW7 2 4 5 Up Stream 60.11 60.2 300 9857 0 5 0 0 0 METITO SW_AV009 CRACK MINOR
SW9 32 4 - SW9 32 3 SW9 32 4 SW9 32 3 9704 0 5 0 0 0 ACIDR-035 - 2018-04-08 SW7 2 4 5 - SW7 2 4 4 88 15-11-17 152048 10489182 SW7 2 4 5 SW7 2 4 4 Down Stream 59.9 60.1 300 9866 0 5 0 0 0 METITO SW_AV009 CRACK MEDIUM
M108 6 24 - M108 6 23 90 16-11-17 146802 10489452 M108 6 24 M108 6 23 Up Stream 48.81 46.6 300 9604 0 5 0 0 0 METITO SW_AV010
SW9 36 2 - SW9 36 1 SW9 36 2 SW9 36 1 9956 0 5 0 0 0 ACIDR-036 - 2018-04-09 M108 6 17 - M108 6 16 93 22-11-17 126709 10489252 M108 6 17 M108 6 16 Up Stream 50.06 50 300 9865 0 5 0 0 0 METITO SW_AV010
CRACK
CRACK
MINOR
MINOR

SW9 36 3 - SW9 36 2 SW9 36 3 SW9 36 2 9603 0 5 0 0 0 ACIDR-036 - 2018-04-09 M108 6 31 3 - M108 6 31 2


M100 2 3 - M100 2 2
108
118
28-11-17
29-11-17
144886
149296
10489435
10489506
M108 6 31 3
M100 2 3
M108 6 31 2
M100 2 2
Up Stream
Up Stream
41.09
40.88
40.5
40.6
200
300
9955
9804
0
0
5
5
0
0
0
0
0
0
METITO SW_AV013
METITO SW_AV014
SURFACE DAMAGE
CRACK
MINOR
MEDIUM
SW9 42 A3 - SW9 42 A2 SW9 42 A3 SW9 42 A2 9765 0 5 0 0 0 ACIDR-037 - 2018-04-10 M12 11 1 - M12 11 142 12-04-17 136066 10489312 M12 11 1 M12 11 Down Stream 34.33 33.3 300 9866 0 5 0 0 0 METITO SW_AV016 CRACK MEDIUM
M12 9 - M12 8 144 12-04-17 129153 10489283 M12 9 M12 8 Down Stream 45.98 47 300 9955 0 5 0 0 0 METITO SW_AV016 CRACK MINOR
SW9 41 6 - SW9 41 5 SW9 41 6 SW9 41 5 9985 0 5 0 0 0 ACIDR-038 - 2018-04-11 M12 8 - M12 7 145 12-04-17 127350 10489261 M12 8 M12 7 Down Stream 34.41 42.5 300 9856 0 5 0 0 0 METITO SW_AV016 CRACK MEDIUM
M8 4 - M8 3 149 12-05-17 134765 10489296 M8 4 M8 3 Up Stream 52.45 52 250 9766 0 5 0 0 0 METITO SW_AV016 CRACK MEDIUM
SW9 41 7 - SW9 41 6 SW9 41 7 SW9 41 6 9985 0 5 0 0 0 ACIDR-038 - 2018-04-11 M8 3 - M8 2 150 12-05-17 136135 10489318 M8 3 M8 2 Down Stream 55.06 53.5 300 9876 0 5 0 0 0 METITO SW_AV016 CRACK MEDIUM
SW5 6 16 16 4 4 - SW5 6 16 16 4 3 166 12-08-17 144484 10556699 SW5 6 16 16 4 4 SW5 6 16 16 4 3 Down Stream 48.65 48.7 300 9804 0 5 0 0 0 METITO SW_AV018 CRACK MEDIUM
SW9 41 4 1 A2 - SW9 41 4 1 SW9 41 4 1 A2 SW9 41 4 1 9997 0 5 0 0 0 ACIDR-039 - 2018-04-12 SW5 6 16 16 4 3 4 - SW5 6 16 16 4 3 3 172 12-09-17 150695 10556838 SW5 6 16 16 4 3 4 SW5 6 16 16 4 3 3 Up Stream 65.28 65 300 9804 0 5 0 0 0 METITO SW_AV019 SURFACE DAMAGE MEDIUM
SW5 6 19 18 1 1 - SW5 6 19 18 1 191 12-10-17 141767 10642526 SW5 6 19 18 1 1 SW5 6 19 18 1 Up Stream 63.06 60.7 300 9865 0 5 0 0 0 METITO SW_AV020 CRACK MINOR
SW9 41 4 - SW9 41 3 SW9 41 4 SW9 41 3 8503 1 4 1 1 1 ACIDR-039 - 2018-04-12 SW5 6 11 10 3 3 1 - SW5 6 11 10 3 3 201 12-12-17 149813 10556783 SW5 6 11 10 3 3 1 SW5 6 11 10 3 3 Up Stream 44.92 41.4 300 9967 0 5 0 0 0 METITO SW_AV021 COLLAPSE MAJOR

SW9 31 - SW9 30 SW9 31 SW9 30 9804 0 5 0 0 0 ACIDR-044 - 2018-04-21 SW5 6 7 8 7 - SW5 6 7 8 6


SW5 6 19 8 1 9 - SW5 6 19 8 1 8
230
238
12/15/2017
12/19/2017
134782
134778
10556660
10642586
SW5 6 7 8 7
SW5 6 19 8 1 9
SW5 6 7 8 6
SW5 6 19 8 1 8
Up Stream
Up Stream
48.31
38.01
47.7
62.2
300
300
9604
9995
0
0
5
5
0
0
0
0
0
0
METITO SW_AV024
METITO SW_AV025
CRACK
BREAK
MINOR
MAJOR

SW9 27 1 - SW9 27 SW9 27 1 SW9 27 9804 0 5 0 0 0 ACIDR-046 - 2018-04-23 SW5 6 19 17 1 1 6 - SW5 6 19 17 1 1 5 268 12/24/2017 127396 10642617 SW5 6 19 17 1 1 6 SW5 6 19 17 1 1 5 Up Stream 61.32 60.8 300 9603 0 5 0 0 0 METITO SW_AV026 CRACK MINOR
SW5 6 19 17 1 7 - SW5 6 19 17 1 6 277 12/24/2017 136147 10642639 SW5 6 19 17 1 7 SW5 6 19 17 1 6 Up Stream 41.72 40.9 300 9866 0 5 0 0 0 METITO SW_AV027 CRACK MEDIUM
SMH 8B CP1 - SMH 8B SMH 8B CP1 SMH 8B 9986 0 5 0 0 0 ACIDR-047 - 2018-04-24 SW5 6 19 14 1 6 - SW5 6 19 14 1 5 282 12/24/2017 148635 10642648 SW5 6 19 14 1 6 SW5 6 19 14 1 5 Up Stream 52.22 50.3 300 9705 0 5 0 0 0 METITO SW_AV027 MASS ROOTS MEDIUM

SW9 26 - SW9 25 SW9 26 SW9 25 9985 0 5 0 0 0 ACIDR-048 - 2018-04-25


SMH 4B CP2 - SMH 4B SMH 4B CP2 SMH 4B 9966 0 5 0 0 0 ACIDR-048 - 2018-04-25
SMH 4B CP1 - SMH 4B SMH 4B CP1 SMH 4B 9956 0 5 0 0 0 ACIDR-048 - 2018-04-25

Total Damaging Sections under W.O-5: Total Damaging Sections under W.O-4:
938 Section with Inspection Code 4-5 273 Section – 13.32 KM with inspection Code 4-5
Required Historical Data

1- CCTV inspection Reports for the areas which weren’t covered in the SICS Project.

2- List of the on going Construction Projects.

3- New projects Data such as ( As Build Drawing, Performance Test, CCTV, Wet test,…).
4- Previous snags list and rectification report for New Projects
5- List of the damaged Assets without Rectification.
6- Record of IR reports for last year.
7- List of the current Dewatering Permits.
Rainy Season 2020

• No. of Hotspots : 30 Hotspots.


• No. of Areas : 4 Areas. ( Area 12,13,14,and 16).
• No of Critical Substation : 1 Substations ( Meibareek)
• No. of Current Infrastructure Projects: To Be Discussed
• No. Of Underpass: 15 Nos (Gulf Mannai, Ras Abu Aboud, QP , Alsaad ,Jawaan, Asirr, Al-Atiyaa, Bustan,
Wholesale, Al-Azizya, Al-Ghanim, Industrial, F-Ring (Up 1,2).
• No. Of Highway: 20 Nos (C-Ring, D-Ring, Salwaa Road, Najma St, Mountaza St, Ras Abu Aboud, B-ring,
Corniche St, E-industrial Road, Mesaieed Road, F-Ring Road, Al-Furousiya, Al- Waab, E-Ring, Airport
St, Grund Hamad)
READINESS FOR RAINY SEASON

Areas NO. HOTSPOTS NO. OF TANKERS NO.OF PUMP

Najma Z-12 4 3 1

Old Air Port Z-13 6 4 2

Mamoura Z 14 8 9 1

Muberek Z-16 12 17 3

Total 30 33 7
CZF HOT SPOTS AND RESOURCES- MANPOWER

Shift Manager A Shift Manager A


HSE engineer Shift Manager B

Najma plan (Z-12) Old Airport plan (Z-13) Mamoura Plan (Z-14) Muberek Plan (16)
4 Hotspot 6 Hotspot 8 Hotspot 12 hotspot

3 Tanker 4 Tanker 9 Tanker 17 Tanker


1 Pumps 2 Pumps 1 pump 3 pump

Area Area Area Area Area Area


Engineer- Engineer- Engineer- Engineer- Area Area Engineer- Engineer-
Shift A Shift-B Shift A Shift-B Engineer- Engineer- Shift A Shift-B
Shift A Shift-B

Sup. 1 Sup. 2 Sup.1 Sup. 2 Sup. 2 Sup. 1 Sup.2


Sup. 1

17 17
4 4 6 6 8 HV HV
HV HV HV 8 HV
HV Driver Driver
Driver Driver Driver Driver HV Driver 17 17
25 25 14 14 Driver 2 Helper Helper
Helper Helper Helper Helper 2 Helper 3 3
1 Pickup 1 Pickup 3 3 Helper 1 Pickup OPR OPR
OPR OPR 1 Pickup
1 Pickup 1 Pickup
1 Pickup 1 Pickup
Assisting team # 1: Mechanic, Electrician ,
Assisting team # 2: Mechanic, Electrician ,
Tanker supplier coordinator ,Tanker accessories
and Pumps accessories Tanker supplier coordinator ,Tanker accessories
and Pumps accessories
Thanks for your attention