Mills r

PREVENTM MATNTENANCE SCHEDULE


Artistic Fabric
;;il,";il*"''
pcr4/MEo/4/007

(Mechanical) Date: 0l-07-2008


DEPARTMENT: SIZING

MACHINE MAKE MODEL PROD. CAPACITY SPECIAL FEATURES (IF ANY)


25000v2 meters per
Sizing Benninger 2003 &2004
day (24 hours)

PREVENTIVE MAINTENANCE
SR. # FREQUENCY REMARKS
ACTIVITIES

0l Inspection ofcreel. Daily

02 Inspection of steam system. Daily

03 Inspection of comb. Daily

Inspection of all pneumatic


04 Daily
system.

Inspection of all chemical


05 Daily
lines.

06
Check press lari bush & Daily
piston.

Inspection & maintenance


07 Monthlv Maintenance is done on requirement
creel over head crane.
Inspection & maintenance of
08 all pistons, brake shoe of Monthly Maintenance is done on requirement
creel.
Inspection & maintenance of
09 Monthly Maintenance is done on requirement
all bearings ofcreel adapter.
Inspection & maintenance of
l0 all size boxes guide rolls & Monthlv Maintenance is done on requirement
padder rolls.

11
Inspection & maintenance of Monthlv Maintenance is done on requirement
circulation gear pump.
Cleaning of all steam traps,
t2 steam filter, vacuum valve of Monthly
drvine cylinders.
Inspection & maintenance of
13 all drying cylinders, main Monthly Maintenance is done on requirement
drive gear box & piston.
Inspection & maintenance of
14 all tension rolls, piston & gear Monthly Maintenance is done on requirement
box.
Check comb moment system
16 Monthly
on head.
Artistic Fabric Mills
rso 9001-2000 PREVENTIVE MAINTENANCN SCTTEDULE PC}4/MEO/4/OO7

(Mechanical) Date:01-07-2008

Check loading unloading


17 Monthly
system ofbeam on head.

18 Check main gear box on head. Monthly

Inspection & maintenance of


t9 Monthlv Maintenance is done on requirement
cocker's pump & strainer.

Inspection & maintenance of


20 Monthly Maintenance is done on requirement
press lari bush & piston.
Inspection & maintenance of
21 steam header valves & steam Monthlv Maintenance is done on requirement
traps.
Inspection & maintenance of
22 all steam lines valves & safety Monthlv Maintenance is done on requirement
valves.
Remove all faults requested
23 Monthly
by production department.

PREPARED BY

MECHANICAL