Professional Documents
Culture Documents
15.06.2020
Qatar South
Catchment Zone Framework
METITO (Overseas) Qatar
Table of content
ORGANIZATION STRUCTURE
TAKAMUL PARTNER FOR MAINTAINING AND OPERATING THE NETWORK
S.
Description Unit Inspection Target Cleaning Target
N
1 R M (Including Valve Chambers / Discharge Chambers) LM 1,409 0
6 Outfall Nos 20 6
8 EFAs Nos 24 0
9 Tanks Nos 33 0
SUMMARY OF CURRENT EAMS USAGE
May/June PM Plan
Jun-20
SL Time Assigned in
Service Request No. SMS to driver Time Arrived on site Completed Time Task Status Response Time Comments
NO EAMS
26042020-0027 - Its related to IR-S00530 which we already submitted before for the Groundwater Issue and we visited and inspected
Rainwater Flooding - the Reported Location today (03/05/2020) and found Stagnant Water in an open area at Street 292 wherein our team
1 11:03 AM 11:05 AM 11:48 AM 3:13 PM Completed 45
Ashghal Request did suction work on the site to remove the groundwater for your concerned and request which took 05 suction trips. In
from Engr. Diya. addition: This complaint was not receive on Metito Scheduler as it was assigned to Velosi.
We visited and inspected the Reported Location Today (05/05/2020) wherein our team found no any blockage nor
flooding from the SGW Gully. Customer requested only to change the SGW Gully location which located in-front of the
05052020-0024 – main gate as she informed that it will damaged the vehicle tires in the future. anywhere except from the parking area
2 11:15 AM 11:17 AM 12:02 PM 12:12 PM completed 47
Manhole Cover which is front of the customer gate. Need an immediate action from the concerned department to solve the customer
concerned issue to avoid repeated complaint in the future.
Here in site our team found ON Going Excavation work for a Project Work - Flood Prevention Scheme by Applus
06052020-0063 – Velosi for Ground and Surface Water and during the excavation work they dump the water from the said excavation
3 1:44 PM 1:46 PM 2:28 PM 3:27 PM Completed 44
External Flooding which lead in an open area. Our team took water sample for water conductivity and the result found to be
Groundwater. Contractor Responsibility.
11052020-0031 – Our team went on the site and didn't found any blockage nor flooding wherein our team called the customer to asked
4 Sewer Back Up / (No 11:12 AM 11:14 AM 11:46 AM 12:35 PM Completed 34 the exact location concerned issue and the customer request to get the car key which fall down inside the SGW
flooding / spillage) Gully. Our team helped the customer give to the customer his car key. No problem as for this moment.
Dewatering Blue Hose belongs to MACE Company came out from SGW Manhole which lead to External Flooding on
11052020-0034 – the said area wherein our team coordinated with the Site Foreman - Mr. Inbul (70945287) and the Pump Operator Mr.
5 11:17 AM 11:19 AM 12:03 PM 12:13 PM Completed 46
External Flooding Dholu (77415795) about the concerned issue and they switch off the concern pump. No suction done as the flooded
water automatically flows to the said SGW Manhole.
Our team went on the site and inspected the reported location and they found Soakaway Manhole and surface rain
22052020-0037 –
6 10:45 PM 10:47 PM 11:39 PM 12:49 AM Completed 54 water Gully drop water Over flowing issue, As per customer request we have removed that Water by Suction and
External Flooding
clean that Gully drop, So Now no more issue.
It's related to IR-S00621 which we already submitted before as a (Groundwater Issue) network team already provide a
07062020-0029 –
7 10:16 AM 10:18 AM 11:39 AM 11:52 AM Completed 83 pump machine as a temporary solution but now the customer are requesting to remove the pump machine as there
External Flooding
was no any ground water on the site. UCC (Contractor issue).
08062020-0096 – Customer House Connection Chamber Illegally connected to SGW Soak-away Manhole and the TEMALCO Contractor
8 7:15 PM 7:17 PM 9:59 PM 10:07 PM Completed 164
External Flooding already working on the site for a New House Connection Chamber. Contractor Responsibility.
11062020-0056 – Its related to IR-S00582 which we already submitted before for Requested SGW Network & Reinstatement of Road
9 12:23 PM 12:25 PM 1:21 PM 1:26 PM Completed 58
External Flooding Level.
SUMMARY OF CURRENT EAMS USAGE
May-20
Total Dispatched WO 448 Total Dispatched WO 4
PM CM
Total Completed WO 448 Total Dispatched WO 4
9 PS already taken, 8 PS to be taken till end of June, 1 PS under refurbishment & 1 PS OBA shaft was
demolished.
Assets are not registered yet through EAMS – Manual work order is done
SGW-TF 1.1
MAY 2020 – SGW-TF 1.1
MAY 2020 – SGW-TF 1.1
MAY 2020 – SGW-TF 1.1
MAY 2020 – SGW-TF 1.1
MAY 2020
SGW-TF 1.2
MAY 2020 – SGW-TF 1.2
MAY 2020 – SGW-TF 1.2
MAY 2020 – SGW-TF 1.2
MAY 2020 – SGW-TF 1.2
MAY 2020
CORRECTIVE MAINTENANCE
SUMMARY
MAY 2020
SUMMARY OF EAMS REGISTER HANDED OVER
1 1
P008-C2-J3-UP1
6 1
P012 Al Muntazah Street Extension (6 Ps)
May 1 1
DW079 SGW Network
1 1
P012 Shaft-2 Ps
1 1
P012 Shallow System & Tanks
1 1
June
DS016-P01- SW11 Network
1 1
UM-Doom Network
CATCHMENT ZONE FRAMEWORK
PROJECT ID: AA-DOM /2018/M/1867/G
PFC - QATAR SOUTH - ORGANIZATION CHART
GENERAL SHEET -KEY & CORE TEAM
FRAMEWORK MANAGER
VINCENT LEROUX
RRRU
CUSTOMER SERVICE
HSE MANAGER QA/QC MANAGER OPERATION MANAGER TECHNICAL MANAGER COORDINATOR
MANAGER
MOHAMED GABR BURHANUDDIN JUNAIDI MINA YACOUB ESSAM ABDUL BAKY EHAB FATHI GAMAL IBRAHIM
WORKS MANAGER
WORKS MANAGER WORKS MANAGER WORKS MANAGER WORKS MANAGER WORKS MANAGER
TBA
AHMED NAGIEB AMR SABRY ALI ABOUTALEB NADER KHALIL SYED HASIB
MAINTENANCE TEAM
FOUL SEWER NETWORK REFER TO PAGE 10 OF18
REFER TO PAGE 05 OF18 REFER TO PAGE 11 OF18
REFER TO PAGE 03 OF
REFER TO PAGE 12 OF18
18
CIVIL TEAM REFER TO PAGE 13 OF18
REFER TO PAGE 08 OF 18 REFER TO PAGE 09 OF 18 REFER TO PAGE 14 OF18 REFER TO SHEET 18 OF 18
SGW NETWORK
REFER TO PAGE 07OF 18 REFER TO PAGE 15OF18
REFER TO PAGE 04OF REFER TO PAGE 16OF18
18 REFER TO PAGE 17 OF18
OPERATION TEAM
REFER TO PAGE 06 OF
18
Allocation
Allocation of staff
of staff might
might be be impacted
impacted by COVID 19 by COVID 19 Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet 01 of 18
The
The proposed
proposed set-upset-up is for
is for initial initial
stage of thestage
projectof the
and project
it will andfor
be subject it review
will be subject
and for review
optimization as part ofand optimization
efficiency gain
Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet xx of xx
as part of efficiency gain
CATCHMENT ZONE FRAMEWORK
PROJECT ID: AA-DOM /2018/M/1867/G –
PFC - QATAR SOUTH - ORGANIZATION CHART
CUSTOMER SERVICES
HSE MANAGER QA/QC MANAGER FRAMEWORK MANAGER TECHNICAL MANAGER
QA/QC
SAFETY INSPECTOR CUSTOMER DNMC DEWATERING
ENGINEER SERVICE COORDINATOR FACILITATION
RASAQ YAQUB
DNMC DEWATERING
SAFETY OFFICER TEAM 1 TEAM 2 TEAM 3 COORDINATOR FACILIATION
ENGINEER ENGINEER ENGINEER MOHAMED ABDEL SALAM ENGINEER
• SUDHAKAR DABBRU HISHAM ALOKKA MOHAMED ZOURUB SARVARANAKUMAR SARVANA
INSPECTOR SHAFEEK N.S
INSPECTORS INSPECTORS INSPECTORS
ABDUL KHAIR
• SHEHZAD SHAFIQ • JAYAVEERAKUMAR MARI • MOHAMMED EL METWALLI • ADEL
MOZUMDER ANANDARAJ
• MANOJ KAPAR • HANEEF • JOBIN
JEYAPANDIAN
COMPLAINT GREAS TRAP /
OFFICER ILLEGAL
MOHAMMED FAHEEM DUMPING
INSPECTORS
JUN JUN PENANA ABAR • Mohammed Ansar
• Mohammed Riyas
RAY-AN NUESTRO
NITTIN SHARMA
TEAM(S)
House connection MOSAQEEM ( Reliever )
First response TSE
Line Blockage Team(s)
Flooding Driver (s)
Driver (s) Assistant technician(s)
Assistant technician(s)
Allocation
Allocation of staff
of staff might
might be be impacted
impacted by COVID 19 by COVID 19 Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet 02 of 18
The
The proposed
proposed set-upset-up is for
is for initial initial
stage of thestage
projectof the
and project
it will andfor
be subject it review
will be subject
and for review
optimization as part ofand optimization
efficiency gain
Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet xx of xx
as part of efficiency gain
CATCHMENT ZONE FRAMEWORK
PROJECT ID: AA-DOM /2018/M/1867/G –
PFC - QATAR SOUTH - ORGANIZATION CHART
GR01-SURFACE GROUND WATER NETWORK
FRAMEWORK MANAGER
VINCENT LEROUX
SIC, Shaft 8, Shaft 10, SW 1, Shaft 1, SW 9, RAUP 2, BTT Graveyard, IC26, RCOM, SW 5, RAUP 1, IC25, MUP, SW 17
Allocation
Allocationof
ofstaff
staffmight
mightbe beimpacted
impactedby byCOVID
COVID1919
The Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet 04 of 18
Theproposed
proposedset-up
set-upisisfor
forinitial
initialstage
stageof
ofthe
theproject
projectand
andititwill
willbe
besubject
subjectfor
forreview
reviewand
andoptimization
optimizationas
aspart
partof
ofefficiency
efficiencygain
Document Number : CZ002-PLN-G00-ORG-Rev 00– Sheet xx of xx
gain
List of Damaging Assets- QS
PREVENTIVE MAINTENANCE FOR SURFACE & GROUND WATER ASSETS IN QATAR SOUTH & DOHA SOUTH / INSPECTION DEFECT DETAILS
SIC_005 PREVENTIVE MAINTENANCE FOR SURFACE & GROUND WATER ASSETS IN QATAR SOUTH & DOHA SOUTH / INSPECTION DEFECT DETAILS
METITO OVERSEAS QATAR / ASHGHAL
WORKODER ASSET_LEN INSPECTED ASHGHAL
INSPECT_ID INSP_NO INSP_DATE ASSET_NO SECTION_FROM SECTION_TO DIRECTION PIPE DIA RHP OCL CLASS T CLASS S CLASS R VIDEO_FILE REMARKS CONDITION
_NO GTH _LENGTH _GRADE
VELOSI/ASHGHAL SW7 2 15 5 - SW7 2 15 4
SW7 2 15 4 1 - SW7 2 15 4
3
4
30-10-17
30-10-17
137180
149544
10489026
10489141
SW7 2 15 5
SW7 2 15 4 1
SW7 2 15 4
SW7 2 15 4
Down Stream
Down Stream
55.73
59.83
54.5
59.3
300
300
9876
9855
0
0
5
5
0
0
0
0
0
0
METITO SW_AV001
METITO SW_AV001
CRACK
CRACK
MINOR
MINOR
INSPECT_ID FROM_MH TO_MH RHP OCL ASHGHAL_GRADE CLASS T CLASS S CLASS R VIDEO_FILE SW7 2 15 4 2 - SW7 2 15 4 1
SW7 2 15 3 - SW7 2 15 2
5
6
30-10-17
30-10-17
149090
126791
10489125
10488909
SW7 2 15 4 2
SW7 2 15 3
SW7 2 15 4 1
SW7 2 15 2
Up Stream
Down Stream
56.47
44.12
55.9
44
300
300
9996
9956
0
0
5
5
0
0
0
0
0
0
METITO SW_AV001
METITO SW_AV001
CRACK
CRACK
MEDIUM
MINOR
SW9A 18 1 1 - SW9A 18 1 SW9A 18 1 1 SW9A 18 1 9656 0 5 0 0 0 ACIDR-019 - 2018-03-20 SW7 2 15 2 - SW7 2 15 1 8 31-10-17 126794 10488911 SW7 2 15 2 SW7 2 15 1 Down Stream 42.91 42.7 300 9996 0 5 0 0 0 METITO SW_AV001 CRACK MEDIUM
SW7 2 12 2 1 - SW7 2 12 2 15 31-10-17 151201 10489174 SW7 2 12 2 1 SW7 2 12 2 Down Stream 54.74 52.9 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW9A 14 A2 - SW9A 14 A1 SW9A 14 A2 SW9A 14 A1 9604 0 5 0 0 0 ACIDR-021 - 2018-03-22 SW7 2 12 1 - SW7 2 12 18 31-10-17 139611 10489056 SW7 2 12 1 SW7 2 12 Down Stream 44.02 42.1 300 9604 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW7 2 20 - SW7 2 19 19 01-11-17 149194 10489132 SW7 2 20 SW7 2 19 Up Stream 59.84 59.3 300 9955 0 5 0 0 0 METITO SW_AV002 DISPLACED JOINT MINOR
SW9 2 5 2 1 1 - SW9 2 5 2 1 SW9 2 5 2 1 1 SW9 2 5 2 1 9996 0 5 0 0 0 ACIDR-022 - 2018-03-24 SW7 2 19 - SW7 2 18 20 01-11-17 128298 10488927 SW7 2 19 SW7 2 18 Down Stream 60 60.3 300 9995 0 5 0 0 0 METITO SW_AV002 CRACK MINOR
SW7 2 18 - SW7 2 17 21 01-11-17 126793 10488910 SW7 2 18 SW7 2 17 Up Stream 60.11 59.6 300 9995 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW9 2 6 4 - SW9 2 6 3 SW9 2 6 4 SW9 2 6 3 10992 0 5 0 0 0 ACIDR-022 - 2018-03-24 SW7 2 17 - SW7 2 16 22 01-11-17 149112 10489127 SW7 2 17 SW7 2 16 Down Stream 43.96 44 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW7 2 15 1 - SW7 2 15 24 01-11-17 136465 10489000 SW7 2 15 1 SW7 2 15 Up Stream 42.92 43.1 300 9866 0 5 0 0 0 METITO SW_AV002 CRACK MEDIUM
SW9 2 10 1 2 1 - SW9 2 10 1 2 SW9 2 10 1 2 1 SW9 2 10 1 2 9987 0 5 0 0 0 ACIDR-023 - 2018-03-25 SW7 1 8 - SW7 1 7 29 04-11-17 148191 10489089 SW7 1 8 SW7 1 7 Down Stream 44.29 43.9 300 9604 0 5 0 0 0 METITO SW_AV003 CRACK MINOR
SW7 2 15 - SW7 2 14 32 05-11-17 150223 10489155 SW7 2 15 SW7 2 14 Up Stream 56.06 55.7 300 9603 0 5 0 0 0 METITO SW_AV003 CRACK MINOR
SW9 2 10 1 2 2 - SW9 2 10 1 2 1 SW9 2 10 1 2 2 SW9 2 10 1 2 1 8656 1 4 1 1 1 ACIDR-023 - 2018-03-25 SW7 2 14 - SW7 2 13 33 05-11-17 151200 10489173 SW7 2 14 SW7 2 13 Down Stream 60.08 60.5 300 9804 0 5 0 0 0 METITO SW_AV003 CRACK MEDIUM
SW9 2 13 2 - SW9 2 13 1 SW9 2 13 2 SW9 2 13 1 9803 0 5 0 0 0 ACIDR-024 - 2018-03-26 SW7 1 1 5 1 - SW7 1 1 5 37 05-11-17 136061 10488987 SW7 1 1 5 1 SW7 1 1 5 Down Stream 59.98 58.7 300 9996 0 5 0 0 0 METITO SW_AV004 BREAK MAJOR
SW7 1 1 6 - SW7 1 1 5 39 05-11-17 135217 10488959 SW7 1 1 6 SW7 1 1 5 Up Stream 60.06 59.7 300 9955 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW9 2 13 3 1 - SW9 2 13 3 SW9 2 13 3 1 SW9 2 13 3 9996 0 5 0 0 0 ACIDR-025 - 2018-03-27 SW7 1 1 4 - SW7 1 1 3 40 06-11-17 134688 10488944 SW7 1 1 4 SW7 1 1 3 Down Stream 39.93 39.5 300 9856 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW7 1 1 7 - SW7 1 1 6 41 06-11-17 141253 10489067 SW7 1 1 7 SW7 1 1 6 Down Stream 60 59.7 300 9766 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
SW9 2 5 2 1 - SW9 2 5 2 SW9 2 5 2 1 SW9 2 5 2 9997 0 5 0 0 0 ACIDR-026 - 2018-03-28 SW7 1 1 9 - SW7 1 1 8 43 06-11-17 150071 10489151 SW7 1 1 9 SW7 1 1 8 Down Stream 60.23 59.4 300 9866 0 5 0 0 0 METITO SW_AV004 CRACK MEDIUM
AW SW7 5 7 8 - AW SW7 5 7 7 48 06-11-17 149753 10489145 AW SW7 5 7 8 AW SW7 5 7 7 Up Stream 17.03 6.9 300 9002 0 5 0 0 0 METITO SW_AV005 SETTLED DEPOSIT MAJOR
SW9 12 1 1 - SW9 12 1 SW9 12 1 1 SW9 12 1 9996 0 5 0 0 0 ACIDR-028 - 2018-03-31 SW7 1 1 2 - SW7 1 1 1 55 07-11-17 140280 10489065 SW7 1 1 2 SW7 1 1 1 Up Stream 54.88 54.9 300 9866 0 5 0 0 0 METITO SW_AV005 CRACK MEDIUM
SW7 1 1 3 - SW7 1 1 2 56 07-11-17 151598 10489179 SW7 1 1 3 SW7 1 1 2 Up Stream 49.85 50.3 300 9956 0 5 0 0 0 METITO SW_AV005 DISPLACED JOINT MINOR
SW9 2 5 4 - SW9 2 5 3 SW9 2 5 4 SW9 2 5 3 9804 0 5 0 0 0 ACIDR-028 - 2018-03-31 SW7 5 7 1 - SW7 5 7 63 08-11-17 137171 10489024 SW7 5 7 1 SW7 5 7 Up Stream 59.94 59.6 300 9656 0 5 0 0 0 METITO SW_AV006 CRACK MINOR
SW7 5 5 - SW7 5 4 66 08-11-17 150450 10489161 SW7 5 5 SW7 5 4 Down Stream 60 60.1 300 9704 0 5 0 0 0 METITO SW_AV006 CRACK MINOR
SW 9 4 1 - SW 9 4 SW 9 4 1 SW 9 4 9865 0 5 0 0 0 ACIDR-029 - 2018-04-01 SW7 5 4 - SW7 5 3 67 08-11-17 134379 10488941 SW7 5 4 SW7 5 3 Up Stream 49.87 49.6 300 9604 0 5 0 0 0 METITO SW_AV006 CRACK MINOR
SW9 27 1 - SW9 27 SW9 27 1 SW9 27 9804 0 5 0 0 0 ACIDR-046 - 2018-04-23 SW5 6 19 17 1 1 6 - SW5 6 19 17 1 1 5 268 12/24/2017 127396 10642617 SW5 6 19 17 1 1 6 SW5 6 19 17 1 1 5 Up Stream 61.32 60.8 300 9603 0 5 0 0 0 METITO SW_AV026 CRACK MINOR
SW5 6 19 17 1 7 - SW5 6 19 17 1 6 277 12/24/2017 136147 10642639 SW5 6 19 17 1 7 SW5 6 19 17 1 6 Up Stream 41.72 40.9 300 9866 0 5 0 0 0 METITO SW_AV027 CRACK MEDIUM
SMH 8B CP1 - SMH 8B SMH 8B CP1 SMH 8B 9986 0 5 0 0 0 ACIDR-047 - 2018-04-24 SW5 6 19 14 1 6 - SW5 6 19 14 1 5 282 12/24/2017 148635 10642648 SW5 6 19 14 1 6 SW5 6 19 14 1 5 Up Stream 52.22 50.3 300 9705 0 5 0 0 0 METITO SW_AV027 MASS ROOTS MEDIUM
Total Damaging Sections under W.O-5: Total Damaging Sections under W.O-4:
938 Section with Inspection Code 4-5 273 Section – 13.32 KM with inspection Code 4-5
Required Historical Data
1- CCTV inspection Reports for the areas which weren’t covered in the SICS Project.
3- New projects Data such as ( As Build Drawing, Performance Test, CCTV, Wet test,…).
4- Previous snags list and rectification report for New Projects
5- List of the damaged Assets without Rectification.
6- Record of IR reports for last year.
7- List of the current Dewatering Permits.
Rainy Season 2020
Najma Z-12 4 3 1
Mamoura Z 14 8 9 1
Muberek Z-16 12 17 3
Total 30 33 7
CZF HOT SPOTS AND RESOURCES- MANPOWER
Najma plan (Z-12) Old Airport plan (Z-13) Mamoura Plan (Z-14) Muberek Plan (16)
4 Hotspot 6 Hotspot 8 Hotspot 12 hotspot
17 17
4 4 6 6 8 HV HV
HV HV HV 8 HV
HV Driver Driver
Driver Driver Driver Driver HV Driver 17 17
25 25 14 14 Driver 2 Helper Helper
Helper Helper Helper Helper 2 Helper 3 3
1 Pickup 1 Pickup 3 3 Helper 1 Pickup OPR OPR
OPR OPR 1 Pickup
1 Pickup 1 Pickup
1 Pickup 1 Pickup
Assisting team # 1: Mechanic, Electrician ,
Assisting team # 2: Mechanic, Electrician ,
Tanker supplier coordinator ,Tanker accessories
and Pumps accessories Tanker supplier coordinator ,Tanker accessories
and Pumps accessories
Thanks for your attention