Engineering Procurement Directorate

Summary of Local Contractors' Performance Evaluation


Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

Omo-Maji Design and Build Road


1 772,077,818.33 3.0 20-Feb-17 55.9 69.9 64.3 89.75 80.0 No
Project; Contract II: Sai-Maji

Melkasa-Sodere-Nuraera-
2 Yencomad 1,440,812,001.09 4.0 1-Jan-18 56.1 70.1 54.0 61.99 50.01 47.4 41.3 3 2 43.29 No Pass
Metehara

3 Adiarkay - Telmet 1,981,378,049.64 4.0 17-Jan-19 36.0 45.0 41.4 20.27 80.1 No

4 Koshe-Mito-Werabe Road Project 1,850,695,155.03 4.0 23-Oct-20 36.0 45.0 20.2 24.11 20.4 No

5 Degolo - Kelela Road Project 1,469,861,944.62 3.0 8-Apr-17 70.0 87.5 62.8 84.99 42.9 No

6 Debrebirhan - Ankober Sunshine 1,623,194,217.85 6.0 23-Oct-18 36.7 45.9 44.3 70.85 39.51 91.0 35.7 4 3 38.73 No Pass

7 Guguftu-Wereilu-Degolo 1,425,504,421.31 3.0 23-Aug-18 52.9 66.2 38.3 32.68 30.9 No


Debre Birhan - Deneba - Lemi
8 3,613,766,908.69 4.0 30-Nov-20 48.0 60.0 19.0 9.62 9.9 No
and Jihur - Deneba

9 Kong-Begondi-Wenbera 1,587,200,899.42 3.0 11-Jan-13 85.6 107.0 113.7 100.91 100.0 Yes

Jinka -Hana DB Road Project Lot-


10 1,373,268,271.09 3.0 3-Feb-16 70.8 88.6 76.9 70.22 67.1 No
1: Jinka-Mendir
Ankober -Awash Arba Road
11 Upgrading Project Contract 729,174,335.28 3.0 12-Sep-16 50.0 62.5 69.6 81.57 100.0 Yes
2:Dulecha-Awash Arba
Yabelo Town Bypass Road
12 296,853,599.16 4.0 8-Jan-20 26.1 32.6 29.7 62.90 77.7 No
Project
Sawla - Maji, Lot-III: Salayesh -
13 508,349,626.36 3.0 5-Nov-20 24.0 30.0 19.8 8.07 37.9 No
Omo Road Project

Limu Mazoria – Kose – Seka – Not qualified


Atango – Alga – Seyo – Shenen – ECWC 46.20 57.7 7 10.1 67.84
for tendering
Guder Road Project, Lot 2: Seka –
14 3,640,009,480.12 3.0 9-Dec-20 42.0 52.5 18.7 2.21 13.0 No
Atango – Alga – Seyo – Shenen –
Guder, Contract 2: Seyo –
Shenen – Guder Road Project

Halaba - Angacha - Wato


15 (including Damboya-Durame 1,980,658,256.31 4.0 29-Dec-20 36.0 45.0 18.0 8.32 16.5 No
Spur) Road Project

16 Gishen Junction 1,316,700,000.00 4.0 27-May-20 30.0 37.6 25.1 3.57 38.7

Guba - Begondi - Wonbera,


17 Contract 1: Aysid - Kong Road 201,230,932.85 2.0 - - No
Project

Ginchi - Kachise -Chuleti; Contract


18 1,028,300,956.71 3.0 11-Oct-17 61.4 76.8 56.6 67.04 44.6 No
1: Ginchi - Shikute (59 km)

Construction Works of
19 Alemketema - Degolo Road 1,280,770,840.15 3.0 28-Apr-17 66.7 83.4 62.1 52.29 45.2 No
Project
Gemeshu
Ginchi - Kachise -Chuleti; 58.86 45.0 2.0 - 44.96 Pass
20 Beyene GC 1,267,054,518.94 3.0 31-Dec-19 32.6 40.7 30.0 15.23 44.6 No
Contract 2: Shikute - Chuleti

Nekemte-Soge-Kamashe-Koncho;
21 1,923,629,581.78 6.0 24-Mar-21 36.0 45.0 15.2 - 11.6 No
Lot 2: Km 105-km 160
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

Nekemte-Soge-Kamashe-Koncho;
22 2,359,484,513.18 4.0 22-Feb-21 36.0 45.0 16.2 - 13.4 No
Lot 1: Nekemte - Km 105
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

23 Fik-Hamero Lot I Road Project 849,129,220.55 3.00 2-May-17 55.8 69.7 62.0 97.91 72.2 No

24 Adaba-Angetu Road Project 1,441,107,219.65 4.0 18-Nov-14 74.3 92.9 91.4 81.90 96.1 No

25 Warder - Kebridehar Road Project 1,814,123,577.90 4.0 10-Jun-19 48.0 60.0 36.7 40.42 33.7 No
Macro General
Not qualified
Contractor and 42.30 41.0 5.0 4.50 45.45
Fik - Segeg - Gerbo - Denan; Lot for tendering
Trading
26 II; Segeg - Gerbo - Yoale (Km 1,232,011,537.11 4.0 7-Jun-21 42.0 52.5 12.8 5.15 5.3 No
90+000 - Km 191+000)
Dubti - Arrisa - Adigala -
Biyokebob; Lot II: KM 72+000 -
27 1,482,000,000.00 4.0 27-May-21 36.0 45.0 13.1 5.12 8.0 No
KM150+000 Design and Build
Road Project

28 Dalol/Musli-Bada Road Project 1,249,624,731.89 3.00 28-Jan-16 49.8 62.3 77.1 89.05 100.0 Yes

Beles-Mekane Birhan Road


29 1,018,952,362.90 4.00 1-Nov-16 47.4 59.3 68.0 53.68 100.0 Yes
Project

Taremaber-Meleya-Molale' Defence
30 1,906,200,296.75 4.00 24-Dec-18 47.7 59.7 42.2 18.28 42.0 No Not qualified
Molale-Sefemeda Road Project Construction 31.01 48.4 5.0 4.50 52.87
for tendering
Enterprise (DCE)
Continuation of Ambo - Wolliso
31 1,264,907,396.11 3.00 26-Nov-19 32.2 40.3 31.1 29.73 47.7 No
Road Project

Guliso - Cheliya - Kondala - Begi,


Lot 1: Guliso - Km 70 (Babo
32 2,249,729,760.10 4.00 24-Feb-21 48.0 60.0 8.2 - 2.1 No
Debeka) Design and Build Road
Project

Construction Works of Kelela-


33 568,348,055.38 3.00 22-Jan-19 24.0 30.0 41.3 36.95 100.0 Yes
Akesta Road Project

Fik - Segeg - Gerbo - Denan Road Diriba Defersha


34 Project; Lot I: Fik - Segeg (Km General 1,422,968,463.05 4.00 30-Aug-21 42.0 52.5 10.0 9.80 6.45 3.6 4.2 2 0.0 4.19 No Pass
0+000 - Km 90+000) Contractor

Gimbi – Guye – Alga - Metu Road


35 1,835,358,164.34 6.00 8-May-21 48.0 60.0 13.7 3.86 4.6 No
Project; Lot -1: Gimbi – Km 70

Durgi - Gibe River; Contract 2: Bridge


36 618,949,405.50 4.00 1-Aug-17 63.1 78.9 59.0 87.40 87.40 45.5 45.5 1.0 - 45.47 No Pass
Durgi (km97+700-km125+400) Construction

Construction Works of Asaita-


37 1,691,940,084.78 4.0 26-Aug-19 42.5 53.2 34.2 69.15 36.4 No
Afambo – Djibouti Border
ASER
37.34 20.2 2.0 - 20.16 Pass
Construction Plc
Haik - Bitsma - Chifra Road
38 2,138,481,835.73 4.0 22-Dec-20 51.5 64.4 18.2 12.18 7.3 No
Project

39 Dabat - Ajire Road Project 931,304,149.54 4.0 10-Oct-16 77.3 96.6 68.7 85.66 42.3 No

40 Ajire - Keraker Road Project 1,158,659,797.00 4.0 21-Sep-18 50.3 62.9 45.3 59.05 43.1 No
Powercon 41.21 24.8 4.0 3.00 27.85 Pass
Haik - Bitsma - Chifra Road
41 2,138,481,835.73 4.0 22-Dec-20 51.5 64.4 18.2 12.18 7.3
Project
Sodo Junction )Dimtu)-Bilate
42 2,375,680,864.47 4.0 14-Apr-22 36.0 45.0 2.5 0.16 - No
Military Training Center
43 Babille-Fik Lot I 432,482,654.80 4.0 2-May-17 63.3 79.1 62.0 79.04 48.6 No

44 Debre Markos - Debre Elias 1,299,644,371.61 4.0 18-Sep-19 40.3 50.3 33.4 47.92 38.2 No
Gode – Hargele, Lot 1: Gode – FAL General
45 1,893,759,386.74 4.0 6-Oct-20 48.0 60.0 20.8 21.98 33.95 12.3 23.1 4.0 3.00 26.08 No Pass
Km 100 Road Project Construction PLC
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

Mankusa - Birsheleko (Defense


46 972,716,279.92 4.0 8-Mar-21 36.0 45.0 15.7 18.54 12.6 No
Camp) - 145 Kebele Road Project
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

47 Babille-Fik Lot II Road Project 461,423,813.70 4.0 2-May-17 55.4 69.3 62.0 79.76 73.6 No

Hawela – Tula – Weteraresa –


48 1,829,883,516.96 4.0 3-Nov-20 42.0 52.5 19.9 4.33 14.8 No
Yayu – Werachie Road Project
Tenta - Gashena, Contract 2:
49 Kurba Junction (Chegoma) - 1,434,519,841.46 4.0 21-Dec-20 36.0 45.0 18.3 3.28 17.0 No
Gashena Road Project

Omo - Maji, Lot 1: Omo - Sai Yotek Not qualified


50 1,888,508,656.68 4.0 10-Dec-20 36.0 45.0 18.6 6.21 10.00 17.6 13.6 6.0 6.75 20.37 No
Design and Build Road Project Construction PLC for tendering
Gelago – Tewodros Ketema
51 1,770,605,838.13 4.0 1-Apr-21 36.0 45.0 15.0 3.45 11.2 No
Road Project
Debre Markos - Debre Eliyas -
52 Temcha - Kuch - Ayehu - Zigem - 2,151,052,000.00 4.0 17-May-21 36.0 45.0 13.4 3.48 8.5 No
Chagni; Lot 3 : Kuch - Ambla

Jiga - Quarit - Arbgebeya - Sekela -


53 Tilili Road Project; Contract 1; 2,171,066,618.10 4.0 12-Oct-21 36.0 45.0 8.6 15.03 3.4 No
Jiga - Quarit - Arbgebeya

54 Assosa-Daleti Lot 1 228,630,902.66 3.0 7-Mar-17 60.8 76.0 63.8 77.11 60.0 No
Senan
19.97 14.9 2.0 - 14.93 Pass
Construction Plc.
55 Eliya - Makuye 1,083,400,000.00 4.0 23-Jul-21 36.0 45.0 11.2 7.91 5.4 No

Assosa-Daleti-Baruda, Contract 2:
56 772,048,982.83 4.0 1-May-17 63.7 79.7 62.0 63.96 48.1 No
Km 36+000 - Dabus - Baruda
Dangla - Jawi Design and Build Enyi
57 2,247,404,541.84 4.0 3-Jun-21 42.0 52.5 12.9 9.05 15.93 5.3 11.49 3.0 2.00 13.49 No Pass
Road Project Construction
Homosha – Hidassie Dam; Lot-1:
58 2,081,401,426.09 4.0 13-Jul-21 42.0 52.5 11.6 5.55 4.5 No
Homosha – Km 70

Orchid Business Not qualified


59 Gambella-Ilya 1,065,574,658.87 4.0 10-May-17 51.8 64.8 61.7 30.98 30.98 88.0 88.0 1.0 - 88.05 No
Group for tendering

60 Azezo - Gonder Road Project 871,565,791.41 2.0 27-Oct-17 59.3 74.1 56.1 55.27 46.3 No

Robe -Gasera - Ginir; Contract 1:


61 769,860,000.00 4.0 1-Nov-17 36.0 45.0 56.0 54.94 100.0 Yes
Robe - Gasera Road Project
Rama Not qualified
Bishoftu - Chefe Donsa - 21.20 21.1 5.0 4.50 25.57
62 Construction 914,847,890.47 4.0 27-Nov-19 40.8 51.0 31.1 31.78 33.6 No for tendering
Sendafa Road Project
Agaro - Gera - Medabo Road
63 3,170,122,200.00 4.0 25-Feb-21 48.0 60.0 16.1 9.43 6.1 No
Project

64 Weyito - Turmi Road Project 2,843,185,710.00 4.0 27-May-21 48.0 60.0 13.1 11.34 4.6 No

Construction Works of Road


65 Research Center (RRC) Building 413,863,169.71 0.5 21-Oct-16 56.5 70.6 68.3 92.09 91.9 No
and Its Facilities at Addis Ababa

Robe -Gasera - Ginir; Contract 1: Afro Tsion Not qualified


66 769,860,000.00 4.0 1-Nov-17 36.0 45.0 56.0 54.94 67.93 45.0 61.4 3.0 2.00 63.40 Yes
Robe - Gasera Road Project Construction Plc. for tendering

Robe -Gasera - Ginir (Contract 2:


67 km 60+000-km120+870.41) Road 841,602,019.19 4.0 9-Nov-18 36.0 45.0 43.7 34.02 92.7 No
Project
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

Bole Junction - Weterdeno Eshetu Lemma Not qualified


68 359,826,774.31 3.0 4-Oct-17 30.0 37.5 56.9 53.10 53.10 100.0 100.0 1.0 - 100.00 Yes
Horticulture and Bole Abomsa Road Contractor for tendering

Melcon Not qualified


69 Bahirdar – Tis Esat Road Project 957,930,208.44 4.0 16-Dec-19 35.9 44.9 30.5 19.81 19.81 39.5 39.5 1.0 - 39.52 No
Construction Plc. for tendering

70 Continuation of Werabe - Bojaber 795,000,000.00 4.0 1-Oct-19 43.5 54.4 33.0 40.73 33.3 No

Kunzila Horticulture Farm Zege Markan Trading


71 567,129,584.44 4.0 23-Jan-18 61.8 77.2 53.2 59.13 50.57 40.5 37.4 3.0 2.00 39.44 No Pass
Town Plc.
Jijiga - Gelesh - Deghamdo -
72 754,637,509.69 4.0 22-Jul-19 41.6 52.0 35.3 54.51 39.6 No
Segege, Lot 4

Powercon Plc in
JV with Tesfaye
73 Ajire -Keraker 1,158,659,797.00 4.0 21-Sep-18 50.3 62.9 45.3 59.05 59.05 43.1 43.1 1.0 - 43.15 No Pass
Legesse
Construction

74 Oblo-Dermi 800,793,953.72 4.0 9-Oct-18 36.0 45.0 34.8 83.09 47.6 No

Humbo Tsebela - Abaya


75 699,000,000.00 4.0 6-Oct-20 36.0 45.0 20.8 40.46 21.4 No
/Horticulture/
Segeg - Gerbo - Danan (Fik -
Segeg - Gerbo - Denen Lot 3: Cross Land
76 1,119,417,453.44 4.0 16-Jul-20 42.0 52.5 23.5 29.59 25.40 20.2 15.9 4.0 3.00 18.91 No Pass
Yoale - Danan (Km 191+000-Km Construction
273+844 )
Abay River Bridge and Approach
Road Design & Build Project, Lot
77 825,659,857.57 4.0 15-Sep-21 30.0 37.5 9.5 6.97 5.5 No
2: Abay River Bridge Approach
Road

78 Edo-Serofta-Warqa Road Project 1,687,343,877.25 4.0 24-Jan-19 50.7 63.4 41.2 57.93 37.0 No
Alemayehu
Negele Borena - Doloado - 40.15 25.5 2.0 - 25.49 Pass
Ketema GC
79 Melkasuftu, Lot 1 : Negele 1,371,325,369.08 4.0 30-Mar-21 36.0 45.0 15.0 18.27 11.3 No
Borena - Km 60
MCG
Negele Borena - Doloado - Construction PLC
80 Melkasuftu, Lot 1 : Negele in JV with 1,371,325,369.08 4.0 30-Mar-21 36.0 45.0 15.0 18.27 18.27 11.3 11.3 1.0 - 11.29 No Pass
Borena - Km 60 Alemayehu
Ketema GC
Omorate-Omo Bridge-Gynayom-
81 972,658,698.71 3.0 7-Feb-19 44.4 55.5 40.7 69.02 44.3 No
Kangaken
Gog-Jore-Akobo Raod Project
82 Contract 1 Lot I; km 0+000- 1,497,465,276.22 6.0 6-Aug-21 42.0 52.5 10.8 13.22 3.59 No
NKH Constrction
36+000 (Goge-Jore-Angella) 25.77 13.1 3.0 2.00 15.08 Pass
Plc.
Gambela –Abobo-Gog-Dima/Radd;
Lot III Km 72-Akuila-Achagna-
83 1,574,746,965.24 4.0 8-Oct-21 42.0 52.5 8.7 11.00 2.83 No
Dima/Radd Junction Design and
Build Road Project
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

84 Dongoro-Kingi-Mekebilla 477,299,213.00 4.0 31-Jan-19 46.0 57.5 41.0 69.31 42.45 No


Samson Cherinet
59.34 42.9 2.0 - 42.91 Pass
GC
85 Kimir Dingay/Debretabor-Guna 416,000,000.00 3.0 21-Oct-20 22.4 28.0 20.3 47.91 43.42 No

Gonji Kolela (Korie - Addisalem)


86 333,027,799.74 2.0 15-Apr-20 27.0 33.7 26.5 52.29 48.7 No
Road Project
Amara Road Not qualified
Dembecha – Feres bet – Adet 15.08 24.8 2.0 - 24.83
Work Enterprise for tendering
Road Project; Lot I: Dembecha -
87 1,790,005,720.67 4.0 23-Oct-20 36.0 45.0 20.2 8.16 20.4 No
Feres bet - Sekela & Bibugn
Wereda
Jigjiga - Fafen - Gelelesh -
88 Degehamedo - Segeg: (Lot 2 & 3 : 1,828,264,182.76 4.0 24-Sep-20 42.0 52.5 21.2 36.97 16.8 No
Km 55 - Km 165 + 220)
Beakea 23.43 11.5 2.0 - 11.52 Pass
Addis – Gibe River Road Overlay
89 1,465,539,629.05 4.0 10-Aug-21 36.0 45.0 10.7 6.54 5.0 No
Project; Lot II: Sebeta – Kore

Pawi - Guba (Mankush Town), Lot


90 2: Km 69+000 - Guba (Mankush 1,253,508,768.76 4.0 24-Dec-20 36.0 45.0 18.2 - 16.8 No
Town) Road Project
Jiga - Quarit - Arbgebeya - Tilili, DMC
91 Contract 2: Arbgebeya - Sekela - 1,673,300,137.71 4.0 1-Dec-20 36.0 45.0 18.9 20.58 12.00 18.1 10.5 2.0 - 10.46 No Pass
Construction PLC
Tilili Road Project
Dembecha - Feres Bet - Adet
92 Road Project; Contract II Sekela - 2,578,671,578.69 4.0 21-Jul-21 36.0 45.0 11.3 6.43 5.5 No
Adet
Yabelo - Metagefersa - Shakiso,
Contract 3: Dermi - Kenticha -
93 1,720,437,945.39 4.0 15-Oct-20 36.0 45.0 20.5 8.11 20.8 No
Shakiso Design and Build Road Walabu
Project Not qualified
Construction 7.52 8.5 1.0 - 8.52
for tendering
Nejo - Jarso - Begi - Yayo, Lot 1: Share Company
94 Nejo - Km 65 Design and Build 1,824,745,684.43 4.0 1-Jan-21 48.0 60.0 17.9 7.52 8.5 No
Road Project

95 Metu By-Pass Road Project 661,753,584.55 3.0 11-Feb-21 24.0 30.0 16.6 35.52 28.6 No
Oromia
Ambo town-Guder town Road Not qualified
96 Construction 1,038,722,506.06 4.0 16-Mar-21 24.0 30.0 15.5 27.58 11.77 25.6 10.9 3.0 2.00 12.89 No
Project for tendering
Corporation
97 Chanka - Gidami Road Project 3,206,772,589.87 3.0 20-Oct-21 48.0 60.0 8.3 1.75 2.5 No

Kibish
98 Bulbula - Alage Road Project 686,000,000.00 4.0 12-Nov-20 36.0 45.0 19.6 46.85 46.85 19.23 19.2 1.0 - 19.23 No Pass
Construction Plc.

Tiks Construction
Mankusa - Birsheleko (Defense
99 In Joint Ventury 972,716,279.92 4.0 8-Mar-21 36.0 45.0 15.7 18.54 18.54 12.56 12.6 1.0 - 12.56 No Pass
Camp) - 145 Kebele Road Project
with FAL GC
Engineering Procurement Directorate
Summary of Local Contractors' Performance Evaluation
Reporting Period End of June 2022
Reporting Period 30-Jun-22
1.25
Total contract Actual Aggregated Total Time elapsed
Revised Contract times Time No. of Additional
Mobilization period cumulative actual Average average is beyond 5/4 Pass/
I. Contractor's Price contract Elapsed Expected Contracts expected
Contract Name Period Commence considered progress to performance Expected expected of the Non
No. name (ETB) period (Months) Progress under progress
(months) ment Date for this date (%) (%) progress progress Contract Performing
(1.25* A) ( C) consideration (%)
Evaluation (A) (G) (in %) period
(B)

100 Combolcha Bypass 806,164,023.72 3.0 23-Jun-21 24.0 30.0 4.3 1.64 1.53 No

Yonab
Awash – Kulbi – Dire Dawa/Harar 6.63 5.0 2.0 - 5.04 Pass
Construction Plc.
Overlay Road Project; Contract 1:
101 478,385,156.18 3.0 5-Apr-21 36.0 45.0 14.8 15.05 10.95 No
Awash – Meiso (Km 0+000 –
70+500)

102 Jigjiga Bypass Road Project 672,098,730.28 4.0 14-May-21 18.0 22.5 13.5 11.60 32.92 No
Yirgalem Not qualified
15.88 27.0 2.0 - 27.00
Construction Plc. for tendering
103 Bonosha - Achamo Road Project 682,155,064.23 4.0 7-May-21 24.0 30.0 13.8 20.09 21.16 No

104 Shebele - Imi Road Project 249,613,616.05 1.5 15-Jul-21 10.0 12.5 11.5 - 80.14 No
Somali Roads Not qualified
- 80.1 1.0 - 80.14
Enterprise for tendering
105 Kubi River Bridge 113,055,906.20 3.0 8-Apr-22 12.0 15.0 2.7 - - No

DOGUSAN
Gode - Kelafo - Ferfer Lot 2: INSAAT TIC. A.S Not qualified
106 2,497,881,730.00 4.0 24-Aug-21 42.0 46.7 10.2 - - 3.72 3.7 1.0 - 3.72 No
Kelafo - Ferfer in JV with Rabah for tendering
and Sons PLC
Bure – Gomer Road Project, (Km
Midroc
0+000 – Km 41.30) and Bure Not qualified
107 Construction 1,365,798,491.89 3.0 21-Sep-21 36.0 40.0 9.3 2.46 2.46 4.18 4.2 1.0 - 4.18 No
Industrial Park Spur Road, for tendering
Ethiopia PLC
1.74km

Mankusa - Birsheleko(Defense
108 972,716,279.92 4.0 8-Mar-21 36.0 45.0 15.7 18.54 12.56 No
Camp) - 145 Kebele Road Project
Tiks Construction 8.30 7.8 2.0 - 7.79 Pass
Addis – Gibe River Road Overlay
109 1,651,808,351.17 4.0 10-Aug-21 36.0 45.0 10.7 2.27 4.99 No
Project; Lot III: Kore – Gibe River
Negele Borena - Doloado -
110 Melkasuftu, Lot 1 : Negele 1,371,325,369.08 4.0 30-Mar-21 36.0 45.0 15.0 18.27 11.29 No
Borena - Km 60 MCG
9.53 7.8 2.0 - 7.85 Pass
Construction PLC
Addis – Gibe River Road Overlay
111 1,651,808,351.17 4.0 10-Aug-21 36.0 45.0 10.7 2.27 4.99 No
Project; Lot III: Kore – Gibe River

Hafcon
Abay River Bridge and
Construction in
Approach Road Design & Build
112 JV with Cross 825,659,857.57 4.0 15-Sep-21 30.0 37.5 9.5 6.97 6.97 5.47 5.5 1.0 - 5.47 No Pass
Project, Lot 2: Abay River Bridge
Land
Approach Road
Construction

1 2
Formula to be
Category of Contract Period Contractors who failed to complete projects after one fourth of the
used
contract period elapsed beyond the Contract period will be
First (1/3)rd 6(t1)
disqualified
Second(1/3)rd 6+21(t2)
last (1/3)rd 27+23(t3)
Beyond Contract period 50+50(t4)