BHARATHI CEMENT CORPORATION (PVT) LTD

1×30 MW CPP - KADAPA


CHP SHIFT CHECK LIST -CPP
CONVEYOR AND DE SYSTEM CHECK LIST - A/B SHIFT
Sl.No Description BC7 BC1 BC2 BC3 BC4 BC5 DE-1 DE-2 DE-3 SHIFT REMARKS
1 Input Coupling guard provided A SHIFT
2 Output Coupling guard provided
3 Head pulley - Any abnormal sound
4 Bend pulley - Any abnormal sound
5 Snub pulley - Any abnormal sound
6 Tail pulley guard provided
7 Tail pulley - Any abnormal sound
8 VGTU Guard at Groung level / CW Pulley level
9 Any spillages in conveyors
10 Equipment abnormal sound
11 Pull chord switches & rope wires fixing - Both sides
12 Belt sway switches healthiness
13 Local Push Buttons healthiness
14 Hand railing along Conv.Gallery - Both sides are good
15 Platform openings - Gratings / Guard railing fixing are good CHP Operator
16 Platforms - All around Hand railing are good B SHIFT
17 Conveyor Roofing are ggod
18 DE system hopper empty
19 Coal screen reject percentage
20 General House Keeping
OTHER EQUIPMENTS CHECK LIST - A/ B SHIFT
LS LS Vibro LS vibro
Coal Coal LS primary Dense
feeder Bucket
Sl.No Description Crusher screen crusher
secondary feeder at LS screen phase
crusher hopper above Elevator
system
screen
1 Any abnormal sound in the system
2 Any spillage in the system
3 Working condition of the system
4 General House Keeping - All floors
5 Any leakage in the conveying line
CHP Operator
CHP PERFORMANCE
Bunker level- - A, B, C SHIFT C SHIFT
Bunker level- Control Bunker level- Boiler Bunker level- Boiler
Control room side Overall Qty
Sl.No Description room side LHS side RHS side LHS
BeforeRHS After Before After Before After Before After Tons
1 Shift A
2 Shift B
3 Shift C

SA Coal Pet Coke


Total
CHP Start CHP Stop BC-4
Sl.No Description Running BC-4 Initial BC-4 Final Total Qty BC-4 Final Total Qty
time time Initial
Hrs Reading Reading fed Reading fed
Reading
1 Shift A
2 Shift B CHP Operator
3 Shift C Shift In-Charge