CHP SHIFT CHECK LIST -CPP CONVEYOR AND DE SYSTEM CHECK LIST - A/B SHIFT Sl.No Description BC7 BC1 BC2 BC3 BC4 BC5 DE-1 DE-2 DE-3 SHIFT REMARKS 1 Input Coupling guard provided A SHIFT 2 Output Coupling guard provided 3 Head pulley - Any abnormal sound 4 Bend pulley - Any abnormal sound 5 Snub pulley - Any abnormal sound 6 Tail pulley guard provided 7 Tail pulley - Any abnormal sound 8 VGTU Guard at Groung level / CW Pulley level 9 Any spillages in conveyors 10 Equipment abnormal sound 11 Pull chord switches & rope wires fixing - Both sides 12 Belt sway switches healthiness 13 Local Push Buttons healthiness 14 Hand railing along Conv.Gallery - Both sides are good 15 Platform openings - Gratings / Guard railing fixing are good CHP Operator 16 Platforms - All around Hand railing are good B SHIFT 17 Conveyor Roofing are ggod 18 DE system hopper empty 19 Coal screen reject percentage 20 General House Keeping OTHER EQUIPMENTS CHECK LIST - A/ B SHIFT LS LS Vibro LS vibro Coal Coal LS primary Dense feeder Bucket Sl.No Description Crusher screen crusher secondary feeder at LS screen phase crusher hopper above Elevator system screen 1 Any abnormal sound in the system 2 Any spillage in the system 3 Working condition of the system 4 General House Keeping - All floors 5 Any leakage in the conveying line CHP Operator CHP PERFORMANCE Bunker level- - A, B, C SHIFT C SHIFT Bunker level- Control Bunker level- Boiler Bunker level- Boiler Control room side Overall Qty Sl.No Description room side LHS side RHS side LHS BeforeRHS After Before After Before After Before After Tons 1 Shift A 2 Shift B 3 Shift C
SA Coal Pet Coke
Total CHP Start CHP Stop BC-4 Sl.No Description Running BC-4 Initial BC-4 Final Total Qty BC-4 Final Total Qty time time Initial Hrs Reading Reading fed Reading fed Reading 1 Shift A 2 Shift B CHP Operator 3 Shift C Shift In-Charge