You are on page 1of 12

REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS

CONTRACT NO : 5311; FEES REF. NO : J-8049


SHUTDOWN SCHEDULE FOR CRS 403
20-Mar-22 21-Mar-22 22-Mar-22 23-Mar-22 24-Mar-22 25-Mar-22 26-Mar-22 27-Mar-22 28-Mar-22 29-Mar-22 30-Mar-22 31-Mar-22 1-Apr-22 2-Apr-22 3-Apr-22 4-Apr-22 ###
###

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM

10:00 AM
11:00 AM
12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM

12:00 PM
7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM

7:00 AM
8:00 AM
9:00 AM
1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM

1:00 PM
2:00 PM
3:00 PM
4:00 PM
5:00 PM
6:00 PM
7:00 PM
8:00 PM
Activity Details Start Finish Start Time Finish Time Start Time Finish Time Duration

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
SHUTDOWN PERIOD : 13 Mar 22 to 4 Apr'22

FRA / PERMIT 18-Mar-22 31-Mar-22 Days

Mechanical - FRA approval ( Piping) 18-Mar-22 20-Mar-22 7:00 AM 6:00 PM 18/Mar/22 07:00 AM 20/Mar/22 06:00 PM 2
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

E&I - F&G,RTU Permit approval 20-Mar-22 21-Mar-22 7:00 AM 6:00 PM 20/Mar/22 07:00 AM 21/Mar/22 06:00 PM 1
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PL AN PL AN PLAN PL AN PLAN PL AN PLAN

CRS-403

Pre Shut Down Activities 21-Mar-22 30-Mar-22 Days

Inergen system - Discharge Test 22-Mar-22 22-Mar-22 7:00 AM 6:00 PM 22/Mar/22 07:00 AM 22/Mar/22 06:00 PM 1
PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

E&I - F&G,RTU Cable Termination & Loop Checking (Permit Applied) 21-Mar-22 24-Mar-22 7:00 AM 6:00 PM 21/Mar/22 07:00 AM 24/Mar/22 06:00 PM 3
PLAN PLAN PLAN PLAN PL AN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Mechanical - 2" - Vent Line Tie-in (Welding, PWHT, NDT) 24-Mar-22 29-Mar-22 7:00 AM 6:00 PM 24/Mar/22 07:00 AM 29/Mar/22 06:00 PM 5
PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

HSSD modification (Tyco) 21-Mar-22 21-Mar-22 7:00 AM 6:00 PM 21/Mar/22 07:00 AM 21/Mar/22 06:00 PM 1
PLAN PLAN PLAN PLAN PL AN PL AN PLAN PL AN PLAN PL AN PLAN

Internal SAT for Metering Panel 22-Mar-22 25-Mar-22 7:00 AM 6:00 PM 22/Mar/22 07:00 AM 25/Mar/22 06:00 PM 3
PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Pre-Comm. & SAT for FACP 24-Mar-22 27-Mar-22 7:00 AM 6:00 PM 24/Mar/22 07:00 AM 27/Mar/22 06:00 PM 3
PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Pre-Comm. & SAT for IES - F&G Detectors including HSSD 27-Mar-22 30-Mar-22 7:00 AM 6:00 PM 27/Mar/22 07:00 AM 30/Mar/22 06:00 PM 3
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Pre-Comm. & SAT for Field F&G Detectors 27-Mar-22 29-Mar-22 7:00 AM 6:00 PM 27/Mar/22 07:00 AM 29/Mar/22 06:00 PM 2
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Pre-Comm. & SAT for HVAC 22-Mar-22 25-Mar-22 7:00 AM 6:00 PM 22/Mar/22 07:00 AM 25/Mar/22 06:00 PM 3
PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Pre-Comm. & Metering SAT 28-Mar-22 30-Mar-22 7:00 AM 6:00 PM 28/Mar/22 07:00 AM 30/Mar/22 06:00 PM 3
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

ISAT - FACP, F&G, FMP with RTU 30-Mar-22 30-Mar-22 7:00 AM 6:00 PM 30/Mar/22 07:00 AM 30/Mar/22 06:00 PM 1
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Shut Down Activities - 403-Mechanical 27-Mar-22 1-Apr-22 HRS

Bypass to be done by operations 27-Mar-22 27-Mar-22 10:00 AM 12:00 PM 27/Mar/22 10:00 AM 27/Mar/22 12:00 PM 8:00
PLAN PLAN

Demolition of Existing E&I connections 28-Mar-22 28-Mar-22 12:00 PM 6:00 PM 28/Mar/22 12:00 PM 28/Mar/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN

Detorquing of existing bolts and flange breaking 29-Mar-22 29-Mar-22 7:00 AM 9:00 AM 29/Mar/22 07:00 AM 29/Mar/22 09:00 AM 3:00
PLAN PLAN PLAN

Removal of Existing Spools 29-Mar-22 29-Mar-22 10:00 AM 11:00 AM 29/Mar/22 10:00 AM 29/Mar/22 11:00 AM 2:00
PLAN PLAN

Installation of new metering spool including valves 29-Mar-22 29-Mar-22 11:30 AM 2:00 PM 29/Mar/22 11:30 AM 29/Mar/22 02:00 PM 2:00
PLAN PLAN

Installation of balance spools to complete metering spool installation 29-Mar-22 30-Mar-22 2:00 PM 12:00 PM 29/Mar/22 02:00 PM 30/Mar/22 12:00 PM 4:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Torquing of all balance flanges 30-Mar-22 30-Mar-22 7:00 AM 6:00 PM 30/Mar/22 07:00 AM 30/Mar/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Tie-in of 2" VG flare line to the welded flange (Metering Spool) 30-Mar-22 30-Mar-22 7:00 AM 6:00 PM 30/Mar/22 07:00 AM 30/Mar/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

PWHT & NDT Works 31-Mar-22 31-Mar-22 7:00 AM 6:00 PM 31/Mar/22 07:00 AM 31/Mar/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Touch-up painting,colour coding, Stencilling 1-Apr-22 1-Apr-22 7:00 AM 6:00 PM 01/Apr/22 07:00 AM 01/Apr/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

MC & PSSR Walkdown 1-Apr-22 1-Apr-22 7:00 AM 6:00 PM 01/Apr/22 07:00 AM 01/Apr/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Shut Down Activities - 403 - Instrumentation & Control System 30-Mar-22 4-Apr-22 HRS

Cable glanding & Termination on the Flow Meter, PT & TT 30-Mar-22 31-Mar-22 7:00 AM 6:00 PM 30/Mar/22 07:00 AM 31/Mar/22 06:00 PM 20:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Tubing Connection for GC & PT 31-Mar-22 31-Mar-22 7:00 AM 6:00 PM 31/Mar/22 07:00 AM 31/Mar/22 06:00 PM 10:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Loop Check 31-Mar-22 1-Apr-22 7:00 AM 6:00 PM 31/Mar/22 07:00 AM 01/Apr/22 06:00 PM 30:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Metering Panel Testing & SAT (Phase-2) 2-Apr-22 3-Apr-22 7:00 AM 6:00 PM 02/Apr/22 07:00 AM 03/Apr/22 06:00 PM 20:00
PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN

Gas-in 4-Apr-22 4-Apr-22 7:00 AM 6:00 PM 04/Apr/22 07:00 AM 04/Apr/22 06:00 PM 10:00
PL AN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN PLAN
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CONTRACT NO : 5311; FEES REF. NO : J-8049

MAN POWER & EQUIPMENT DEPLOYMENT PLAN


METERING SPOOL INSTALLATION : CRS-402
DESIGNATION NOS REMARKS
MAN POWER DEPLOYMENT
Performing Authority (PA) 1
Job Performer (JP) 5
Supervisor (Mech) 1
Supervisor (E&I / PA) 1
Supervisor (Civil) 1
HSE Officer 1
QA/QC (Mechanical) 1
QA/QC (E&I) 1
QA/QC (Civil) 1
OEM Engineer (Rockwell) 1
OEM Engineer (Schneider) 1
OEM Engineer (Tyco) 1
OEM Engineer (Honeywell) 3
Commissioning Manager 1
E&I Engineer 1
Instrumentation Engineer 1
Instrument Fitter 2
Electrical Technician 4
E&I Helper 5
Pipe Fabricator 2
Pipe Welder 1
Rigging Supervisor 1
Rigger 1
Scaffolder 2
Mechanical Helper / Fire Watch / Banksman 4
Painter 1
Torqueing Technician 2
PWHT Technician 2
NDT Technician 2
LD Driver 2
Hiab Operator 1
Crane Operator 1
Trailer Driver 1

TOTAL 56

EQUIPMENT DEPLOYMENT
Pick-up 1
Coaster 1
Hiab 1
Crane (100 T) 1
Trailer 0
Torqueing Machine 2
Diesel Generator 1
Air Compressor 350 CFM 1

TOTAL 8
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CONTRACT NO : 5311; FEES REF. NO : J-8049
MAN POWER & EQUIPMENT LIST - METERING SPOOL INSTALLATION WORKS : CRS-402

SL. No. NAME DESIGNATION ACTIVITY CICPA VALIDITY BUHASA GATE MOBILIZATION ACCOMODATION ADNOC MEDICAL BUHASA H2S VALIDITY COVID-19 TEST REMARKS
PASS DATE REQUIREMENT INDUCTION DATE
1 DIRECT MAN POWER
1.01 Mukesh Murali Mohan Performing Authority (PA) Construction 20-Dec-21 Yes 21-Mar-22 No Done 20-Dec-23
1.02 Bala Murugan  Job Performer (JP) Construction 07-01-202 Yes 27-Mar-22 Done 18-Dec-22
1.03 Santhosh Kumar  Job Performer (JP) Construction 12-Jan-22 Yes 21-Mar-22 Done 18-Dec-22 SAP ID Login Issue
1.04 Anish Joseph Job Performer (JP) Construction 4-Jul-22 Yes 21-Mar-22 Done 7-Nov-23
1.05 Bryan Paul Job Performer (JP) Construction 1-Dec-21 Yes 21-Mar-22 Done 19-Oct-23
1.06 Sarath Job Performer (JP) Construction 1-Feb-22 Available 27-Mar-22 Done Inducted 7-Nov-23 JP Approval process to be initiated
1.07 Krishnakumar Commissioning Manager Construction 31-Dec-21 21-Mar-22 Required Done 14-Jan-22
Juned Fazl Mohammed Commissioning Engineer Commissioning 4-Jul-22 28-Sep-23 Mobilization to be confirmed
1.08 Milan Thomas Commissioning Engineer Commissioning 14-Jan-22 16-Jan-23
1.09 Favas KVP Commissioning Engineer Commissioning 7-Dec-21 18-Dec-22
1.10 Lijo Commissioning Spv Commissioning 5-Mar-22
1.11 Naheem Aboobacker E&I Engineer Construction 4-Jul-22 Yes 21-Mar-22 Done 21-Apr-23
1.12 Ashok Kumar Instrumentation Engineer Construction 4-Jul-22 Yes 21-Mar-22 Done 2-Oct-23
1.13 Akhil Murali Supervisor (Mech) Construction 9-Feb-22 Yes 27-Mar-22 Done 15-Aug-23
1.14 Syed Abdhahir Supervisor (E&I / PA) Construction 31-Jan-22 Yes 21-Mar-22 Done 21-Apr-23 Backup JP
1.15 Aji Kumar Supervisor (Civil) Construction 31-Jan-22 Yes 27-Mar-22 Done 9-Jul-23
1.16 Mohammad Jawed Khan HSE Officer Construction 31-Jan-22 Yes 21-Mar-22 Done 21-Apr-23
1.17 Mohammad Khalid QA/QC (Mechanical) Construction 26-Dec-21 Yes 27-Mar-22 Done 3-Dec-23
1.18 Amir Khan QA/QC (E&I) Construction 26-Dec-21 Yes 21-Mar-22 Done 21-Oct-23
1.19 Chandran Ponmalary QA/QC (Civil) Construction 31-Jan-22 Yes 27-Mar-22 Done 19-Feb-23
1.20 Prabhu Muniyandi OEM Engineer (Rockwell) F&G 10-Jan-22 Available 25-Nov-21 Required Done Inducted 30-May-23
1.21 Jouhar Noottadayil OEM Engineer (Schneider) RTU 13-Feb-22 Available 28-Nov-21 Required Done Inducted 2-Jan-23
1.22 Riyas Kunjumon OEM Engineer (Tyco) HSSD 26-Dec-21 Pending 28-Nov-21 Required Done Pending 12-Nov-23
1.23 Amritendu OEM Engineer (Honeywell) DCS 9-Dec-21 Pending Err:509 Required Pending 18-Oct-23 Already Inducted. Details to be shared
1.24 Insaf Sharafudheen OEM Engineer (Honeywell) Metering 31-Dec-21 Available 21-Mar-22 Required Done Inducted 20-Dec-22
Akshay OEM Engineer (Honeywell) Metering Mobilization to be confirmed
1.25 Saloman Instrument Fitter E&I 20-Dec-21 Yes 30-Mar-22 Done 2-Jan-23
1.26 Anil Kumar Guptha Instrument Fitter E&I 20-Dec-21 30-Mar-22 Done 22-Dec-22
1.27 Muhammed Jawed Alam Electrical Technician E&I 1-Feb-22 Yes 21-Mar-22 Done 1-Feb-23
1.28 Wajid Ali Electrical Technician E&I 3-Dec-21 21-Mar-22 Done 1-Feb-23
1.29 Jai Govind patel Electrical Technician E&I 20-Dec-21 21-Mar-22 Done 17-Jan-23
1.30 Maseer Alam Electrical Technician E&I 4-Mar-22 21-Mar-22 Done 1-Feb-23
1.31 Shiv Kumar Ram Bahadur E&I Helper E&I 14-Jan-22 Yes 21-Mar-22 Done 1-Mar-23
1.32 Banarshi Prasad E&I Helper E&I 14-Jan-22 Yes 21-Mar-22 Done 1-Mar-23
1.33 Lovepreet Singh E&I Helper E&I 15-Nov-22 21-Mar-22 Done 25-Dec-22
1.34 Ajay Kumar E&I Helper E&I 13-Jan-22 Yes 21-Mar-22 Done 1-Mar-23
1.35 Tantan Ramayan E&I Helper E&I 28-Feb-22 Yes 21-Mar-22 Done 14-Nov-21
1.36 Ganesh Mogili Pipe Fabricator Mechanical 9-Dec-21 Yes 27-Mar-22 Done 8-Jan-23
1.37 Sunil Kumar Yadav Pipe Fabricator Mechanical 9-Dec-21 Yes 27-Mar-22 Done 30-Jul-23
1.38 Basiruddin Ansari Pipe Welder Mechanical 20-Dec-21 Yes 27-Mar-22 Done 2-Jan-23
1.39 Satheesh Sundaran Rigging Supervisor Mechanical 26-Dec-21 Yes 27-Mar-22 Done 19-Nov-22
1.40 Premnath Prasad Rigger Mechanical 4-Mar-22 Yes 27-Mar-22 Done 19-Feb-23
1.41 Surender Kumar Scaffolder Mechanical 1-Dec-21 Yes 27-Mar-22 Done 3-Jul-22
1.42 Gyan Badur Scaffolder Mechanical 9-Nov-21 Yes 27-Mar-22 Done 19-Nov-22
1.43 Balwiner Masih Dharma Mechanical Helper / Fire Watch / Banksman Mechanical 28-Feb-22 Yes 27-Mar-22 Done 14-Nov-23 Fire Watcher
1.44 Harjinder Singh Mechanical Helper / Fire Watch / Banksman Mechanical 10-Mar-22 Yes 27-Mar-22 Done 28-Nov-22
1.45 Gurdeep Singh Mechanical Helper / Fire Watch / Banksman Mechanical 10-Mar-22 Yes 27-Mar-22 Done 28-Nov-22
1.46 Jitendra Yadav Chandra Mechanical Helper / Fire Watch / Banksman Mechanical 28-Feb-22 Yes 27-Mar-22 Done 14-Nov-23 Fire Watcher
1.47 Rakesh Kumar Painter Mechanical 10-Mar-22 Yes 1-Apr-22 Done 15-Aug-23
1.48 Ajay Shantaram Torqueing Technician Mechanical 6-Mar-22 Yes 30-Mar-22 Required Done
1.49 Don William Torqueing Technician Mechanical 3-Jan-22 Yes 30-Mar-22 Required Done
1.50 Nandlal Bahadur PWHT Technician Mechanical 2-Jan-22 31-Mar-22 Required Done
1.51 Raj Bahadhur PWHT Technician Mechanical 28-Dec-21 31-Mar-22 Required Done
1.52 Vishnu Purushan Purushan NDT Technician Mechanical 18-Dec-21 31-Mar-22 Required Done
1.53 Shoukkathali Muhammed NDT Technician Mechanical 31-Dec-21 31-Mar-22 Required Done
1.54 Muhammed Junaid LD Driver - 31-Jan-22 Yes 21-Mar-22 Done 15-Aug-23
1.55 Sadar Iqbal LD Driver - 12-Jan-22 Yes 21-Mar-22 Done 9-Feb-22
1.56 Sukhjinder Singh Hiab Operator - 26-Dec-21 Yes 29-Mar-22 Done 1-Mar-23
1.57 Sawant Kumar Crane Operator 5-May-22 25-Jun-22
1.58 Kalamuddin Crane Helper 05-05-222 21-Jun-23
1.59 Satwander Singh Trailer Driver 1-Jan-22
.
.
2 BACKUP MAN POWER
2.01 Jayesh Kumar QA/QC (Mechanical) Construction 31-Jan-22 Yes 21-Apr-23
2.02 Vinaya Chandran QA/QC (Civil) Construction 19-Jan-22 Yes 21-Nov-22
2.03 Lathigesh Chirakkara QA/QC (E&I) Construction 26-Dec-21 Yes 8-Oct-23
2.04 Karthikeyan Kasilingam Electrical Technician E&I 14-Nov-21 Yes 19-Feb-22
2.05 Amit Behra    Electrical Technician Electrical 10-May-22 Yes 9-Sep-23
2.06 Prashanth Kumar Instrumentation Technician E&I 4-Jul-22 Yes 1-Mar-23
2.07 Athul PA Instrumentation Technician E&I 4-Jul-22 Yes 22-Jun-24
2.08 Dinesh Kumar Singh    Instrumentation Technician E&I 24-Mar-22 Yes 1-Feb-23
2.09 Joby Mathew Pipe Fabricator Mechanical 14-Nov-21 Yes 9-Jul-23
2.10 Praveen Kumar Pipe Fabricator Mechanical 14-Nov-21 Yes 9-Jul-23
2.11 Saqib Pipe Welder Mechanical 1-Dec-21 Yes 11-Jul-23
2.12 Unaise Scaffolding Inspector Mechanical 20-Dec-21 Yes 15-Aug-23
2.13 Binod Karki Scaffolder Mechanical 20-Dec-21 Yes 19-Feb-23
2.14 Imtiaz Khan Torqueing Technician Mechanical 18-Jan-22 Yes Required
2.15 Jamal Hossan Torqueing Technician Mechanical 10-Jan-22 Yes Required
2.16 Younas LD Driver - 21-Nov-21 Yes 9-Apr-22
2.17 Sadiq Khan Hiab Operator - 18-Nov-21 Yes 27-Mar-22 Done 15-Jan-23
2.17 Sukhdev Singh Trailer Driver - Yes
.
.
3 MAQTA MCR (SMC Modification)
3.01 Muralee OEM Engineer (Aveva) SMC N/A 29-Nov-21 N/A Maqta MCR
3.02 Krishnakumar Mohanan Instrumentation Engineer SMC 31-Jan-22 N/A 29-Nov-21 Done N/A Maqta MCR
.
.

SL. No. EQUIPMENT EQUIPMENT INSPECTION / STATUS NOS CICPA VALIDITY REMARKS
1 VEHICLE & EQUIPMENT
1.01 Pick-up Approved 1 Nos 2-Jan-22
1.02 Coaster Approved 1 Nos 21-Nov-21 CICPA Under Renewal
1.03 Hiab Approved 1 Nos 2-Jan-22 Awaiting Operator Gate Pass
1.04 Crane (100 T) Pending 1 Nos 12-Jun-22 Operator details TBC
1.05 Flat Bed Trailer Approved 1 Nos 2-Jan-22
1.06 Torqueing Machine Pending 2 Nos
1.07 PWHT Machine Approved 1 Nos
1.08 Welding Machine Approved 2 Nos
1.09 Grinding Machine Approved 3 Nos
1.10 Diesel Generator Approved 1 Nos
1.11 Air Compressor 350 CFM Approved 1 Nos
1.12 Hydrotesting Equipments Approved -
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CONTRACT
VENDOR MOBILIZATION PLAN -NO : 5311; FEES
METERING REF.
SPOOL NO : J-8049 WORKS : CRS-402
INSTALLATION
METERING SPOOL INSTALLATION : CRS-402
REVISED REVISED
SL. No. ACTIVITY NAME VENDOR DETAILED ACTIVITY REVISED No. OF REMARKS
VENDOR MOB VENDOR
DAYS
DATE DEMOB DATE

PRE-SHUTDOWN ACTIVITIES
3
1.01 Metering Panel Insaf Sharafudheen Honeywell Internal SAT for Metering Panel 24-Nov-21 27-Nov-21 (26.Nov is Off) Mob & Demob dates revised

1.03 DCS Amritendu Honeywell DCS Modification Pre-shutdown activities (Honeywell) 23-Nov-21 25-Nov-21 3

SHUTDOWN ACTIVITIES
F&G system (06-FS-1D) logic download & network integration, HMI
2.01 F&G Prabhu Muniyandi Rockwell modification (Rockwell) 27-Nov-21 29-Nov-21 3 Actually plan is 28 to 30 Nov '21
RTU software application download, Establish communication from
2.02 RTU Rakesh Kumar Schneider RTU to metering panel & RTU to DCS (Schneider) 28-Nov-21 30-Nov-21 3

2.03 Metering Panel Insaf Sharafudheen Honeywell Establish communication from RTU to metering panel 28-Nov-21 29-Nov-21 2

2.04 DCS Amritendu Honeywell DCS Modification (Honeywell) 28-Nov-21 29-Nov-21 2

2.05 HSSD Riyas Kunjumon Tyco HSSD modification (Tyco) 28-Nov-21 28-Nov-21 1
Dates revised. Vendor already available during the period
2.10 Metering Panel Insaf Sharafudheen Honeywell Metering Panel Testing & SAT (Phase-1) 28-Nov-21 30-Nov-21 3 for MCP-RTU communication establishment

2.11 Metering Panel Insaf Sharafudheen Honeywell Metering Panel Testing & SAT (Phase-2) 5-Dec-21 6-Dec-21 2

2.12 Metering Panel Insaf Sharafudheen Honeywell Test Run 9-Dec-21 12-Dec-21 4 Mob & Demob dates revised

2.13 SMC Muralee Aveva SMC Modification 29-Nov-21 30-Nov-21 2


REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CRS 1440 SYSTEM & SUB SYSTEM DETAILS
SL NO SYSTEM NO SYSTEM DESCRIPTION SUB SYSTEM NO SUB SYSTEM DESCRIPTION REFERENCE DRAWING NO REMARKS

1. 6" line from 556-TP-001 (10"-FG-0519-061440-N) to 556-ME-3200-101 (FLOW


METERING SKID Inlet) 5311-PL-1440-13-20-001_A1
1.6" Inlet line, Outlet line & Vent Line of 556- 2. 6" line from 556-ME-3200-101 (FLOW METERING SKID Outlet) to Split Tee (556-TP-002) 5311-PL-1440-13-60-001_A1
1440-1-PIP-1
ME-3200-101 (FLOW METERING SKID) installed on EXISTING line (10"-FG-0522-061440). 5311-PL-1440-00-30-001_A1
1 1440-1-PIP 2. Hot Tapping 3. 2" Vent line from 556-ME-3200-101 (FLOW METERING SKID 5311-PL-1440-00-20-001_A1
Outlet) to 556-TP-020 (Existing line 557-7003-FL-2"-11377-N).

5311-PL-1440-00-30-001_A1
1440-1-PIP-2 1. Hot Tap 1 No. 10"X6". 912286-5311-PL-1440-1330-52105-086
Total sub sytem: 2 Nos

556-ME-3200-101 5311-PL-1440-00-30-002_A1
(FLOW METERING / GC SKID) 502392-5311-PL-1440-1580-51895-001_1
2 1440-2- MECH 1440-2-MECH-1 556-ME-3200-101 (FLOW METERING / GC SKID) 502392-5311-PL-1440-1580-51895-036
502392-5311-PL-1440-1580-51895-034
SPP-5311-PL-1440-00-01-004_1

Total sub sytem: 1 No


3 1440-3- ELE 1. Earthing System 1440-3-ELE-1 Earthing System 5311-PL-403-1440-16-21-001-A1
Total sub sytem: 1 No
1440-4-INST-1 Metering Control panel 502392-5311-PL-1440-1580-51895-036

502392-5311-PL-1440-1580-51895-001
1440-4-INST-2 556-ME-3200-101 (FLOW METERING SKID) Instruments & Cabling NM-5311-PL-403-1440-15-32-001

502392-5311-PL-1440-1580-51895-036
502392-5311-PL-1440-1580-51895-040
502392-5311-PL-1440-1580-51895-037
1. Metering system 1440-4-INST-3 Gas Chromatograph (556-AIT-3200-101 & 556-AIT-3200-102) 502392-5311-PL-1440-1580-51895-034
2. Fire & Gas system NM-5311-PL-403-1440-15-32-001
4 1440-4-INST 3. Existing System Modification

1440-4-INST-4 Remote Operated Valve (ROV) (556-ROV-3200-51) - After GAS-in SPP-5311-PL-01-15-01-002

1440-4-INST-5 Field F&G Detectors 5311-PL-403-1440-15-31-001-A1


NM-5311-PL-403-1440-15-32-001
1440-4-INST-6 CTMMS
502392-5311-PL-403-1580-51895-059
1440-4-INST-7 SDH
502392-5311-PL-403-1580-51895-003
Total sub sytem: 7 Nos
1440-5-CIV-1 Paving
5311-PL-403-1440-17-21-001-A1
5311-PL-01-17-11-007-A1
1. Paving Works 5311-PL-01-17-11-004-A1
5 1440-5-CIV 2. Foundation Works 1440-5-CIV-2 Foundation
3. Structural Works 5311-PL-01-18-41-101-A1
5311-PL-01-17-11-003-A1
5311-PL-01-17-11-005-A1
1440-5-CIV-3 Structural
5311-PL-01-18-43-102-A1
Total sub sytem: 3 Nos
1440-6-HSE-1 Fire fighting equipment including Fire point shelter 5311-PL-1440-19-02-505-A1
5 1440-6-HSE 1. HSE
1440-6-HSE-2 Escape route, Safety sign, eyewash station & windsocks 5311-PL-1440-19-02-500-A1
Total sub sytem: 2 Nos
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CRS 403 SYSTEM & SUB SYSTEM DETAILS
SL NO SYSTEM NO SYSTEM DESCRIPTION SUB SYSTEM NO SUB SYSTEM DESCRIPTION REFERENCE DRAWING NO REMARKS

5311-PL-403-13-20-001_A1
2" Piping for INLINE FLOW METER Piping (2”-VG-556-0001-61377G-N) shall be installed between Inline 5311-PL-403-13-60-001_A1
1 403-1-PIP 403-1-PIP-1 Ultrasonic Flow Meter (556-FE-701 A/B) and Tie in Point (556-TP-019).
(556-FE-701 A/B) 5311-PL-403-00-30-001_A1
5311-PL-403-00-20-001_A1

Total sub sytem: 1 No


556-FE-701 A/B 5311-PL-403-00-30-002_A1
(INLINE FLOW METER) 502392-5311-PL-403-1580-51895-
2 403-2- MECH 403-2-MECH-1 556-FE-701 A/B (INLINE FLOW METER SKID)
001_1
SPP-5311-PL-403-00-01-004_1
Total sub sytem: 1 No

5311-PL-403-1440-16-33-012-A1
403-3-ELE-1 415V Power Distribution Board (403-EE-PDB-101) 010560-5311-PL-403-1630-52394-002
010560-5311-PL-403-1630-52394-003
010560-5311-PL-403-1630-52394-010
5311-PL-403-1440-16-33-013-A1
1. Power Distribution Board (403-EE- 602154-5311-PL-403-1670-52152-009
PDB-101) 602154-5311-PL-403-1670-52152-007
2. 240V AC UPS System (4033-EE- 403-3-ELE-2 240V AC UPS System (403-EE-ACUPS-101) & Battery system
ACUPS-101) & Battery system
3 403-3-ELE 3. Light and Small Power distribution
board (403-EE-LSPDB-101)
4. 403-3-ELE-3 Light and Small Power distribution board (403-EE-LSPDB-101) 010560-5311-PL-403-1630-52394-006
Lighting System 010560-5311-PL-403-1630-52394-007
5. Lightening & Earthing System 010560-5311-PL-403-1630-52394-010

403-3-ELE-4 Lighting System 5311-PL-403-16-41-001-A1


5311-PL-403-1440-16-33-015-A1
403-3-ELE-5 Lightening & Earthing system 5311-PL-403-1440-16-21-001-A1
Total sub sytem: 5 Nos
502392-5311-PL-403-1580-51895-036
403-4-INST-1 Metering Control panel 5311-PL-403-15-41-001-A1
502392-5311-PL-403-1580-51895-001_1
403-4-INST-2 556-FE-701 A/B (INLINE FLOW METER) Instruments & Cabling NM-5311-PL-403-1440-15-32-001

502392-5311-PL-403-1580-51895-040
502392-5311-PL-403-1580-51895-037
403-4-INST-3 556-AIT-701 (GAS CHROMATOGRAPH) 502392-5311-PL-403-1580-51895-034
NM-5311-PL-403-1440-15-32-001
1. Metering system
2. INLINE FLOW METER
(Instruments & Cabling) 10006742-5311-PL-403-1580-52348-012
3. GAS CHROMATOGRAPH 403-4-INST-4 Fire alarm Control panel NM-5311-PL-403-1440-15-32-001
4. Fire alarm Control panel
4 403-4-INST 5. IES Building F&G Detectors 403-4-INST-5 IES Building F&G Detectors including HSSD NM-5311-PL-403-1440-15-32-001
including HSSD
6. Field F&G Detectors 5311-PL-403-1440-15-31-001-A1
403-4-INST-6 Field F&G Detectors NM-5311-PL-403-1440-15-32-001
7. Inergen system
8. SDH 704877-5311-PL-403-1930-52304-001
9. CTMMS 704877-5311-PL-403-1930-52304-002
403-4-INST-7 Inergen system 704877-5311-PL-403-1930-52304-003
NM-5311-PL-403-1440-15-32-001
1. Metering system
2. INLINE FLOW METER
(Instruments & Cabling)
3. GAS CHROMATOGRAPH
4. Fire alarm Control panel
4 403-4-INST 5. IES Building F&G Detectors
including HSSD
6. Field F&G Detectors
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
7. Inergen system
8. SDH
9. CTMMS

CRS 403 SYSTEM & SUB SYSTEM DETAILS


SL NO SYSTEM NO SYSTEM DESCRIPTION SUB SYSTEM NO SUB SYSTEM DESCRIPTION REFERENCE DRAWING NO REMARKS
403-4-INST-8 SDH 502392-5311-PL-403-1580-51895-003
2. INLINE FLOW METER
(Instruments & Cabling)
3. GAS CHROMATOGRAPH
4. Fire alarm Control panel
4 403-4-INST 5. IES Building F&G Detectors
including HSSD
6. Field F&G Detectors
7. Inergen system
8. SDH
9. CTMMS REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CRS 403 SYSTEM & SUB SYSTEM DETAILS
SL NO SYSTEM NO SYSTEM DESCRIPTION SUB SYSTEM NO SUB SYSTEM DESCRIPTION REFERENCE DRAWING NO REMARKS
502392-5311-PL-01-1590-51895-005
502392-5311-PL-01-1590-51895-004
403-4-INST-9 CTMMS 502392-5311-PL-403-1580-51895-059

Total sub sytem: 9 Nos

750166-5311-PL-403-3430-52198-018
750166-5311-PL-403-3430-52198-008
403-5-HVAC-1 HVAC Control & Power panel 750166-5311-PL-403-3430-52198-013
750166-5311-PL-403-3430-52198-014
750166-5311-PL-403-3430-52198-006
5 403-5-HVAC 1. HVAC system 750166-5311-PL-403-3430-52198-019
750166-5311-PL-403-3430-52198-007

403-5-HVAC-2 HVAC equipment 750166-5311-PL-403-3430-52198-006


750166-5311-PL-403-3430-52198-003
750166-5311-PL-403-3430-52198-005

403-5-HVAC-3 HVAC Ducting & accessories 750166-5311-PL-403-3430-52198-002


750166-5311-PL-403-3430-52198-003
Total sub sytem: 3 Nos
403-6-CIV-1 Paving 5311-PL-403-1440-17-21-001-A1
5311-PL-403-20-11-002-A1
5311-PL-40-17-23-151-A1
5311-PL-
403-17-23-153-A1 5311-
403-6-CIV-2 IES Building PL-403-17-23-152-A1
5311-PL-403-20-11-001-A1
0010000982-5311-GG-01-0000-52424-165

5311-PL-403-17-23-151-A1
5311-PL-01-17-11-007-A1
5311-PL-01-17-11-004-A1
1. Paving Works 5311-PL-01-17-31-510-A1
6 403-6-CIV 2. IES Building Works 403-6-CIV-3 Foundation
5311-PL-01-18-43-101-A1
3. Foundation Works 5311-PL-01-18-41-101-A1
5311-PL-01-
17-11-003-A1
5311-PL-01-17-11-005-A1

5311-PL-403-17-23-151-A1
5311-PL-01-17-11-007-A1
5311-PL-01-17-11-004-A1
403-6-CIV-4 Structure 5311-PL-01-17-31-510-A1
5311-PL-01-18-43-101-A1
5311-PL-01-18-41-101-A1
5311-PL-01-
17-11-003-A1
5311-PL-01-17-11-005-A1
Total sub sytem: 4 Nos
403-7-HSE-1 Fire fighting equipment including Fire point shelter 5311-PL-403-19-02-505-A1
7 403-7-HSE 1. HSE
REPLACEMENT OF OBSOLETE SALES GAS METERING SYSTEMS
CRS 403 SYSTEM & SUB SYSTEM DETAILS
SL NO SYSTEM NO SYSTEM DESCRIPTION SUB SYSTEM NO SUB SYSTEM DESCRIPTION REFERENCE DRAWING NO REMARKS
7 403-7-HSE 1. HSE
403-7-HSE-2 Escape route, Safety sign, eyewash station & windsocks 5311-PL-403-19-02-500-A1
Total sub sytem: 2 Nos
SHUTDOWN CHECKLIST (METERING SPOOL INSTALLATION WORKS) : CRS-402
SHUTDOWN PERIOD : 26 Nov '21 to 05 Dec '21

CHECK LIST F&G SYSTEM RTU HSSD


SL. No.
(CRS-402) (AB-ROCKWELL) (SCHNEIDER) (TYCO)

1 Method Statement

2 HIRA / FRA

3 LOA

4 CICPA Pass

5 HSE Induction

6 H2S (Level II)

7 COVID Test / Requirements

8 Material Availability

9 Laptop / Material Pass

10 Vehicle / Equipment Pass

11 OEM Mobilization

AGP Shutdown Focal Person


12
(Shutdown Manager)

AGP Shutdown Focal Person


13
(Shutdown Planning Incharge)

14 Contractor Shutdown Focal Person

LEGENDS
Completed
In Progress
Not Started
NA - Not Applicable
MATERIAL STATUS (Control System Modification) : CRS-557
S. No. MATERIAL DESCRIPTION QUANTITY UOM PO #
CRS-402
F&G SYSTEM MODIFICATION (ROCK WELL)
1 Nos
2 Nos
3 Nos
4 Nos
5 Nos
6 Nos
7 Nos
HSSD SYSTEM MODIFICATION (TYCO)
1 Nos
2 Nos
3 Nos
4 Nos

5 Electrical Tool Box


METHOD STATEMENT STATUS (Control System Modification) : CRS-403
CRS DESCRIPTION PO # DOC NO. DOC NAME CURRENT STAGE NEXT STAGE PENDING ACTION ACTION PARTY ACTION DATE REMARKS

You might also like