A Name Signature Daily Rate

Ella Crysler L. Limon 420

Specific Tasks
B
a. MS callus induction (be specific as to task per contractor)
b. MS regeneration
Assist in dehulling, surface sterilization, and plating of newly requested seeds;
2 c. Wakimoto (BLB screening)
approximately 1500 seeds.
3 Assist in excision of calli
Assist in preparation of materials for PCR analysis of the backlog from the
4
previous
Assist in season in 7 different
transferring markers
callus cultures into new proliferation media and regeneration
5
media
Assist in maintaining and monitoring callus cultures
Sterilization of laboratory utensils
• Participate in other activities such as cleaning
and disinfection of laboratory and equipment;
Trinidad C. Fernando This is to certify that I have inspected and verified the expected
Immediate Supervisor outputs to be _________% complete as to quantity and
Place of Assignment: CES specifications.
(if outside station)

C Requesting and Recommending Approval:

Roel R. Suralta
Division Head

Date:
1 The official start of this contract shall be the __________________
completion of Box C or the above schedule, whichever comes later. T
Accordingly, full contract payment will be awarded. It may also beJO
2 The above-named person/s hereby attests that s/he is an accredited terminated earlier
of PhilRice andwhen
is notcontractor is notthe
related within able to
third
and that s/he will abide by the policies of PhilRice and recognizes that her/his services will not count as governmen
Reminders (These reminders may be deleted when printing the contract):
1. JO contracting must be in accordance with Memorandum No. 16-392. 2. Daily wage varies per region. Always c
s/he should indicate the actual percentage of completed work to serve as basis for payment. 6. Payment can be pro-r
PHILIPPINE RICE RESEARCH INSTITUTE
JOB CONTRACT

Duration
No. of Working Days
From To
August 30, 2022 September 27,2022 20

Expected Outputs/Ins
a. MS callus induction (be specific as to no. of samples, area of coverage
b. MS regeneration
c. Wakimoto
Assisted (BLB screening)
in dehulling, surface sterilization, and plating of newly requested seeds; approximately 1500 seeds.
Assisted in excision of calli
Assisted in preparation of materials for PCR analysis of the backlog from the previous season in 7
different markers
Assisted in transferring callus cultures into new proliferation media and regeneration media
Assisted in maintaining and monitoring callus cultures
Decontaminated
Other activities: washes and sterilized laboratory utensils
• Participated in other activities such as cleaning and disin
•Assisted in data gathering as per advised by the supervisor.
inspected and verified the expected Inspected by:
% complete as to quantity and
cifications. CRISSA ABEGAIL J. TIBAYAN
INSPECTOR

Approved: Certified Funds Available:

Eduardo Jimmy P. Quilang Mary Grace D. Corpuz


DED/Branch Manager Accountant

Date: __________________ Date: __________________


bove schedule, whichever comes later. The official end of this contract is the schedule stipulated above. However, this contract m
ated earlier
hilRice andwhen
is notcontractor is notthe
related within able to degree
third deliver of
theconsanguinity
required quality and quantity
or affinity to theof output. The contract
requisitioning payment
party and/or directshall be base
supervisor;
his services will not count as government service.
ract):
Daily wage varies per region. Always check the newest DOLE issuance. 3. Dates in Box C must be complete. 4. Always attac
s for payment. 6. Payment can be pro-rated based on an 8-hour workday. 7. Requisitioning party must be a plantilla personnel
PhilRice JO Rev 06 Effectivity Date: 13 February 2019
ESEARCH INSTITUTE
NTRACT
Job Order No. ________________________________

Total Rate
8,400.00

Expected Outputs/Inspection Checklist


e specific as to no. of samples, area of coverage, and other tangible parameters applicable)

sted seeds; approximately 1500 seeds.

og from the previous season in 7


d regeneration media

ed in other activities such as cleaning and disinfection of laboratory and equipment;

AIL J. TIBAYAN
TOR
Certified Funds Available:

Mary Grace D. Corpuz


Accountant

Date: __________________
edule stipulated above. However, this contract may be terminated earlier when expected outputs are fully delivered and services a
yeof output. The contract
requisitioning payment
party and/or directshall be basedthat
supervisor; only on has
s/he the not
satisfactory output delivered.
been previously dismissed from public or private service due to

s in Box C must be complete. 4. Always attach the corresponding BUR prior to approval. 5. Inspector must ensure that the tas
quisitioning party must be a plantilla personnel of PhilRice.
v 06 Effectivity Date: 13 February 2019
________________________________

Project Code
RTF-019-283

pected Outputs/Inspection Checklist


es, area of coverage, and other tangible parameters applicable)

500 seeds.

s cleaning and disinfection of laboratory and equipment;


Date:

wever, this contract may be terminated earlier when expected outputs are fully delivered and services are no longer needed.
yment
or directshall be basedthat
supervisor; only on has
s/he the not
satisfactory output delivered.
been previously dismissed from public or private service due to any administrative offense;

te. 4. Always attach the corresponding BUR prior to approval. 5. Inspector must ensure that the tasks are completed; otherwise
plantilla personnel of PhilRice.
bruary 2019

You might also like